<?xml version="1.0" encoding="UTF-8"?><CONCLUSION NNC="YES" xmlns:fmx="http://opoce" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="http://formex.publications.europa.eu/schema/formex-05.58-20161101.xd"><BIB.CONCLUSION><REF.CASE FILE="n.a."><NO.CASE>C-126/20</NO.CASE></REF.CASE><NO.CELEX>62020CC0126</NO.CELEX><NO.ECLI ECLI="ECLI:EU:C:2021:457">EU:C:2021:457</NO.ECLI><NO.SEQ>0001</NO.SEQ><PAGE.FIRST.ECR>1</PAGE.FIRST.ECR><PAGE.SEQ>1</PAGE.SEQ><PAGE.LAST.ECR>25</PAGE.LAST.ECR><PAGE.TOTAL>25</PAGE.TOTAL></BIB.CONCLUSION><CURR.TITLE><PAGE.HEADER><P><HT TYPE="SC">Opinion of Mr Hogan – Case C‑126/20</HT></P><P><HT TYPE="SC">ExxonMobil Production Deutschland</HT></P></PAGE.HEADER></CURR.TITLE><TITLE><TI><P><HT TYPE="UC">Opinion of Advocate General</HT></P><P><HT TYPE="UC">Hogan</HT></P><P>delivered on <DATE ISO="20210603">3 June 2021</DATE><NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0001"><P>Original language: English.</P></NOTE></P></TI><STI><P>Case C‑126/20</P><P>ExxonMobil Production Deutschland GmbH</P><P>v</P><P>Bundesrepublik Deutschland represented by the Umweltbundesamt (Federal Environmental Office)</P><P><HT TYPE="NORMAL">(Request for a preliminary ruling from the Verwaltungsgericht Berlin (Administrative Court, Berlin, Germany))</HT></P></STI></TITLE><INTERMEDIATE><INDEX IDX.CLOSE=")" SEPARATOR=" – " IDX.OPEN="("><KEYWORD>Reference for a preliminary ruling</KEYWORD><KEYWORD>Scheme for greenhouse gas emission allowance trading</KEYWORD><KEYWORD>Transitional arrangement for the harmonised free allocation of emission allowances</KEYWORD><KEYWORD>Commission Decision 2011/278/EU</KEYWORD><KEYWORD>Article 3(h)</KEYWORD><KEYWORD>Process emissions sub-installation</KEYWORD><KEYWORD>Sulphur recovery</KEYWORD><KEYWORD><QUOT.START CODE="2018" ID="QS0001" REF.END="QE0001"/>Claus process<QUOT.END REF.START="QS0001" CODE="2019" ID="QE0001"/></KEYWORD><KEYWORD>Emission of CO<HT TYPE="SUB">2</HT> contained in natural gas</KEYWORD><KEYWORD>Scope of the concept <QUOT.START CODE="2018" ID="QS0002" REF.END="QE0002"/>process emission sub-installation<QUOT.END REF.START="QS0002" CODE="2019" ID="QE0002"/></KEYWORD><KEYWORD>Use of raw materials containing carbon</KEYWORD><KEYWORD>Hierarchy between the different categories of sub-installations</KEYWORD><KEYWORD>Allocation request not awarded at the end of a trading period</KEYWORD><KEYWORD>Shift to next trading period</KEYWORD></INDEX></INTERMEDIATE><CONTENTS.CONCLUSION><GR.SEQ LEVEL="1"><TITLE><TI><NP><NO.P><HT TYPE="BOLD">I.</HT></NO.P><TXT><HT TYPE="BOLD">Introduction</HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0001"><NO.P>1.</NO.P><TXT>This request for a preliminary ruling from the Verwaltungsgericht Berlin (Administrative Court, Berlin, Germany) principally concerns the scope of what is described as a <QUOT.START CODE="2018" ID="QS0003" REF.END="QE0003"/>process emissions sub-installation<QUOT.END REF.START="QS0003" CODE="2019" ID="QE0003"/> in accordance with Article 3(h)(v) of Commission Decision 2011/278/EU.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0002"><P>Commission Decision of <DATE ISO="20110427">27 April 2011</DATE> determining transitional Union-wide rules for harmonised free allocation of emission allowances pursuant to Article 10a of Directive 2003/87/EC of the European Parliament and of the Council (<REF.DOC.OJ COLL="L" NO.OJ="130" PAGE.FIRST="1" DATE.PUB="2011">OJ 2011 L 130, p. 1</REF.DOC.OJ>).</P></NOTE> This is one of the categories by virtue of which an installation might be allocated emission allowances free of charge for the purposes of Directive 2003/87/EC,<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0003"><P>Directive 2003/87/EC of the European Parliament and of the Council of <DATE ISO="20031013">13 October 2003</DATE> establishing a scheme for greenhouse gas emission allowance trading within the Community and amending Council Directive 96/61/EC (<REF.DOC.OJ COLL="L" NO.OJ="275" PAGE.FIRST="32" DATE.PUB="2003">OJ 2003 L 275, p. 32</REF.DOC.OJ>), as amended by Directive 2009/29/EC of the European Parliament and of the Council of <DATE ISO="20090423">23 April 2009</DATE> amending Directive 2003/87/EC so as to improve and extend the greenhouse gas emission allowance trading scheme of the Community (<REF.DOC.OJ COLL="L" NO.OJ="140" PAGE.FIRST="63" DATE.PUB="2009">OJ 2009 L 140, p. 63</REF.DOC.OJ>).</P></NOTE> which establishes a scheme for greenhouse gas emission allowances for firms trading within the European Union.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0002"><NO.P>2.</NO.P><TXT>While this question is, admittedly, a highly technical one – specifically, whether the emission of carbon dioxide (CO<HT TYPE="SUB">2</HT>) which is naturally released in the course of an industrial process known as the <QUOT.START CODE="2018" ID="QS0004" REF.END="QE0004"/>Claus process<QUOT.END REF.START="QS0004" CODE="2019" ID="QE0004"/> have to be granted emissions allowances free of charge – it is nonetheless one with considerable economic importance. This is exemplified by the fact that ExxonMobil<?PAGE NO="2"?> Production Deutschland GmbH’s (<QUOT.START CODE="2018" ID="QS0005" REF.END="QE0005"/>ExxonMobil<QUOT.END REF.START="QS0005" CODE="2019" ID="QE0005"/>) claim amounts to about 3.5 million certificates with a market value of about EUR 78.5 million for the period of 2013 to 2019.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0004"><P>Figures provided by the Umweltbundesamt (Federal Environmental Office, Germany) during the hearing.</P></NOTE> Before examining the facts and the legal issues which arise, it is, however, first necessary to set forth the relevant legal provisions.</TXT></NP.ECR></GR.SEQ><GR.SEQ LEVEL="1"><TITLE><TI><NP><NO.P><HT TYPE="BOLD">II.</HT></NO.P><TXT><HT TYPE="BOLD">Legal framework</HT></TXT></NP></TI></TITLE><GR.SEQ LEVEL="2"><TITLE><TI><NP><NO.P><HT TYPE="BOLD"><HT TYPE="ITALIC">A.</HT></HT></NO.P><TXT><HT TYPE="BOLD"><HT TYPE="ITALIC">EU law</HT></HT></TXT></NP></TI></TITLE><GR.SEQ LEVEL="3"><TITLE><TI><NP><NO.P><HT TYPE="ITALIC">1.</HT></NO.P><TXT><HT TYPE="ITALIC">Directive 2003/87</HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0003"><NO.P>3.</NO.P><TXT>Directive 2003/87 defines its scope in Article 2(1) which reads:</TXT><P><QUOT.S LEVEL="1"><ALINEA><QUOT.START CODE="2018" ID="QS0006" REF.END="QE0006"/>This Directive shall apply to emissions from the activities listed in Annex I and greenhouse gases listed in Annex II.<QUOT.END REF.START="QS0006" CODE="2019" ID="QE0006"/></ALINEA></QUOT.S></P></NP.ECR><NP.ECR IDENTIFIER="NP0004"><NO.P>4.</NO.P><TXT>Relevant definitions are contained in its Article 3:</TXT><P><QUOT.S LEVEL="1"><ALINEA><LIST TYPE="OTHER"><ITEM><NP><NO.P><QUOT.START CODE="2018" ID="QS0007" REF.END="QE0007"/>(b)</NO.P><TXT><QUOT.START CODE="201C" ID="QS0008" REF.END="QE0008"/>emissions<QUOT.END REF.START="QS0008" CODE="201D" ID="QE0008"/> means the release of greenhouse gases into the atmosphere from sources in an installation;</TXT></NP></ITEM></LIST><P>…</P><LIST TYPE="alpha"><ITEM><NP><NO.P>(e)</NO.P><TXT><QUOT.START CODE="201C" ID="QS0009" REF.END="QE0009"/>installation<QUOT.END REF.START="QS0009" CODE="201D" ID="QE0009"/> means a stationary technical unit where one or more activities listed in Annex I are carried out and any other directly associated activities which have a technical connection with the activities carried out on that site and which could have an effect on emissions and pollution;<QUOT.END REF.START="QS0007" CODE="2019" ID="QE0007"/></TXT></NP></ITEM></LIST></ALINEA></QUOT.S></P></NP.ECR><NP.ECR IDENTIFIER="NP0005"><NO.P>5.</NO.P><TXT>Chapter III of Directive 2003/87 deals with the rules regarding stationary installations. Article 10 thereof states the principle that from 2013 onwards, Member States shall auction all allowances which are not allocated free of charge in accordance with Articles 10a and 10c.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0006"><NO.P>6.</NO.P><TXT>Article 10a is headed <QUOT.START CODE="2018" ID="QS0010" REF.END="QE0010"/>Transitional Community-wide rules for harmonised free allocation<QUOT.END REF.START="QS0010" CODE="2019" ID="QE0010"/>. In the first subparagraph of its first paragraph it provides that the Commission shall adopt Community-wide and fully harmonised implementing measures for the allocation of free allowances.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0007"><NO.P>7.</NO.P><TXT>Whereas Article 10a(11) of Directive 2003/87 provides that the amount of allowances allocated free of charge shall decrease each year with the view to reaching no free allocations in 2027, paragraph 12 of that provision specifies that sectors or subsectors which are exposed to a significant risk of carbon leakage shall not be subject to such a decrease.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0008"><NO.P>8.</NO.P><TXT>Article 10a(13) to (18) of Directive 2003/87 provided for rules on how to determine which sectors or subsectors are considered to be exposed to a significant risk of carbon leakage.</TXT></NP.ECR><?PAGE NO="3"?><NP.ECR IDENTIFIER="NP0009"><NO.P>9.</NO.P><TXT>Article 12 of Directive 2003/87 headed ‘Transfer, surrender and cancellation of allowances provides in its paragraph 3:</TXT><P><QUOT.S LEVEL="1"><ALINEA><QUOT.START CODE="2018" ID="QS0011" REF.END="QE0011"/>Member States shall ensure that, by 30 April each year, the operator of each installation surrenders a number of allowances, … equal to the total emissions from that installation during the preceding calendar year … and that these are subsequently cancelled.<QUOT.END REF.START="QS0011" CODE="2019" ID="QE0011"/></ALINEA></QUOT.S></P></NP.ECR><NP.ECR IDENTIFIER="NP0010"><NO.P>10.</NO.P><TXT>Article 13, dealing with the validity of allowances, provides:</TXT><P><QUOT.S LEVEL="1"><PARAG IDENTIFIER="013.001"><NO.PARAG><QUOT.START CODE="2018" ID="QS0012" REF.END="QE0012"/>1.</NO.PARAG><ALINEA>Allowances issued from <DATE ISO="20130101">1 January 2013</DATE> onwards shall be valid for emissions during periods of eight years beginning on <DATE ISO="20130101">1 January 2013</DATE>.</ALINEA></PARAG><PARAG IDENTIFIER="013.002"><NO.PARAG>2.</NO.PARAG><ALINEA>Four months after the beginning of each period referred to in paragraph 1, allowances which are no longer valid and have not been surrendered and cancelled in accordance with Article 12 shall be cancelled by the competent authority.</ALINEA><ALINEA>…<QUOT.END REF.START="QS0012" CODE="2019" ID="QE0012"/></ALINEA></PARAG></QUOT.S></P></NP.ECR><NP.ECR IDENTIFIER="NP0011"><NO.P>11.</NO.P><TXT>The wording of Article 13 was replaced by Directive 2018/410.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0005"><P>Directive (EU) of the European Parliament and of the Council of <DATE ISO="20180314">14 March 2018</DATE> amending Directive 2003/87/EC to enhance cost-effective emission reductions and low carbon investments, and Decision (EU) 2015/1814 (<REF.DOC.OJ COLL="L" NO.OJ="076" PAGE.FIRST="3" DATE.PUB="2018">OJ 2018 L 76, p. 3</REF.DOC.OJ>).</P></NOTE> It now provides as follows:</TXT><P><QUOT.S LEVEL="1"><ALINEA><QUOT.START CODE="2018" ID="QS0013" REF.END="QE0013"/>Allowances issued from <DATE ISO="20130101">1 January 2013</DATE> onwards shall be valid indefinitely. Allowances issued from <DATE ISO="20210101">1 January 2021</DATE> onwards shall include an indication showing in which ten-year period beginning from <DATE ISO="20210101">1 January 2021</DATE> they were issued, and be valid for emissions from the first year of that period onwards.<QUOT.END REF.START="QS0013" CODE="2019" ID="QE0013"/></ALINEA></QUOT.S></P></NP.ECR></GR.SEQ><GR.SEQ LEVEL="3"><TITLE><TI><NP><NO.P><HT TYPE="ITALIC">2.</HT></NO.P><TXT><HT TYPE="ITALIC">Decision 2011/278</HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0012"><NO.P>12.</NO.P><TXT>Recital 12 of Decision 2011/278 provides as follows:</TXT><QUOT.S LEVEL="1"><CONSID><P><QUOT.START CODE="2018" ID="QS0014" REF.END="QE0014"/>Where deriving a product benchmark was not feasible, but greenhouse gases eligible for the free allocation of emission allowances occur, those allowances should be allocated on the basis of generic fallback approaches. A hierarchy of three fallback approaches has been developed in order to maximise greenhouse gas emission reductions and energy savings for at least parts of the production processes concerned. The heat benchmark is applicable for heat consumption processes where a measurable heat carrier is used. The fuel benchmark is applicable where non-measurable heat is consumed. The heat and fuel benchmark values have been derived based upon the principles of transparency and simplicity, using the reference efficiency of a widely available fuel that can be regarded as second-best in terms of greenhouse gas efficiency, considering energy efficient techniques. For process emissions, emission allowances should be allocated on the basis of historical emissions. …<QUOT.END REF.START="QS0014" CODE="2019" ID="QE0014"/></P></CONSID></QUOT.S></NP.ECR><?PAGE NO="4"?><NP.ECR IDENTIFIER="NP0013"><NO.P>13.</NO.P><TXT>Article 3(h)(iv) and (v) of Decision 2011/278 defines process emission sub-installations as follows:</TXT><P><ALINEA><LIST TYPE="alpha"><ITEM><NP><NO.P>(h)</NO.P><TXT><QUOT.START CODE="2018" ID="QS0015" REF.END="QE0015"/><QUOT.START CODE="201C" ID="QS0016" REF.END="QE0016"/>process emissions sub-installation<QUOT.END REF.START="QS0016" CODE="201D" ID="QE0016"/> means greenhouse gas emissions listed in Annex I to [Directive 2003/87] other than carbon dioxide, which occur outside the system boundaries of a product benchmark listed in Annex I, or carbon dioxide emissions, which occur outside the system boundaries of a product benchmark listed in Annex I, as a result of any of the following activities and emissions stemming from the combustion of incompletely oxidised carbon produced as a result of the following activities for the purpose of the production of measurable heat, non-measurable heat or electricity provided that emissions that would have occurred from the combustion of an amount of natural gas, equivalent to the technically usable energy content of the combusted incompletely oxidised carbon, are subtracted:</TXT><P>…</P><P><LIST TYPE="roman"><ITEM><NP><NO.P>(iv)</NO.P><TXT>chemical syntheses where the carbon bearing material participates in the reaction, for a primary purpose other than the generation of heat;</TXT></NP></ITEM><ITEM><NP><NO.P>(v)</NO.P><TXT>the use of carbon containing additives or raw materials for a primary purpose other than the generation of heat;</TXT></NP></ITEM></LIST></P></NP></ITEM></LIST></ALINEA><ALINEA>…<QUOT.END REF.START="QS0015" CODE="2019" ID="QE0015"/></ALINEA></P></NP.ECR><NP.ECR IDENTIFIER="NP0014"><NO.P>14.</NO.P><TXT>Article 6 of Decision 2011/278 describes the system of sub-installations. The parts relevant in the present context provide:</TXT><P><QUOT.S LEVEL="1"><PARAG IDENTIFIER="006.001"><NO.PARAG><QUOT.START CODE="2018" ID="QS0017" REF.END="QE0017"/>1.</NO.PARAG><ALINEA><P>For the purposes of this Decision, Member States shall divide each installation eligible for the free allocation of emission allowances under Article 10a of [Directive 2003/87] into one or more of the following sub-installations, as required:</P><LIST TYPE="alpha"><ITEM><NP><NO.P>(a)</NO.P><TXT>a product benchmark sub-installation;</TXT></NP></ITEM><ITEM><NP><NO.P>(b)</NO.P><TXT>a heat benchmark sub-installation;</TXT></NP></ITEM><ITEM><NP><NO.P>(c)</NO.P><TXT>a fuel benchmark sub-installation;</TXT></NP></ITEM><ITEM><NP><NO.P>(d)</NO.P><TXT>a process emissions sub-installation.</TXT></NP></ITEM></LIST><P>Sub-installations shall correspond, to the extent possible, to physical parts of the installation.</P><P>For heat benchmark sub-installations, fuel benchmark sub-installations and process emissions sub-installations, Member States shall clearly distinguish … between whether or not the relevant process serves a sector or subsector deemed to be exposed to a significant risk of carbon leakage as determined by Decision 2010/2/EU.</P><P>…</P></ALINEA></PARAG><PARAG IDENTIFIER="006.002"><NO.PARAG>2.</NO.PARAG><ALINEA>The sum of the inputs, outputs and emissions of each sub‑installation shall not exceed the inputs, outputs and total emissions of the installation.<QUOT.END REF.START="QS0017" CODE="2019" ID="QE0017"/></ALINEA></PARAG></QUOT.S></P></NP.ECR><?PAGE NO="5"?><NP.ECR IDENTIFIER="NP0015"><NO.P>15.</NO.P><TXT>Article 7(7) and 8(5) of Decision 2011/278 provide that the Member States must ensure that there are no overlaps between sub‑installations and that there is no double-counting.</TXT></NP.ECR></GR.SEQ><GR.SEQ LEVEL="3"><TITLE><TI><NP><NO.P><HT TYPE="ITALIC">3.</HT></NO.P><TXT><HT TYPE="ITALIC">Regulation No 601/2012</HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0016"><NO.P>16.</NO.P><TXT>As envisaged in Article 14(1) of Directive 2003/87, Commission Regulation (EU) No 601/2012 of <DATE ISO="20120621">21 June 2012</DATE> on the monitoring and reporting of greenhouse gas emissions pursuant to Directive 2003/87/EC of the European Parliament and of the Council<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0006"><P><REF.DOC.OJ COLL="L" NO.OJ="181" PAGE.FIRST="30" DATE.PUB="2012">OJ 2012 L 181, p. 30</REF.DOC.OJ>.</P></NOTE> provides for such rules.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0017"><NO.P>17.</NO.P><TXT>Article 3 of Regulation No 601/2012 contains certain definitions that are missing in either Directive 2003/87 or Decision 2011/278, as for example:</TXT><P><QUOT.S LEVEL="1"><PARAG IDENTIFIER="003.030"><NO.PARAG><QUOT.START CODE="2018" ID="QS0018" REF.END="QE0018"/>(30)</NO.PARAG><ALINEA><QUOT.START CODE="201C" ID="QS0019" REF.END="QE0019"/>process emissions<QUOT.END REF.START="QS0019" CODE="201D" ID="QE0019"/> means greenhouse gas emissions other than combustion emissions occurring as a result of intentional and unintentional reactions between substances or their transformation, including the chemical or electrolytic reduction of metal ores, the thermal decomposition of substances, and the formation of substances for use as product or feedstock;</ALINEA></PARAG><P>…</P><PARAG IDENTIFIER="003.040"><NO.PARAG>(40)</NO.PARAG><ALINEA><QUOT.START CODE="201C" ID="QS0020" REF.END="QE0020"/>inherent CO<HT TYPE="SUB">2</HT><QUOT.END REF.START="QS0020" CODE="201D" ID="QE0020"/> means CO<HT TYPE="SUB">2</HT> which is part of a fuel;</ALINEA><ALINEA>…<QUOT.END REF.START="QS0018" CODE="2019" ID="QE0018"/></ALINEA></PARAG></QUOT.S></P></NP.ECR><NP.ECR IDENTIFIER="NP0018"><NO.P>18.</NO.P><TXT>Article 2 of Regulation No 601/2012 provides:</TXT><P><QUOT.S LEVEL="1"><ALINEA><QUOT.START CODE="2018" ID="QS0021" REF.END="QE0021"/>This Regulation shall apply to the monitoring and reporting of greenhouse gas emissions specified in relation to the activities listed in Annex I to Directive [2003/87]<QUOT.END REF.START="QS0021" CODE="2019" ID="QE0021"/>.</ALINEA></QUOT.S></P></NP.ECR><NP.ECR IDENTIFIER="NP0019"><NO.P>19.</NO.P><TXT>Article 48 of Regulation No 601/2012 dealing with inherent CO<HT TYPE="SUB">2</HT> provides as follows:</TXT><P><QUOT.S LEVEL="1"><PARAG IDENTIFIER="048.001"><NO.PARAG><QUOT.START CODE="2018" ID="QS0022" REF.END="QE0022"/>1.</NO.PARAG><ALINEA>Inherent CO<HT TYPE="SUB">2</HT> which is transferred into an installation, including that contained in natural gas or a waste gas including blast furnace gas or coke oven gas, shall be included in the emission factor for that fuel.</ALINEA><ALINEA>…</ALINEA><ALINEA>However, where inherent CO<HT TYPE="SUB">2</HT> is emitted, or transferred out of the installation to entities not covered by that Directive, it shall be counted as emissions of the installation where it originates.</ALINEA><ALINEA>…<QUOT.END REF.START="QS0022" CODE="2019" ID="QE0022"/></ALINEA></PARAG></QUOT.S></P></NP.ECR></GR.SEQ><?PAGE NO="6"?><GR.SEQ LEVEL="3"><TITLE><TI><NP><NO.P><HT TYPE="ITALIC">4.</HT></NO.P><TXT><HT TYPE="ITALIC">Decision 2015/1814</HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0020"><NO.P>20.</NO.P><TXT>A market stability reserve was established by Decision 2015/1814<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0007"><P>Decision (EU) 2015/1814 of the European Parliament and of the Council of <DATE ISO="20151006">6 October 2015</DATE> concerning the establishment and operation of a market stability reserve for the Union greenhouse gas emission trading scheme and amending Directive 2003/87/EC (<REF.DOC.OJ COLL="L" NO.OJ="264" PAGE.FIRST="1" DATE.PUB="2015">OJ 2015 L 264, p. 1</REF.DOC.OJ>).</P></NOTE> in order to deal with structural supply demand imbalances. Article 1(2), (3) and (5) of Decision 2015/1814 determines which allowances shall be placed in that market reserve. It provides:</TXT><P><QUOT.S LEVEL="1"><PARAG IDENTIFIER="001.002"><NO.PARAG><QUOT.START CODE="2018" ID="QS0023" REF.END="QE0023"/>2.</NO.PARAG><ALINEA>The quantity of 900 million allowances deducted from auctioning volumes during the period 2014‑2016, as determined in Regulation (EU) No 176/2014 pursuant to Article 10(4) of [Directive 2003/87], shall not be added to the volumes to be auctioned in 2019 and 2020 but shall instead be placed in the reserve.</ALINEA></PARAG><PARAG IDENTIFIER="001.003"><NO.PARAG>3.</NO.PARAG><ALINEA>Allowances not allocated to installations pursuant to [provision dealing with a new entrants reserve] and allowances not allocated to installations because of the application of [provisions dealing with the cessation of operations] shall be placed in the reserve in 2020. …</ALINEA></PARAG><P>…</P><PARAG IDENTIFIER="001.005"><NO.PARAG>5.</NO.PARAG><ALINEA>Each year, a number of allowances equal to 12% of the total number of allowances in circulation, … shall be deducted from the volume of allowances to be auctioned by the Member States under Article 10(2) of [Directive 2003/87] and shall be placed in the reserve over a period of 12 months beginning on 1 September of that year, unless the number of allowances to be placed in the reserve would be less than 100 million. …<QUOT.END REF.START="QS0023" CODE="2019" ID="QE0023"/></ALINEA></PARAG></QUOT.S></P></NP.ECR></GR.SEQ></GR.SEQ><GR.SEQ LEVEL="2"><TITLE><TI><NP><NO.P><HT TYPE="BOLD"><HT TYPE="ITALIC">B.</HT></HT></NO.P><TXT><HT TYPE="BOLD"><HT TYPE="ITALIC">German law</HT></HT></TXT></NP></TI></TITLE><GR.SEQ LEVEL="3"><TITLE><TI><NP><NO.P><HT TYPE="ITALIC">1.</HT></NO.P><TXT><HT TYPE="ITALIC">Treibhausgas-Emissionshandelsgesetz (TEHG)</HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0021"><NO.P>21.</NO.P><TXT>The wording of Paragraph 7 subparagraph 2 of the Treibhausgas-Emissionshandelsgesetz (Law on greenhouse gas emissions trading, <QUOT.START CODE="2018" ID="QS0024" REF.END="QE0024"/>TEHG<QUOT.END REF.START="QS0024" CODE="2019" ID="QE0024"/>)<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0008"><P>Gesetz über den Handel mit Berechtigungen zur Emission von Treibhausgasen of <DATE ISO="20110721">21 July 2011</DATE> (BGBl. 2011 I, p. 1475).</P></NOTE> in its version valid in 2011 corresponded to the wording of Article 13 of Directive 2003/87.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0009"><P>Paragraph 7 sub-paragraph 2 of the TEHG was not cited by the referring court. It was mentioned in ExxonMobil’s written submissions though, as having been the basis for the Bundesverwaltungsgericht’s (Federal administrative court, Germany) ruling in its judgment of <DATE ISO="20180426">26 April 2018</DATE> (DE:BVerwG:2018:260418U7C20.16.0). The wording of that provision was amended by Article 1 of the Gesetz zur Anpassung der Rechtsgrundlagen für die Fortentwicklung des Europäischen Emissionshandels of <DATE ISO="20190118">18 January 2019</DATE> (BGBl I S.37) with effect from <DATE ISO="20190125">25 January 2019</DATE>.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0022"><NO.P>22.</NO.P><TXT>Paragraph 9 subparagraph 1 of the TEHG provides:</TXT><P><QUOT.S LEVEL="1"><PARAG IDENTIFIER="009.001"><NO.PARAG><QUOT.START CODE="2018" ID="QS0025" REF.END="QE0025"/>(1)</NO.PARAG><ALINEA>Installation operators shall receive an allocation of free emission allowances in accordance with the principles laid down in Article 10a … of Directive [2003/87] … and with those laid down in Decision [2011/278] …<QUOT.END REF.START="QS0025" CODE="2019" ID="QE0025"/></ALINEA></PARAG></QUOT.S></P></NP.ECR><NP.ECR IDENTIFIER="NP0023"><NO.P>23.</NO.P><TXT>Part 2 of Annex I to the TEHG, entitled <QUOT.START CODE="2018" ID="QS0026" REF.END="QE0026"/>Activities<QUOT.END REF.START="QS0026" CODE="2019" ID="QE0026"/>, lists, in point 1, among the installations whose emissions fall within the scope of that law, <QUOT.START CODE="2018" ID="QS0027" REF.END="QE0027"/>combustion units intended to burn fuel with a total rated thermal input equal to or exceeding 20 [megawatts (MW)] in an installation …<QUOT.END REF.START="QS0027" CODE="2019" ID="QE0027"/>.</TXT></NP.ECR></GR.SEQ><?PAGE NO="7"?><GR.SEQ LEVEL="3"><TITLE><TI><NP><NO.P><HT TYPE="ITALIC">C.</HT></NO.P><TXT><HT TYPE="ITALIC">Zuteilungsverordnung 2020</HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0024"><NO.P>24.</NO.P><TXT>Paragraph 2, point 29(b)(ee) of the Zuteilungsverordnung über Treibhausgas-Emissionsberechtigungen 2020<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0010"><P>Verordnung über die Zuteilung von Treibhausgas-Emissionsberechtigungen in der Handelsperiode 2013 bis 2020 vom <DATE ISO="20110926">26. September 2011</DATE> (BGBl. I S. 1921).</P></NOTE> (Regulation on the allocation of greenhouse gas emission allowances in the 2013 to 2020 trading period; <QUOT.START CODE="2018" ID="QS0028" REF.END="QE0028"/>the ZuV 2020<QUOT.END REF.START="QS0028" CODE="2019" ID="QE0028"/>) contains a definition of a process emission sub-installation that corresponds to that contained in Article 3(h)(v) of Decision 2011/78.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0025"><NO.P>25.</NO.P><TXT>Paragraph 3 of the ZuV 2020 headed <QUOT.START CODE="2018" ID="QS0029" REF.END="QE0029"/>Formation of allocation elements<QUOT.END REF.START="QS0029" CODE="2019" ID="QE0029"/> provides in its first subparagraph:</TXT><P><QUOT.S LEVEL="1"><ALINEA><P><QUOT.START CODE="2018" ID="QS0030" REF.END="QE0030"/>In the application for free allocation of allowances for an installation, all the inputs, outputs and related emissions relevant for the allocation shall be allocated to the following allocation elements in the reference period determined …</P><P><LIST TYPE="ARAB"><ITEM><NP><NO.P>(1)</NO.P><TXT>one or more allocation elements with product emission value in accordance with [a product allocation element],</TXT></NP></ITEM><ITEM><NP><NO.P>(2)</NO.P><TXT>an allocation element with a heat emission value …, in so far as it does not include allocation elements pursuant to point 1,</TXT></NP></ITEM><ITEM><NP><NO.P>(3)</NO.P><TXT>an allocation element with fuel emission value …, in so far as it does not include allocation elements pursuant to points 1 and 2, and</TXT></NP></ITEM><ITEM><NP><NO.P>(4)</NO.P><TXT>an allocation element with process emissions in accordance with Paragraph 2, point 29, in so far as it does not include allocation elements pursuant to points 1 to 3.<QUOT.END REF.START="QS0030" CODE="2019" ID="QE0030"/></TXT></NP></ITEM></LIST></P></ALINEA></QUOT.S></P></NP.ECR></GR.SEQ></GR.SEQ></GR.SEQ><GR.SEQ LEVEL="1"><TITLE><TI><NP><NO.P><HT TYPE="BOLD">III.</HT></NO.P><TXT><HT TYPE="BOLD">The dispute in the main proceedings, the questions referred and the procedure before the Court</HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0026"><NO.P>26.</NO.P><TXT>ExxonMobil operates a natural gas processing installation for the recovery of sulphur in Großenkneten (Germany) (<QUOT.START CODE="2018" ID="QS0031" REF.END="QE0031"/>the installation<QUOT.END REF.START="QS0031" CODE="2019" ID="QE0031"/>). Because this activity involves the combustion of fuels with a total rated thermal input exceeding 20 MW, the installation falls within the ambit of the TEHG,<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0011"><P>Paragraph 2 in conjunction with Annex 1 part 2 TEHG.</P></NOTE> which transposes Directive 2003/87<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0012"><P>The relevant provision of that directive is Article 2(1), read in conjunction with Annex I.</P></NOTE> into national law.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0027"><NO.P>27.</NO.P><TXT>That installation consists, in particular, of a sulphur recovery facility (comprising Claus process facilities, a steam super heater, a steam boiler and a gas engine facility), natural gas desulphurisation (purification) and natural gas dehydration facilities, waste gas purification facilities and emergency flaring facilities. The Claus process facilities are the main source of the CO<HT TYPE="SUB">2</HT> emissions.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0028"><NO.P>28.</NO.P><TXT>The installation processes natural gas recovered from natural sources which consists of a high concentration of hydrogen sulphide (H<HT TYPE="SUB">2</HT>S) as well as of water vapour (H<HT TYPE="SUB">2</HT>O), methane (CH<HT TYPE="SUB">4</HT>) and CO<HT TYPE="SUB">2</HT>. Due to the high level of H<HT TYPE="SUB">2</HT>S present in the natural gas, this is also called <QUOT.START CODE="2018" ID="QS0032" REF.END="QE0032"/>sour gas<QUOT.END REF.START="QS0032" CODE="2019" ID="QE0032"/>. The CO<HT TYPE="SUB">2</HT>, like the other components, is naturally present in the raw gas occurring in the subsoil. Its<?PAGE NO="8"?> amount can vary depending on the borehole and deposit but is, according to ExxonMobil,<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0013"><P>This was not contested by any of the other parties.</P></NOTE> present in all European natural gas deposits. In order for the gas to correspond to the quality prescribed by the network operator, CO<HT TYPE="SUB">2</HT> and other natural components have to be partially removed from the natural gas prior to its delivery to the transmission network.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0029"><NO.P>29.</NO.P><TXT>Before proceeding further, it is necessary briefly to describe the Claus process which is at the heart of these proceedings. This is a multi-step gas desulphurising process named after its German inventor and it has been the industry standard ever since the grant of a British patent for this purpose in 1883. As a result of the application of this chemical process, sulphur is recovered from the gaseous hydrogen sulphide found in raw natural gas. Critically, however, CO<HT TYPE="SUB">2</HT> is released as a natural by-product of the chemical process without itself being involved in the series of chemical reactions which themselves produce the sulphur.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0030"><NO.P>30.</NO.P><TXT>In the Großenkneten natural gas processing plant, sour gas is purified by chemical absorption with a solvent (sulfinol process). The solvent is regenerated and the H<HT TYPE="SUB">2</HT>S released is converted into pure liquid sulphur in Claus plants. The CO<HT TYPE="SUB">2</HT> removed from the sour gas, which is inherently present therein, is then discharged into the atmosphere via a chimney. The CO<HT TYPE="SUB">2</HT> does not take part in the Claus chemical reaction leading to the recovery of the elemental sulphur.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0014"><P>Although ExxonMobil points out in its response that it fulfils an important operational task in the Claus process as a non-inflammable gas with a temperature regulation function for the technically necessary control of the operating temperature. This was, however, contested by the Umweltbundesamt (Federal Environmental Office, Germany).</P></NOTE> The heat produced during the thermal step is captured in a waste heat boiler and used in the installation.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0031"><NO.P>31.</NO.P><TXT>ExxonMobil made a request for free of charge emission allowances in respect of the installation. This request was based on different apportionments of the various benchmarks. By its decision of <DATE ISO="20140217">17 February 2014</DATE> the Deutsche Emissionshandelsstelle (German Emission Allowance Trading Authority; <QUOT.START CODE="2018" ID="QS0033" REF.END="QE0033"/>the DEHSt<QUOT.END REF.START="QS0033" CODE="2019" ID="QE0033"/>) allocated to ExxonMobil free of charge <FT TYPE="NUMBER">4216048</FT> emission allowances for the trading period running from 2013 until 2020. This allocation was based, in part, on the application of the heat benchmark<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0015"><P>For the use of the heat captured in the waste heat boiler that is used in the installation.</P></NOTE> and, in part, on the application of the fuel benchmark, with the risk of carbon leakage being taken into account. The DEHSt refused, however, to allocate to ExxonMobil free emission allowances which the latter had applied for in respect of process emissions. It justified this refusal on the basis that the CO<HT TYPE="SUB">2</HT> emissions did not result from the Claus process but rather that the CO<HT TYPE="SUB">2</HT> was already contained in the raw material used for the process. It is this particular refusal which gives rise to the present proceedings.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0032"><NO.P>32.</NO.P><TXT>The objections that had been lodged by ExxonMobil in respect of that decision were dismissed by the DEHSt’s decision of <DATE ISO="20191007">7 October 2019</DATE>.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0016"><P>The lapse of time between ExxonMobil’s objection lodged on <DATE ISO="20140312">12 March 2014</DATE> and its dismissal by the DEHSt is due to the stay in proceedings pending the Court’s judgment in the Case <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">ExxonMobil Production Deutschland</HT></NAME.CASE> (<NO.CASE>C‑682/17</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2019:518">EU:C:2019:518</NO.ECLI></REF.DOC.ECR>; <QUOT.START CODE="2018" ID="QS0034" REF.END="QE0034"/> Case C‑682/17<QUOT.END REF.START="QS0034" CODE="2019" ID="QE0034"/>) which was handed down on <DATE ISO="20190620">20 June 2019</DATE>. The case concerned a different natural gas processing installation using the Claus process, also operated by ExxonMobil.</P></NOTE> In this decision the DEHSt reiterated that an allocation applying the process benchmark according to the second alternative of Paragraph 2, point 29(b)(ee) of the ZuV 2020 could not be granted because the CO<HT TYPE="SUB">2</HT> is merely an associated gas which was released as an incidental by-product of the process rather than one participating in the Claus chemical reaction itself. It followed therefore that the CO<HT TYPE="SUB">2</HT> which is emitted through a chimney into the atmosphere at the end of the Claus process did not qualify for an allocation of emission certificates free of charge.</TXT></NP.ECR><?PAGE NO="9"?><NP.ECR IDENTIFIER="NP0033"><NO.P>33.</NO.P><TXT>ExxonMobil is pursuing its claim by an action brought on <DATE ISO="20191108">8 November 2019</DATE> before the Verwaltungsgericht Berlin (Administrative Court, Berlin, Germany, <QUOT.START CODE="2018" ID="QS0035" REF.END="QE0035"/>the referring court<QUOT.END REF.START="QS0035" CODE="2019" ID="QE0035"/>).</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0034"><NO.P>34.</NO.P><TXT>The applicants in Case C‑682/17 and in the present case are identical. The installation at issue in the present case is not, however, an electricity generator within the meaning of Article 3(u) of Directive 2003/87.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0017"><P>According to the referring court, ExxonMobil only started to generate electric energy for sale to third parties in the summer of 2014 which was after the DEHSt had issued its decision.</P></NOTE> Furthermore, according to the referring court, the electricity generated by ExxonMobil in its Großenkneten plant is generated by means of high efficiency cogeneration and would therefore not be generally excluded from the free allocation of emission certificates (Article 10a(4) of Directive 2003/87). As this had not been true of the installation at issue in Case C‑682/17, the Court had – already on that ground – decided that ExxonMobil was not entitled to the free allocation of allowances for that plant. This series of findings rendered an answer to the following questions superfluous. Questions 3 with sub-questions (a) and (b) and 4 of Case C‑682/17 have now been asked once again by the referring court in questions 1 to 4 of the present case.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0035"><NO.P>35.</NO.P><TXT>In the light of the above considerations, the referring court has decided to stay the proceedings and to refer the following questions to the Court of Justice for a preliminary ruling:</TXT><QUOT.S LEVEL="1"><LIST TYPE="OTHER"><ITEM><NP><NO.P><QUOT.START CODE="2018" ID="QS0036" REF.END="QE0036"/>(1)</NO.P><TXT>Does the CO<HT TYPE="SUB">2</HT> released into the atmosphere as part of the processing of natural gas (in the form of sour gas) in the <QUOT.START CODE="201C" ID="QS0037" REF.END="QE0037"/>Claus process<QUOT.END REF.START="QS0037" CODE="201D" ID="QE0037"/>, by means of the CO<HT TYPE="SUB">2</HT> inherent in natural gas being separated from the gas mixture, constitute an emission which, for the purposes of the first sentence of Article 3(h) of [Decision 2011/278], occurs as a result of the process referred to in Article 3(h)(v)?</TXT></NP></ITEM><ITEM><NP><NO.P>(2)</NO.P><TXT>For the purposes of the first sentence of Article 3(h) of [Decision 2011/278], can CO<HT TYPE="SUB">2</HT> emissions occur <QUOT.START CODE="201C" ID="QS0038" REF.END="QE0038"/>as a result of<QUOT.END REF.START="QS0038" CODE="201D" ID="QE0038"/> a process in which the CO<HT TYPE="SUB">2</HT> inherent in the raw material is released into the atmosphere, even though the process taking place does not give rise to additional CO<HT TYPE="SUB">2</HT>, or does that provision make it mandatory for the CO<HT TYPE="SUB">2</HT> released into the atmosphere to occur for the first time as a result of that process?</TXT></NP></ITEM><ITEM><NP><NO.P>(3)</NO.P><TXT>Is a carbon-containing raw material <QUOT.START CODE="201C" ID="QS0039" REF.END="QE0039"/>used<QUOT.END REF.START="QS0039" CODE="201D" ID="QE0039"/> within the meaning of Article 3(h)(v) of [Decision 2011/278] where, in the <QUOT.START CODE="201C" ID="QS0040" REF.END="QE0040"/>Claus process<QUOT.END REF.START="QS0040" CODE="201D" ID="QE0040"/>, the naturally occurring natural gas is used to produce sulphur and, in the course of that procedure, the CO<HT TYPE="SUB">2</HT> inherent in the natural gas is released into the atmosphere, even though the CO<HT TYPE="SUB">2</HT> inherent in the natural gas does not play a part in the chemical reaction taking place in that process, or does the term <QUOT.START CODE="201C" ID="QS0041" REF.END="QE0041"/>use<QUOT.END REF.START="QS0041" CODE="201D" ID="QE0041"/> make it mandatory for the carbon to play a part in, or indeed be essential to, the chemical reaction taking place?</TXT></NP></ITEM><ITEM><NP><NO.P>(4)</NO.P><TXT>If Questions 1 to 3 are answered in the affirmative:</TXT><P>On the basis of which benchmark is the allocation of free emission allowances to be carried out where an installation subject to the emission trading scheme satisfies both the defining conditions of a heat benchmark sub-installation and the defining conditions of a process emissions sub-installation? Does entitlement to an allocation on the basis of the heat benchmark take priority over entitlement to an allocation for process emissions or does entitlement to an allocation for process emissions take precedence over the heat benchmark and the fuel benchmark because it is more specific to the case in question?</P></NP></ITEM><?PAGE NO="10"?><ITEM><NP><NO.P>(5)</NO.P><TXT>If Questions 1 to 4 are answered in the affirmative:</TXT><P>Can entitlements to a further free allocation of emission allowances for the third trading period be met after the end of the third trading period with allowances of the fourth trading period where the existence of the allowance entitlement is established by a court only after expiry of the third trading period, or do allowance entitlements that have not yet been met lapse on expiry of the third trading period?<QUOT.END REF.START="QS0036" CODE="2019" ID="QE0036"/></P></NP></ITEM></LIST></QUOT.S></NP.ECR><NP.ECR IDENTIFIER="NP0036"><NO.P>36.</NO.P><TXT>ExxonMobil, the Umweltbundesamt (Federal Environmental Office, Germany)<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0018"><P>The Federal Republic of Germany is a party to the proceedings before the referring court because the decision that is being challenged has been taken by the DEHSt which is placed in the Federal Environmental Office. The Federal Environmental Office represents the Federal Republic of Germany in its role as a party in the main proceedings. It is the central environmental agency of the Federal Republic of Germany.</P></NOTE> – in response to written questions by the Court – the German Government<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0019"><P>Acting as a Member State and represented by its Bundesministerium für Wirtschaft und Energie (Federal Ministry for Economic Affairs and Energy).</P></NOTE> and the Commission lodged written observations before the Court and were represented at the hearing on <DATE ISO="20210224">24 February 2021</DATE>.</TXT></NP.ECR></GR.SEQ><GR.SEQ LEVEL="1"><TITLE><TI><NP><NO.P><HT TYPE="BOLD">IV.</HT></NO.P><TXT><HT TYPE="BOLD">Assessment</HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0037"><NO.P>37.</NO.P><TXT>By its first to third questions the referring court asks in essence whether the release of CO<HT TYPE="SUB">2</HT> into the atmosphere which is inherent in the raw material used for the manufacture of a product and which occurs outside the system boundaries of a product benchmark can be regarded as a <QUOT.START CODE="2018" ID="QS0042" REF.END="QE0042"/>process emissions sub-installation<QUOT.END REF.START="QS0042" CODE="2019" ID="QE0042"/> as per Article 3(h)(v) of Decision 2011/278 when the CO<HT TYPE="SUB">2</HT> in question does not form part of the chemical reaction whereby that product is manufactured. As all three questions focus on different aspects of the wording of Article 3(h)(v) of Decision 2011/278 it is convenient to deal with them together.</TXT></NP.ECR><GR.SEQ LEVEL="2"><TITLE><TI><NP><NO.P><HT TYPE="BOLD"><HT TYPE="ITALIC">A.</HT></HT></NO.P><TXT><HT TYPE="BOLD"><HT TYPE="ITALIC">Preliminary Observations: application of the emission allowance trading scheme to the sulphur recovery process</HT></HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0038"><NO.P>38.</NO.P><TXT>These questions presuppose, however, that emissions of CO<HT TYPE="SUB">2</HT> that are inherent in the natural gas are in fact covered by the emission allowance trading scheme. At first glance, it seems surprising to be dealing with this question at all as the Court already found in its judgment in Case C‑682/17 which also dealt with a Claus process installation <QUOT.START CODE="2018" ID="QS0043" REF.END="QE0043"/>that an installation such as that at issue in the main proceedings falls within the scope of Directive 2003/87 and, therefore, of the emission allowance trading scheme established by it, without it mattering whether or not the CO<HT TYPE="SUB">2</HT> from that installation’s activity is present naturally in the raw material processed by it<QUOT.END REF.START="QS0043" CODE="2019" ID="QE0043"/>.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0020"><P>Paragraph 58.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0039"><NO.P>39.</NO.P><TXT>This judgment notwithstanding, the German Government as well as the Commission argue that the emission allowance trading scheme only applies to the greenhouse gas emissions caused by the combustion – which are not at issue here – and not to those resulting from the CO<HT TYPE="SUB">2</HT> which is inherent in the natural gas and which is emitted as a natural by-product at the end of the sulphur recovery process without itself having been involved in the combustion process. They argue that those two activities should be dealt with separately.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0021"><P>It is nevertheless somewhat surprising that, although contending for this, they do not appear to engage in their argument with the Court’s judgment in Case C‑682/17.</P></NOTE></TXT></NP.ECR><?PAGE NO="11"?><NP.ECR IDENTIFIER="NP0040"><NO.P>40.</NO.P><TXT>In light of the above, I would like to retrace the Court’s reasoning in Case C‑682/17 without necessarily discussing the same arguments once again. This seems appropriate given that the parties seem to agree that the installations in both cases are comparable.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0041"><NO.P>41.</NO.P><TXT>In Case C‑682/17 the Court considered the requirements of Article 2(1) of Directive 2003/87. It is this provision which defines the scope of that directive and thus by extension the applicability of the greenhouse gas emission allowance trading scheme. The directive applies by virtue of that provision to emissions of greenhouse gases listed in Annex II to that directive – CO<HT TYPE="SUB">2</HT> is one of the emissions listed – if those emissions stem <QUOT.START CODE="2018" ID="QS0044" REF.END="QE0044"/>from the activities listed in Annex I<QUOT.END REF.START="QS0044" CODE="2019" ID="QE0044"/>. One of those activities is the <QUOT.START CODE="2018" ID="QS0045" REF.END="QE0045"/>combustion of fuels in installations with a total rated thermal input exceeding 20 MW …<QUOT.END REF.START="QS0045" CODE="2019" ID="QE0045"/>.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0022"><P>The exceptions for installations for the incineration of hazardous or municipal waste are not at issue here.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0042"><NO.P>42.</NO.P><TXT>The Court then found, at paragraphs 47 to 53 of that judgment, that the wording of Article 2(1) and Article 3(b) of Directive 2003/87 – the latter defines the term <QUOT.START CODE="2018" ID="QS0046" REF.END="QE0046"/>emissions<QUOT.END REF.START="QS0046" CODE="2019" ID="QE0046"/> – did not require that the greenhouse gas emitted <HT TYPE="ITALIC">must itself be produced in the course of the activities listed in Annex I</HT>. The Court found support for this opinion in Article 48(1) of Regulation No 601/2012 concerned with the monitoring and reporting of emissions pursuant to Directive 2003/87. It provides that inherent CO<HT TYPE="SUB">2</HT>, as defined in Article 3(40) of that regulation, must, when it is contained in natural gas, be included in the emission factor for that fuel. The Court also relied on the objective of Directive 2003/87, namely promoting the reductions of greenhouse gas emissions in a cost-effective and economically efficient manner.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0023"><P>Ibid. paragraphs 54 and 56.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0043"><NO.P>43.</NO.P><TXT>The result of that reasoning is that operators of Claus process facilities like the one at issue here have to surrender a number of emission allowances that, according to Article 12(3) of Directive 2003/87, <HT TYPE="ITALIC">must be equal to the total emissions from that installation</HT>. The term <QUOT.START CODE="2018" ID="QS0047" REF.END="QE0047"/>installation<QUOT.END REF.START="QS0047" CODE="2019" ID="QE0047"/> is defined in Article 3(e) of Directive 2003/87 as a <QUOT.START CODE="2018" ID="QS0048" REF.END="QE0048"/>stationary technical unit where one or more activities listed in Annex I are carried out and any other directly associated activities which have a technical connection with the activities carried out on that site and which could have an effect on emissions and pollution<QUOT.END REF.START="QS0048" CODE="2019" ID="QE0048"/>. This definition opens the possibility to the inclusion of a separate unit if activities that are carried out there are associated with and have a technical connection to the installation concerned.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0024"><P>See judgment of <REF.DOC.ECR><DATE ISO="20160609">9 June 2016</DATE>, <NAME.CASE><HT TYPE="ITALIC">Elektriciteits Produktiemaatschappij Zuid-Nederland EPZ</HT></NAME.CASE> (<NO.CASE>C‑158/15</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2016:422">EU:C:2016:422</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0029">29</REF.NP.ECR></REF.DOC.ECR>).</P></NOTE> On the other hand, the argument by the German Government and the Commission if one installation carries out several activities – as in the present case, the combustion of fuels with a rated thermal input exceeding 20 MW which is listed in Annex I as well as the recovery of sulphur which is not listed in Annex I – the activity that is not listed in Annex I is not subject to the emission allowance trading scheme,<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0025"><P>Different in this respect to the Opinion of Advocate General Saugmandsgaard Øe in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">ExxonMobil Production Deutschland</HT></NAME.CASE> (<NO.CASE>C‑682/17</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2019:167">EU:C:2019:167</NO.ECLI>, point <REF.NP.ECR REF="NP0074">74</REF.NP.ECR></REF.DOC.ECR>).</P></NOTE> is not covered by that wording.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0044"><NO.P>44.</NO.P><TXT>In <HT TYPE="ITALIC">Trinseo Deutschland</HT>,<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0026"><P>Judgment of <REF.DOC.ECR><DATE ISO="20180228">28 February 2018</DATE> (<NO.CASE>C 577/16</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2018:127">EU:C:2018:127</NO.ECLI></REF.DOC.ECR>).</P></NOTE> a case where the applicant’s installation did not cause emissions listed in Annex II to Directive 2003/87 itself, although its activity was listed in Annex I to that directive – and thus, in some ways, constitutes the reverse of the present case – the Commission had argued that <QUOT.START CODE="2018" ID="QS0049" REF.END="QE0049"/>indirect emissions<QUOT.END REF.START="QS0049" CODE="2019" ID="QE0049"/> from the production of heat should be considered for the purposes of the application of the emission allowance trading scheme, thus, arguing in favour of<?PAGE NO="12"?> an interpretation of emissions detached from the installation. The Court nevertheless adhered to the wording of Article 3(b) of Directive 2003/87 that links the emissions to the installation. For my part, I see no reason to deviate from that clear wording.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0045"><NO.P>45.</NO.P><TXT>In so far as Article 6 of Decision 2011/278 divides installations into sub-installations, this is merely an analytical exercise for the purpose of applying benchmarks. The provision states clearly that this is only done for the purposes of Decision 2011/278. The language of the provision which specifies that <HT TYPE="ITALIC">installations</HT> shall be divided into <HT TYPE="ITALIC">sub-installations</HT> also makes it clear that that division does not in any way affect the notion of <QUOT.START CODE="2018" ID="QS0050" REF.END="QE0050"/>installation<QUOT.END REF.START="QS0050" CODE="2019" ID="QE0050"/> as defined in Article 3(e) of Directive 2003/87.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0046"><NO.P>46.</NO.P><TXT>In the light of those considerations, I take the view that, in line with the findings of the Court in Case C‑682/17, the emission allowance trading scheme does not only apply to the CO<HT TYPE="SUB">2</HT> emissions resulting from the combustion process, but it also applies to those from the sulphur recovery process taking place in the same installation.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0047"><NO.P>47.</NO.P><TXT>In so far as the Commission argues that the inclusion of activities in the scheme that have not been included in Annex I would be contrary to the decision of the EU legislature only to include activities in the scheme that have a particular potential for the cost effective reduction of greenhouse gases,<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0027"><P>The Commission relies in its argument on the Court’s judgment of <REF.DOC.ECR><DATE ISO="20180517">17 May 2018</DATE>, <NAME.CASE><HT TYPE="ITALIC">Evonik Degussa</HT></NAME.CASE> (<NO.CASE>C‑229/17</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2018:323">EU:C:2018:323</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0042">42</REF.NP.ECR></REF.DOC.ECR>). In that judgment, the Court, however, only requires <QUOT.START CODE="2018" ID="QS0051" REF.END="QE0051"/>some potential to reduce greenhouse gas emissions<QUOT.END REF.START="QS0051" CODE="2019" ID="QE0051"/>, not a <HT TYPE="ITALIC">particular potential</HT> for a cost-efficient reduction of greenhouse gases.</P></NOTE> the Court has already pointed out in Case C‑682/17 that <QUOT.START CODE="2018" ID="QS0052" REF.END="QE0052"/>even though CO<HT TYPE="SUB">2</HT> is present in the composition of the sour gas, the activity of combustion of fuels carried out by an installation such as the installation at issue in the main proceedings, for the purpose of natural gas desulphurisation and sulphur recovery under the Claus process, has some potential to reduce CO<HT TYPE="SUB">2</HT> emissions since the CO<HT TYPE="SUB">2</HT> content of the sour gas is liable to vary according to the deposit. Contrary to ExxonMobil’s submissions, it is irrelevant in that regard that the CO<HT TYPE="SUB">2</HT> content is not systematically foreseeable<QUOT.END REF.START="QS0052" CODE="2019" ID="QE0052"/>.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0028"><P>Paragraph 57. See also Opinion of Advocate General Kokott in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">Elektriciteits Produktiemaatschappij Zuid-Nederland EPZ</HT></NAME.CASE> (<NO.CASE>C‑158/15</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2016:139">EU:C:2016:139</NO.ECLI>, point <REF.NP.ECR REF="NP0039">39</REF.NP.ECR></REF.DOC.ECR>) who pointed out that <QUOT.START CODE="2018" ID="QS0053" REF.END="QE0053"/>included in the market mechanism is a measure whereby certain activities will in some circumstances cease completely if they are no longer competitive due to the cost of their unavoidable emissions<QUOT.END REF.START="QS0053" CODE="2019" ID="QE0053"/>, a rationale which might apply to certain deposits in the present case, if the natural content of CO<HT TYPE="SUB">2</HT> is particularly high.</P></NOTE></TXT></NP.ECR></GR.SEQ><GR.SEQ LEVEL="2"><TITLE><TI><NP><NO.P><HT TYPE="BOLD"><HT TYPE="ITALIC">B.</HT></HT></NO.P><TXT><HT TYPE="BOLD"><HT TYPE="ITALIC">Questions 1 to 3: Does the CO<HT TYPE="SUB">2</HT> released into the atmosphere as part of the conditioning of sour gas in the Claus process qualify as a <QUOT.START CODE="2018" ID="QS0054" REF.END="QE0054"/>process emission<QUOT.END REF.START="QS0054" CODE="2019" ID="QE0054"/> for the purposes of Article 3(h)(v) of Decision 2011/278?</HT></HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0048"><NO.P>48.</NO.P><TXT>While the German Government represented by the Federal Ministry for Economic Affairs and Energy and the Commission do not agree with the Federal Environmental Office on whether the CO<HT TYPE="SUB">2</HT> released into the atmosphere as part of the sulphur recovery process is covered by the emission allowance trading scheme, those three parties agree that no free allowances should be awarded for those emissions. It should, however, be kept in mind that any argument of the German Government and the Commission to the effect that those emissions cannot be considered as process emissions covered by Article 3(h)(v) of Decision 2011/278 is made against the background that, according to their submissions, ExxonMobil is not obliged to surrender any allowances in respect of those emissions.</TXT></NP.ECR><?PAGE NO="13"?><NP.ECR IDENTIFIER="NP0049"><NO.P>49.</NO.P><TXT>The first three questions of the referring court deal with different elements of Article 3(h)(v) of Decision 2011/278 defining a <QUOT.START CODE="2018" ID="QS0055" REF.END="QE0055"/>process emissions sub-installation<QUOT.END REF.START="QS0055" CODE="2019" ID="QE0055"/>.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0029"><P>On the other hand, Decision 2011/278 does not define a <QUOT.START CODE="2018" ID="QS0056" REF.END="QE0056"/>process emission<QUOT.END REF.START="QS0056" CODE="2019" ID="QE0056"/> as such. I will return to this later.</P></NOTE> In order for this provision to apply, the following constituent elements have to be fulfilled: there must be (i) CO<HT TYPE="SUB">2</HT> emissions, which (ii) occur outside the system boundaries of a product benchmark listed in Annex I and, finally, (iii) as a result of the <QUOT.START CODE="2018" ID="QS0057" REF.END="QE0057"/>use of carbon containing … raw materials for a primary purpose other than the generation of heat<QUOT.END REF.START="QS0057" CODE="2019" ID="QE0057"/>. There is agreement between the parties that the first two of these requirements are fulfilled. Emission of (the inherent) CO<HT TYPE="SUB">2</HT> takes place as a natural by-product at the end of the sulphur recovery process, a process for which there is no product benchmark.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0030"><P>The CO<HT TYPE="SUB">2</HT> emissions resulting from the combustion are subject to allocations under the heat benchmark according to Article 3(c) of Decision 2011/278.</P></NOTE> There is accordingly disagreement about the third requirement.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0050"><NO.P>50.</NO.P><TXT>The referring court looks at three aspects of that third criterion: first, whether the emission of CO<HT TYPE="SUB">2</HT> which is inherent can be considered <QUOT.START CODE="2018" ID="QS0058" REF.END="QE0058"/>a result<QUOT.END REF.START="QS0058" CODE="2019" ID="QE0058"/> of any further process and second whether such inherent CO<HT TYPE="SUB">2</HT> can be considered to be <QUOT.START CODE="2018" ID="QS0059" REF.END="QE0059"/>used<QUOT.END REF.START="QS0059" CODE="2019" ID="QE0059"/> in a process if it does not take part in the chemical reaction. A third question that is being discussed is whether we are dealing with a <QUOT.START CODE="2018" ID="QS0060" REF.END="QE0060"/>carbon containing raw material<QUOT.END REF.START="QS0060" CODE="2019" ID="QE0060"/>. Proponents of a negative answer to that third question appear to argue that the raw material <QUOT.START CODE="2018" ID="QS0061" REF.END="QE0061"/>used<QUOT.END REF.START="QS0061" CODE="2019" ID="QE0061"/> in the process is not the sour gas but rather the hydrogen sulphide which does not contain any CO<HT TYPE="SUB">2</HT>. There is agreement, however, that the primary purpose of the sulphur recovery process is not the generation of heat.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0051"><NO.P>51.</NO.P><TXT>According to the Court’s established case-law, the interpretation of a provision of EU law requires that, in addition to the wording of the relevant provision – which, <QUOT.START CODE="2018" ID="QS0062" REF.END="QE0062"/>having reference to the conventional principles of interpretation, is invariably the starting point and at the same time the limit of any interpretation<QUOT.END REF.START="QS0062" CODE="2019" ID="QE0062"/><NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0031"><P>See to that effect the Opinion of Advocate General Trstenjak in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">Agrana Zucker</HT></NAME.CASE> (<NO.CASE>C‑33/08</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2009:99">EU:C:2009:99</NO.ECLI>, point <REF.NP.ECR REF="NP0037">37</REF.NP.ECR></REF.DOC.ECR>).</P></NOTE> – consideration must also be given to its context and the objectives pursued by the rules of which it forms part.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0032"><P>See to that effect, for example, Case C-628/17, paragraph 71 and the case-law cited.</P></NOTE></TXT></NP.ECR><GR.SEQ LEVEL="3"><TITLE><TI><NP><NO.P><HT TYPE="ITALIC">1.</HT></NO.P><TXT><HT TYPE="ITALIC">Literal interpretation</HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0052"><NO.P>52.</NO.P><TXT>Starting with the wording of Article 3(h)(v) of Decision 2011/278: CO<HT TYPE="SUB">2</HT> emissions must be the result of the use of carbon containing additives or raw materials for a primary purpose other than the generation of heat. Given that <HT TYPE="ITALIC">carbon dioxide</HT> <HT TYPE="ITALIC">emissions</HT> must be the result of the process, rather than the production of <HT TYPE="ITALIC">carbon dioxide</HT>, it appears to me to be well within the wording of this provision if inherent CO<HT TYPE="SUB">2</HT> is emitted at the end of a process like the Claus process, even though it is not being actually used as part of a chemical reaction in the course of that process.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0033"><P>See also judgment of <REF.DOC.ECR><DATE ISO="20180228">28 February 2018</DATE>, <NAME.CASE><HT TYPE="ITALIC">Trinseo Deutschland</HT></NAME.CASE> (<NO.CASE>C‑577/16</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2018:127">EU:C:2018:127</NO.ECLI>, paragraphs <REF.NP.ECR REF="NP0045">45</REF.NP.ECR> to <REF.NP.ECR REF="NP0048">48</REF.NP.ECR></REF.DOC.ECR>).</P></NOTE> A far more difficult question is whether those CO<HT TYPE="SUB">2</HT> emissions can be said to be the result of <HT TYPE="ITALIC">the use of a carbon containing additive or raw material</HT>.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0053"><NO.P>53.</NO.P><TXT>Again, I have little doubt with respect to the term <QUOT.START CODE="2018" ID="QS0063" REF.END="QE0063"/>raw material<QUOT.END REF.START="QS0063" CODE="2019" ID="QE0063"/>. According to the Cambridge dictionary<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0034"><P>Consulted online.</P></NOTE> <QUOT.START CODE="2018" ID="QS0064" REF.END="QE0064"/>raw material<QUOT.END REF.START="QS0064" CODE="2019" ID="QE0064"/> is <QUOT.START CODE="2018" ID="QS0065" REF.END="QE0065"/>any material, such as oil, cotton, or sugar in its natural condition, before it has been processed for use<QUOT.END REF.START="QS0065" CODE="2019" ID="QE0065"/>. It is true, of course, that only the hydrogen sulphide is actually being processed in the Claus process whereas the CO<HT TYPE="SUB">2</HT> contained in the sour gas only passes through the Claus process plant without taking part in the process. Looking at the simple word sense, though, the term <QUOT.START CODE="2018" ID="QS0066" REF.END="QE0066"/>raw material<QUOT.END REF.START="QS0066" CODE="2019" ID="QE0066"/> does not seem to me to be limited to parts of a material that are being actively processed. It might be correct, as the Federal Environmental Office<?PAGE NO="14"?> suggested, that if the CO<HT TYPE="SUB">2</HT> were separated from the sour gas prior to it being processed in the Claus facility the CO<HT TYPE="SUB">2</HT> would not be a raw material, because it is not being further processed whereas the remainder of the gas would be.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0035"><P>This would not impede the Claus process from taking place as the CO<HT TYPE="SUB">2</HT> fulfils no function in it (which is discussed further below).</P></NOTE> If, however, that prior step does not take place, it does not mean that a material with a CO<HT TYPE="SUB">2</HT> content that enters an installation for processing is not a raw material, simply because only part of it is being processed.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0054"><NO.P>54.</NO.P><TXT>The question regarding the causality, namely, whether it can be considered that the CO<HT TYPE="SUB">2</HT> emissions are the result of the <HT TYPE="ITALIC">use</HT> of that raw material is, however, less clear. Here, the literal interpretation rather points to saying that this does not come within the wording of Article 3(h)(v) of Decision 2011/278. Again, looking at the Cambridge dictionary,<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0036"><P>Consulted online.</P></NOTE> the definition to be found there that describes the use of the word in the present case most closely is <QUOT.START CODE="2018" ID="QS0067" REF.END="QE0067"/>the act of using something, or a period of time when something is being used<QUOT.END REF.START="QS0067" CODE="2019" ID="QE0067"/> with the verb <QUOT.START CODE="2018" ID="QS0068" REF.END="QE0068"/>use<QUOT.END REF.START="QS0068" CODE="2019" ID="QE0068"/> meaning <QUOT.START CODE="2018" ID="QS0069" REF.END="QE0069"/>to put something such as a tool, skill, or building to a particular purpose<QUOT.END REF.START="QS0069" CODE="2019" ID="QE0069"/>.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0037"><P>Other language versions of Article 3(h)(v) of Decision 2011/278, such as the Dutch, the French, the German, the Italian, the Portuguese, the Swedish and the Spanish versions do not lead to a different assessment.</P></NOTE> This putting to a particular purpose, to my mind, implies that something is being done with that part of the raw material – namely the carbon content – that is specifically being referred to.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0055"><NO.P>55.</NO.P><TXT>There is agreement between the parties that the CO<HT TYPE="SUB">2</HT> does not participate in the chemical reaction during the Claus process. However, ExxonMobil argues that it puts the inherent CO<HT TYPE="SUB">2</HT> to some use. According to ExxonMobil, the CO<HT TYPE="SUB">2</HT> fulfils a procedural role in the Claus process as a non-combustible gas with a temperature-regulating function for the technically necessary control of the combustion temperature in the Claus process for the production of sulphur. This does not seem to be contested by the Federal Environmental Office. As was pointed out, however, by its representative during the oral hearing, this is not a necessary role because there are other ways of achieving the same result.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0038"><P>The representative of the Federal Environmental Office pointed out that the CO<HT TYPE="SUB">2</HT> could be separated prior to the gas being treated in the Claus process without this having any influence on the outcome and that, indeed, the Claus process equipment would have to be adjusted to the specific CO<HT TYPE="SUB">2</HT> content of the natural gas used. This has not been contested by ExxonMobil. Ultimately, it falls to the referring court to find whether the CO<HT TYPE="SUB">2</HT> plays a necessary role in the process.</P></NOTE> This in turn raises the further question whether it is sufficient to make some use of the CO<HT TYPE="SUB">2</HT> in order for the process to qualify as a process emission sub-installation, or whether its use must be necessary for the process.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0039"><P>The question whether it is necessary is for the national court to decide.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0056"><NO.P>56.</NO.P><TXT>It was also argued that, as Article 3(h)(iv) of Decision 2011/278 specifically refers to a <QUOT.START CODE="2018" ID="QS0070" REF.END="QE0070"/>chemical syntheses where the carbon bearing material participates in the reaction<QUOT.END REF.START="QS0070" CODE="2019" ID="QE0070"/> whereas Article 3(h)(v) of that decision does not, such a participation in a chemical reaction cannot be a requirement under the latter provision.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0057"><NO.P>57.</NO.P><TXT>Pausing at this point, and although I consider that so far as the critical word <QUOT.START CODE="2018" ID="QS0071" REF.END="QE0071"/>use<QUOT.END REF.START="QS0071" CODE="2019" ID="QE0071"/> as it appears in Article 3(h)(v) of Decision 2011/278 is concerned, the wording points to an interpretation according to which the CO<HT TYPE="SUB">2</HT> has to play an active and necessary role in the process, it may be appropriate – in accordance with consistent case-law – to have regard to the general scheme of Directive 2003/87 and of Decision 2011/278 and to the objectives they pursue as an aid to this process of interpretation.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0040"><P>Judgment of <REF.DOC.ECR><DATE ISO="20201203">3 December 2020</DATE>, <NAME.CASE><HT TYPE="ITALIC">Ingredion Germany</HT></NAME.CASE> (<NO.CASE>C‑320/19</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2020:983">EU:C:2020:983</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0050">50</REF.NP.ECR></REF.DOC.ECR> and the case-law cited).</P></NOTE></TXT></NP.ECR></GR.SEQ><?PAGE NO="15"?><GR.SEQ LEVEL="3"><TITLE><TI><NP><NO.P><HT TYPE="ITALIC">2.</HT></NO.P><TXT><HT TYPE="ITALIC">Contextual and teleological interpretation</HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0058"><NO.P>58.</NO.P><TXT>According to the Court’s settled case-law, Directive 2003/87, and thereby also Decision 2011/278 which is implementing it, is intended to establish a scheme for greenhouse gas emission allowance trading which seeks to reduce those emissions into the atmosphere to a level that prevents dangerous anthropogenic interference with the climate and the ultimate objective of which is to protect the environment.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0041"><P>See, inter alia, judgments of <REF.DOC.ECR><DATE ISO="20170308">8 March 2017</DATE>, <NAME.CASE><HT TYPE="ITALIC">ArcelorMittal Rodange et Schifflange</HT></NAME.CASE> (<NO.CASE>C‑321/15</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2017:179">EU:C:2017:179</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0024">24</REF.NP.ECR></REF.DOC.ECR>); of <REF.DOC.ECR><DATE ISO="20180118">18 January 2018</DATE>, <NAME.CASE><HT TYPE="ITALIC">INEOS</HT></NAME.CASE> (<NO.CASE>C‑58/17</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2018:19">EU:C:2018:19</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0022">22</REF.NP.ECR></REF.DOC.ECR>); of <REF.DOC.ECR><DATE ISO="20180228">28 February 2018</DATE>, <NAME.CASE><HT TYPE="ITALIC">Trinseo Deutschland</HT></NAME.CASE> (<NO.CASE>C‑577/16</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2018:127">EU:C:2018:127</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0039">39</REF.NP.ECR></REF.DOC.ECR>); and Case C-682/17, paragraph 62.</P></NOTE> The economic logic underlying that scheme is that it encourages the participants to emit quantities of greenhouse gases that are less than the allowances originally allocated to them, in order to sell the surplus to other participants.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0042"><P>See, inter alia, judgments of <REF.DOC.ECR><DATE ISO="20170308">8 March 2017</DATE>, <NAME.CASE><HT TYPE="ITALIC">ArcelorMittal Rodange et Schifflange</HT></NAME.CASE> (<NO.CASE>C‑321/15</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2017:179">EU:C:2017:179</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0022">22</REF.NP.ECR></REF.DOC.ECR>); of <REF.DOC.ECR><DATE ISO="20180118">18 January 2018</DATE>, <NAME.CASE><HT TYPE="ITALIC">INEOS</HT></NAME.CASE> (<NO.CASE>C‑58/17</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2018:19">EU:C:2018:19</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0022">22</REF.NP.ECR></REF.DOC.ECR>); of <REF.DOC.ECR><DATE ISO="20180228">28 February 2018</DATE>, <NAME.CASE><HT TYPE="ITALIC">Trinseo Deutschland</HT></NAME.CASE> (<NO.CASE>C‑577/16</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2018:127">EU:C:2018:127</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0040">40</REF.NP.ECR></REF.DOC.ECR>); and Case C-682/17, paragraph 63.</P></NOTE> In order to achieve that aim, Article 10a of Directive 2003/87 provides, with regard to installations in certain sectors of activity, for the free allocation of emission allowances, the quantity of which, in accordance with paragraph 11 of that provision, is to decrease gradually over the period 2013 to 2020, in order to arrive at the complete abolition of free allowances in 2027.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0043"><P>Judgment of <REF.DOC.ECR><DATE ISO="20180118">18 January 2018</DATE>, <NAME.CASE><HT TYPE="ITALIC">INEOS</HT></NAME.CASE> (<NO.CASE>C‑58/17</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2018:19">EU:C:2018:19</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0025">25</REF.NP.ECR></REF.DOC.ECR> and the case-law cited). This aim has subsequently been postponed to 2030 for sectors to be considered at low risk or no risk of carbon leakage, except district heating (although subject to review) and given up with respect to sectors and subsectors considered to be at substantial risk of carbon leakage, see the second paragraph of recital 10 of Directive 2018/410. Article 10a(11) was accordingly deleted from Directive 2003/87 by Article 1(14)(k) of Directive 2018/410. This does not, however, change the aims of the directive as it stood prior to that change. Even beyond that period, the rules regarding the free allocation of allowances have to be considered exceptional. According to recital 5 of Directive 2018/410, <QUOT.START CODE="2018" ID="QS0072" REF.END="QE0072"/>free allocation will not expire and … existing measures will continue after 2020 to prevent the risk of carbon leakage due to climate policy, [only] as long as no comparable efforts are undertaken in other major economies<QUOT.END REF.START="QS0072" CODE="2019" ID="QE0072"/>.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0059"><NO.P>59.</NO.P><TXT>This means that the rules for harmonised free allocation of emission allowances pursuant to Article 10a of Directive 2003/87 for which Decision 2011/278 determines the rules are exceptional (and, indeed, temporary) in nature. Furthermore, Article 3(c), (d) and (h) of Decision 2011/278<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0044"><P>I will come to the question of whether there is also a (descending) order between those three <QUOT.START CODE="2018" ID="QS0073" REF.END="QE0073"/>fallback benchmarks<QUOT.END REF.START="QS0073" CODE="2019" ID="QE0073"/> when I am dealing with Question 4.</P></NOTE> define the so-called <QUOT.START CODE="2018" ID="QS0074" REF.END="QE0074"/>fallback benchmarks<QUOT.END REF.START="QS0074" CODE="2019" ID="QE0074"/> which only come into play if <QUOT.START CODE="2018" ID="QS0075" REF.END="QE0075"/>corresponding emissions [are] not covered by a product benchmark sub-installation<QUOT.END REF.START="QS0075" CODE="2019" ID="QE0075"/><NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0045"><P>See Article 3(c) and (d) of Decision 2011/278.</P></NOTE>/<QUOT.START CODE="2018" ID="QS0076" REF.END="QE0076"/>occur outside the system boundaries of a product benchmark<QUOT.END REF.START="QS0076" CODE="2019" ID="QE0076"/>.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0046"><P>See Article 3(h) of Decision 2011/278.</P></NOTE> The Court already found in its judgment in <HT TYPE="ITALIC">INEOS</HT> that it followed that Article 3(h)(iv) of Decision 2011/278 cannot be interpreted broadly.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0047"><P>Judgment of <REF.DOC.ECR><DATE ISO="20180118">18 January 2018</DATE>, <NAME.CASE><HT TYPE="ITALIC">INEOS</HT></NAME.CASE> (<NO.CASE>C‑58/17</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2018:19">EU:C:2018:19</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0036">36</REF.NP.ECR></REF.DOC.ECR>). There the Court even referred to process emissions as the <QUOT.START CODE="2018" ID="QS0077" REF.END="QE0077"/>final so-called <QUOT.START CODE="201C" ID="QS0078" REF.END="QE0078"/>fallback<QUOT.END REF.START="QS0078" CODE="201D" ID="QE0078"/> option<QUOT.END REF.START="QS0077" CODE="2019" ID="QE0077"/>.</P></NOTE> The same must be true for all activities listed in Article 3(h) of Decision 2011/78.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0060"><NO.P>60.</NO.P><TXT>As a result of this, I cannot agree that the fact that Article 3(h)(iv) of Decision 2011/278 specifically refers to the participation of a carbon bearing material in chemical syntheses whereas Article 3(h)(v) of that decision does not, means that the word <QUOT.START CODE="2018" ID="QS0079" REF.END="QE0079"/>use<QUOT.END REF.START="QS0079" CODE="2019" ID="QE0079"/> contained in the latter provision must be given an interpretation that is so broad that it is no longer covered by the word <QUOT.START CODE="2018" ID="QS0080" REF.END="QE0080"/>use<QUOT.END REF.START="QS0080" CODE="2019" ID="QE0080"/> simply in order to distinguish it from the cases covered by the former provision. The term <QUOT.START CODE="2018" ID="QS0081" REF.END="QE0081"/>use<QUOT.END REF.START="QS0081" CODE="2019" ID="QE0081"/> is in fact broader and might encompass a <QUOT.START CODE="2018" ID="QS0082" REF.END="QE0082"/>use<QUOT.END REF.START="QS0082" CODE="2019" ID="QE0082"/> that does not consist in a chemical reaction. The term <QUOT.START CODE="2018" ID="QS0083" REF.END="QE0083"/>use<QUOT.END REF.START="QS0083" CODE="2019" ID="QE0083"/> does imply, however, that the carbon containing raw material must be necessary for the primary purpose pursued (which is not the generation of heat).<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0048"><P>In the present case it does not seem contested by any of the parties that the purpose of the sulphur recovery process is not the generation of heat.</P></NOTE></TXT></NP.ECR><?PAGE NO="16"?><NP.ECR IDENTIFIER="NP0061"><NO.P>61.</NO.P><TXT>Such a more restrictive interpretation might be confirmed by the definition of <QUOT.START CODE="2018" ID="QS0084" REF.END="QE0084"/>process emissions<QUOT.END REF.START="QS0084" CODE="2019" ID="QE0084"/> contained in Article 3(30) of Regulation No 601/2012. According to that definition, <QUOT.START CODE="2018" ID="QS0085" REF.END="QE0085"/><QUOT.START CODE="201C" ID="QS0086" REF.END="QE0086"/>process emissions<QUOT.END REF.START="QS0086" CODE="201D" ID="QE0086"/> means greenhouse gas emissions other than combustion emissions occurring as a result of intentional and unintentional reactions between substances or their transformation …<QUOT.END REF.START="QS0085" CODE="2019" ID="QE0085"/>. The CO<HT TYPE="SUB">2</HT> contained in the sour gas is, however, clearly not the result of an intentional or unintentional reaction between substances or their transformation.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0062"><NO.P>62.</NO.P><TXT>Regulation No 601/2012 deals with the monitoring and reporting of greenhouse gas emissions. Article 14 of Directive 2003/87 provided for the Commission to adopt a regulation for that purpose. Regulation No 601/2012 therefore, does not deal with, much less define the cases in which emission allowances will be allocated free of charge. For that same reason, the fact that Article 48 of Regulation No 601/2012 contains a provision stipulating to which installation inherent CO<HT TYPE="SUB">2</HT> is to be attributed for the purposes of monitoring and reporting of greenhouse gas emissions, does not provide any real indication as to whether any allocations of process emission certificates can be provided free of charge for such inherent emissions.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0063"><NO.P>63.</NO.P><TXT>As Advocate General Saugmandsgaard Øe has already pointed out in his Opinion in <HT TYPE="ITALIC">ExxonMobil Production Deutschland</HT>, the concepts of <QUOT.START CODE="2018" ID="QS0087" REF.END="QE0087"/>process emissions<QUOT.END REF.START="QS0087" CODE="2019" ID="QE0087"/> in Article 3(30) of Regulation No 601/2012 and of <QUOT.START CODE="2018" ID="QS0088" REF.END="QE0088"/>process emission sub-installation<QUOT.END REF.START="QS0088" CODE="2019" ID="QE0088"/> in Article 3(h) of Decision 2011/278 only partly overlap because <QUOT.START CODE="2018" ID="QS0089" REF.END="QE0089"/>process emissions<QUOT.END REF.START="QS0089" CODE="2019" ID="QE0089"/> are, to a large extent, covered by the product benchmarks provided for in Annex I to that decision.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0049"><P>Footnote 42.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0064"><NO.P>64.</NO.P><TXT>I would also be reluctant to read much into the fact that Article 48(1) of Regulation No 601/2012 contains a provision stipulating that <QUOT.START CODE="2018" ID="QS0090" REF.END="QE0090"/>inherent CO<HT TYPE="SUB">2</HT> which is transferred into an installation, including that contained in natural gas … shall be included in the emission factor for that fuel<QUOT.END REF.START="QS0090" CODE="2019" ID="QE0090"/>. If one considers the natural gas to be a fuel,<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0050"><P>Article 3(40) of Regulation No 601/2012 defines <QUOT.START CODE="2018" ID="QS0091" REF.END="QE0091"/>inherent CO<HT TYPE="SUB">2</HT><QUOT.END REF.START="QS0091" CODE="2019" ID="QE0091"/> as CO<HT TYPE="SUB">2</HT> which is part of a fuel.</P></NOTE> as the Court seems to imply in its judgment in Case C‑682/17, ,<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0051"><P>Paragraph 54.</P></NOTE> Article 48(1) of Regulation No 601/2012 still only contains a rule dealing with the monitoring methodology. It does not provide any real indication as to whether any allocations of process emission certificates can be provided free of charge for such inherent emissions.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0065"><NO.P>65.</NO.P><TXT>Turning to the objective of Article 3(h)(v) of Decision 2011/278 and process emission sub-installations in general, the parties differ on this question. Whereas ExxonMobil is of the opinion that, as the risk of carbon leakage for the sulphur recovery industry is acknowledged, there must accordingly be a free allocation of emission allowance certificates for the emissions of inherent CO<HT TYPE="SUB">2</HT>. Given this <QUOT.START CODE="2018" ID="QS0092" REF.END="QE0092"/>necessary result<QUOT.END REF.START="QS0092" CODE="2019" ID="QE0092"/>, in ExxonMobil’s opinion Article 3(h)(v) of Decision 2011/278 must be applicable, as clearly none of the other options apply. The Federal Environment Office, on the other hand, claims that process emission sub-installations can only be recognised for emissions that arise from one of the categories of activities as per Annex I to Directive 2003/87. As, in the present case, only the combustion of fuels falls into that category, it follows that only the emissions stemming therefrom can be considered for the purposes of free allowances if there is no product emission benchmark as in the present case. This would mean that the purpose of Article 3(h) is limited to providing for free emission allowances if CO<HT TYPE="SUB">2</HT> emissions are the result of a (further) activity listed in Annex I to Directive 2003/87 – other than the combustion of fuels – for which no product benchmark exists.</TXT></NP.ECR><?PAGE NO="17"?><GR.SEQ LEVEL="4"><TITLE><TI><NP><NO.P><HT TYPE="ITALIC">(a)</HT></NO.P><TXT><HT TYPE="ITALIC">Role of a <QUOT.START CODE="2018" ID="QS0093" REF.END="QE0093"/>significant risk of carbon leakage<QUOT.END REF.START="QS0093" CODE="2019" ID="QE0093"/> in the emission trading system</HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0066"><NO.P>66.</NO.P><TXT>As referred to in recital 24 of Directive 2009/29, <HT TYPE="ITALIC">carbon leakage</HT> describes a situation in which <QUOT.START CODE="2018" ID="QS0094" REF.END="QE0094"/>other developed countries and other major emitters of greenhouse gases do not participate in [an ambitious international agreement on climate change] … [which] could lead to an increase in greenhouse gas emissions in third countries where industry would not be subject to comparable carbon constraints … This could undermine the environmental integrity and benefit of actions of the Community<QUOT.END REF.START="QS0094" CODE="2019" ID="QE0094"/>.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0052"><P>The conditions for a sector or subsector to be deemed to be exposed to a significant risk of carbon leakage are set out in Article 10a(14) to (17) of Directive 2003/87. The list of sectors or subsectors exposed to a significant risk of carbon leakage according to Article 10a(13) of Directive 2003/87 is contained in Commission Decision of <DATE ISO="20091224">24 December 2009</DATE> (2010/2/EU) determining, pursuant to Directive 2003/87/EC of the European Parliament and of the Council, a list of sectors and subsectors which are deemed to be exposed to a significant risk of carbon leakage (<REF.DOC.OJ COLL="L" NO.OJ="001" PAGE.FIRST="10" DATE.PUB="2010">OJ 2010 L 1, p. 10</REF.DOC.OJ>). The <QUOT.START CODE="2018" ID="QS0095" REF.END="QE0095"/>extraction of crude petroleum and natural gas<QUOT.END REF.START="QS0095" CODE="2019" ID="QE0095"/> is listed in point 1.4 of the Annex.</P></NOTE> In order to prevent this from happening, Directive 2003/87 provides for specific measures. First, according to Article 10a(12) thereof, the yearly free allowances – which are to be allocated according to Article 10a(1) of that directive – will be kept at the level of 100% for the third trading period.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0053"><P>See to that effect Case C-682/17, paragraph 94, but see also footnote 44 of this Opinion.</P></NOTE> This is in contrast to installations in sectors and subsectors which are not exposed to a significant risk of carbon leakage where the initial allocation in 2013 is to be limited to 80% of the quantity allocated according to Article 10a(11) of Directive 2003/87. In those sectors, the quantity of free allowances will be further decreased each year by equal amounts resulting in 30% free allocations in 2020 according to Article 10a(11) of Directive 2003/87.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0054"><P>See to that effect judgment of <REF.DOC.ECR><DATE ISO="20161026">26 October 2016</DATE>, <NAME.CASE><HT TYPE="ITALIC">Yara Suomi and Others</HT></NAME.CASE> (<NO.CASE>C‑506/14</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2016:799">EU:C:2016:799</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0047">47</REF.NP.ECR></REF.DOC.ECR>).</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0067"><NO.P>67.</NO.P><TXT>That directive further provides in Article 10a(6) thereof that <QUOT.START CODE="2018" ID="QS0096" REF.END="QE0096"/>Member States may adopt financial measures in favour of sectors or subsectors determined to be exposed to a significant risk of carbon leakage due to costs relating to greenhouse gas emissions passed on in electricity prices, in order to compensate for those costs and where such financial measures are in accordance with State aid rules applicable and to be adopted in this area<QUOT.END REF.START="QS0096" CODE="2019" ID="QE0096"/>.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0068"><NO.P>68.</NO.P><TXT>From this, it is clear, as Advocate General Wahl has already pointed out in <HT TYPE="ITALIC">ArcelorMittal Atlantique et Lorraine</HT>, <QUOT.START CODE="2018" ID="QS0097" REF.END="QE0097"/>that the directive does not state that sectors deemed to be at a significant risk of carbon leakage should, in all circumstances, receive free emission allowances that correspond to all greenhouse gas emissions they emit<QUOT.END REF.START="QS0097" CODE="2019" ID="QE0097"/>.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0055"><P>(<REF.DOC.ECR><NO.CASE>C‑80/16</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2017:192">EU:C:2017:192</NO.ECLI>, point <REF.NP.ECR REF="NP0047">47</REF.NP.ECR></REF.DOC.ECR>).</P></NOTE> Rather, with respect to the allocation of emission certificates free of charge, it is a mandatory requirement that quantities of free allowances be allocated in accordance with the rules adopted according to Article 10a(1) of Directive 2003/87. These decide on the preliminary quantity of allowances. Only then can Article 10a(12) of Directive 2003/87 be applied, by not decreasing the number of allowances arrived at. Nothing in those provisions provides for the taking into account of <QUOT.START CODE="2018" ID="QS0098" REF.END="QE0098"/>the significant risk of carbon leakage<QUOT.END REF.START="QS0098" CODE="2019" ID="QE0098"/> when it comes to deciding <HT TYPE="ITALIC">whether</HT> allowances of emission certificates can be allocated free of charge.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0056"><P>See also, by analogy, judgment of <REF.DOC.ECR><DATE ISO="20161026">26 October 2016</DATE>, <NAME.CASE><HT TYPE="ITALIC">Yara Suomi and Others</HT></NAME.CASE> (<NO.CASE>C‑506/14</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2016:799">EU:C:2016:799</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0054">54</REF.NP.ECR></REF.DOC.ECR>), where the applicants challenged the application of the uniform cross-sectoral correction factor which can be applied in order to limit the maximum annual amount of allowances according to Article 10a(5) of Directive 2003/87 to all preliminary quantities of allowances, without exempting installations in sectors or subsectors which are exposed to a significant risk of carbon leakage.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0069"><NO.P>69.</NO.P><TXT>It follows from all of this that it would be contrary to the wording as well as to the scheme of Directive 2003/87 to give a wide interpretation to the causality requirement contained in Article 3(h)(v) of Decision 2011/278 simply because the process at issue is considered to be exposed to a significant risk of carbon leakage.</TXT></NP.ECR></GR.SEQ><?PAGE NO="18"?><GR.SEQ LEVEL="4"><TITLE><TI><NP><NO.P><HT TYPE="ITALIC">(b)</HT></NO.P><TXT><HT TYPE="ITALIC">Purpose of the <QUOT.START CODE="2018" ID="QS0099" REF.END="QE0099"/>process emissions sub-installation<QUOT.END REF.START="QS0099" CODE="2019" ID="QE0099"/></HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0070"><NO.P>70.</NO.P><TXT>ExxonMobil contends that the goal pursued by the EU legislature with process emission sub-installations according to Article 3(h) of Decision 2011/278 is to create a sub-installation for processes from which unavoidable CO<HT TYPE="SUB">2</HT> emissions result but for which no product benchmark has been determined. This, however, cannot be clearly inferred from Decision 2011/278. Recital 12 of Decision 2011/278 merely states that <QUOT.START CODE="2018" ID="QS0100" REF.END="QE0100"/>where deriving a product benchmark was not feasible, <HT TYPE="ITALIC">but greenhouse gases eligible for the free allocation of emission allowances occur</HT>, those allowances should be allocated on the basis of generic fallback approaches. … For process emissions, emission allowances should be allocated on the basis of historical emissions<QUOT.END REF.START="QS0100" CODE="2019" ID="QE0100"/>.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0057"><P>Emphasis added.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0071"><NO.P>71.</NO.P><TXT>The fourth paragraph of Article 10a(1) of Directive 2003/87 provides that <QUOT.START CODE="2018" ID="QS0101" REF.END="QE0101"/>for each sector and subsector, in principle, the benchmark shall be calculated for products rather than for inputs, in order to maximise greenhouse gas emissions reductions and energy efficiency savings <HT TYPE="ITALIC">throughout each production process</HT> of the sector or the subsector concerned<QUOT.END REF.START="QS0101" CODE="2019" ID="QE0101"/>.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0058"><P>Emphasis added.</P></NOTE> This means that process emissions will generally be included in a product benchmark. It was, however, not always possible to develop a product benchmark. One of the reasons lies in the fact that many installations are included in the emission trading system only because they operate units for the combustion of fuels in installations with a total rated thermal input exceeding 20 MW. This wide definition includes installations in a variety of sectors that are otherwise not included in the emissions trading system. As the study commissioned by the European Commission <QUOT.START CODE="2018" ID="QS0102" REF.END="QE0102"/>Methodology for the free allocation of emission allowances in the EU ETS post 2012<QUOT.END REF.START="QS0102" CODE="2019" ID="QE0102"/> explained, installations that either have a total rated thermal input of less than 20 MW or that receive heat from installations under different ownership are not covered. The fact that a substantial part of the production facilities producing the product were not included in the emission trading system made the setting of a product benchmark difficult.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0059"><P>Ecofys, Fraunhofer Institute for Systems and Innovation Research, Öko-Institut, November 2009 (a study ordered by the European Commission), pp. ii and 25.</P></NOTE> In these circumstances what might be termed the fallback options were developed with those types of cases in mind.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0072"><NO.P>72.</NO.P><TXT>All of this means that there is no immediate link between the fact that emissions cannot be avoided and the fallback options. Article 10a(3) of Directive 2003/87 which only specifically excludes electricity generators from being allocated free allowances (with some exceptions) does not support such a broad approach either. It would have been easy to provide that the grandfathering method should be applied to all emissions subject to the emission trading scheme except those covered by a process benchmark, a heat benchmark or a fuel benchmark. Instead, a specific definition was chosen for process emissions sub-installations. Furthermore, as the representative of the Federal Environmental Office pointed out at the hearing, even if a product benchmark exists, all emissions that are inevitable by-products of chemical processes are not necessarily covered by that product benchmark.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0060"><P>As was pointed out by that representative, a specific product benchmark exists according to Annex II to Decision 2011/278 for <QUOT.START CODE="2018" ID="QS0103" REF.END="QE0103"/>sulphur recovery<QUOT.END REF.START="QS0103" CODE="2019" ID="QE0103"/> in refineries. Product benchmarks in the refinery sector are generally based on the <QUOT.START CODE="2018" ID="QS0104" REF.END="QE0104"/>CO<HT TYPE="SUB">2</HT> weighted tonne<QUOT.END REF.START="QS0104" CODE="2019" ID="QE0104"/> approach which does not take into account the inherent CO<HT TYPE="SUB">2</HT> either. With regard to that approach see recital 24 of Decision 2011/278.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0073"><NO.P>73.</NO.P><TXT>It therefore appears that Directive 2003/87 does not have the purpose of providing for the free allocation of emission certificates with respect to every emission that is the inevitable by-product of the use of an industrial chemical process such as the Claus process.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0061"><P>Although, as I have pointed out, it is already questionable whether the emissions in the present case must be considered as inevitable. See point 47 of the present Opinion.</P></NOTE></TXT></NP.ECR><?PAGE NO="19"?><NP.ECR IDENTIFIER="NP0074"><NO.P>74.</NO.P><TXT>In the light of the foregoing purposive analysis, I find myself concluding that the CO<HT TYPE="SUB">2</HT> released into the atmosphere as part of the processing of natural gas (in the form of sour gas) in the Claus process, by means of the CO<HT TYPE="SUB">2</HT> inherent in natural gas being separated from the gas mixture, does not occur <QUOT.START CODE="2018" ID="QS0105" REF.END="QE0105"/>as a result<QUOT.END REF.START="QS0105" CODE="2019" ID="QE0105"/> of the process referred to in Article 3(h)(v) of Decision 2011/278 because the sour gas, which is a carbon-containing raw material is not <QUOT.START CODE="2018" ID="QS0106" REF.END="QE0106"/>used<QUOT.END REF.START="QS0106" CODE="2019" ID="QE0106"/> within the meaning of that provision, even if, viewed simply from the literal wording of the text, that text is itself admittedly ambiguous.</TXT></NP.ECR></GR.SEQ></GR.SEQ></GR.SEQ><GR.SEQ LEVEL="2"><TITLE><TI><NP><NO.P><HT TYPE="BOLD"><HT TYPE="ITALIC">C.</HT></HT></NO.P><TXT><HT TYPE="BOLD"><HT TYPE="ITALIC">Question 4: Is there a hierarchy between the different fallback benchmarks?</HT></HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0075"><NO.P>75.</NO.P><TXT>By its fourth questions the referring court wishes to know, which benchmark must be applied if an installation fulfils the criteria of a heat emission sub-installation as well as those of a process emission sub-installation.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0076"><NO.P>76.</NO.P><TXT>As a preliminary point, it must be observed that, under the procedure laid down by Article 267 TFEU, providing for cooperation between national courts and the Court of Justice, it is for the latter to provide the national court with an answer which will be of use to it and enable it to determine the case before it. To that end, the Court may have to reformulate the questions referred to it.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0062"><P>Judgment of <REF.DOC.ECR><DATE ISO="20191107">7 November 2019</DATE>, <NAME.CASE><HT TYPE="ITALIC">K.H.K. (Account preservation)</HT></NAME.CASE> (<NO.CASE>C‑555/18</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2019:937">EU:C:2019:937</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0028">28</REF.NP.ECR></REF.DOC.ECR> and the case-law cited).</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0077"><NO.P>77.</NO.P><TXT>The referring court points out that, subject to the answer given to questions 1 to 3, it seems possible in this case that emissions from the Claus process can meet the definition both of the heat benchmark sub-installation as well as that of the process emission sub-installation. I suggest, therefore, that it would be convenient if any answer were to deal with the question of which benchmark must be applied if emissions were (contrary to my view) in fact to fulfil the criteria of a heat benchmark sub-installation as well as those of a process emissions sub-installation.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0063"><P>This leaves aside the question of whether this is possible as the Court has already decided in its judgment of <REF.DOC.ECR><DATE ISO="20160908">8 September 2016</DATE>, <NAME.CASE><HT TYPE="ITALIC">Borealis and Others</HT></NAME.CASE> (<NO.CASE>C‑180/15</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2016:647">EU:C:2016:647</NO.ECLI>, paragraphs <REF.NP.ECR REF="NP0062">62</REF.NP.ECR> to <REF.NP.ECR REF="NP0069">69</REF.NP.ECR></REF.DOC.ECR>) that they are mutually exclusive.</P></NOTE> This encompasses the wider question of whether there is a hierarchy between the different fallback benchmarks if an installation fulfils the criteria of more than one of them.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0078"><NO.P>78.</NO.P><TXT>As it happens, the referring court suggests that its fourth question would only arise in case Questions 1 to 3 are answered in the affirmative. As I propose to give a negative answer to these questions – which means ExxonMobil’s installation is not eligible for the free allocation of allowances under the process emission benchmark – an answer to the fourth question is not strictly required. I shall nevertheless consider it in the event that the Court were to answer the first three question differently.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0079"><NO.P>79.</NO.P><TXT>With respect to this question, the German implementing legislation contained in Paragraph 3(1) of the ZuV 2020 differs somewhat from the wording of Article 6 of Decision 2011/278. The former provision clearly establishes a hierarchy of benchmarks. Applicants for emission allowances must assign the inputs, outputs and corresponding emissions to only one of the sub-installations. The provision stipulates that inputs, outputs and corresponding emissions can only be assigned to a heat benchmark sub-installation in so far as such inputs, outputs and corresponding emissions are not already covered by a product benchmark sub-installation. An assignment of inputs, outputs and corresponding emissions to a fuel benchmark sub-installation can only take place if they are not already covered by a product or a heat benchmark<?PAGE NO="20"?> sub-installation. Finally, inputs, outputs and corresponding emissions can only be assigned to a process emissions sub-installation if they are not covered by any of the other benchmark sub-installations.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0064"><P>The same approach is now taken in Article 10(2) of Commission Delegated Regulation (EU) 2019/331 of <DATE ISO="20181219">19 December 2018</DATE> determining transitional Union-wide rules for harmonised free allocation of emission allowances pursuant to Article 10a of Directive 2003/87/EC of the European Parliament and of the Council (<REF.DOC.OJ COLL="L" NO.OJ="059" PAGE.FIRST="8" DATE.PUB="2019">OJ 2019 L 59, p. 8</REF.DOC.OJ>).</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0080"><NO.P>80.</NO.P><TXT>Decision 2011/278 is slightly less clear when it comes to the mutual relationship of the fallback benchmarks, although the definitions of the heat, the fuel and the process emissions sub-installations provide in Article 3(c), (d) and (h) respectively that they only apply to inputs, outputs and corresponding emissions not otherwise covered by a product benchmark sub-installation. Looking further, however, at the conditions of the heat benchmark sub-installation and the fuel benchmark sub-installation, the former regards <QUOT.START CODE="2018" ID="QS0107" REF.END="QE0107"/>inputs, outputs and corresponding emissions … relating to the production, the import from an installation or other entity covered by the Union scheme, or both of <HT TYPE="ITALIC">measurable heat</HT><QUOT.END REF.START="QS0107" CODE="2019" ID="QE0107"/><NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0065"><P>Emphasis added.</P></NOTE> with some further conditions related thereto. Fuel benchmark sub-installations, on the other hand, relate to inputs, outputs and corresponding emissions relating to the production of non-measurable heat under certain further conditions.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0081"><NO.P>81.</NO.P><TXT>This has also been found by the Court in its judgment in <HT TYPE="ITALIC">Borealis and Others</HT> where it held that the definitions of the different benchmark sub-installations are mutually exclusive.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0066"><P>Judgments of <REF.DOC.ECR><DATE ISO="20160908">8 September 2016</DATE>, <NAME.CASE><HT TYPE="ITALIC">Borealis and Others</HT></NAME.CASE> (<NO.CASE>C‑180/15</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2016:647">EU:C:2016:647</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0062">62</REF.NP.ECR> to <REF.NP.ECR REF="NP0065">65</REF.NP.ECR></REF.DOC.ECR>); as well as of <REF.DOC.ECR><DATE ISO="20180118">18 January 2018</DATE>, <NAME.CASE><HT TYPE="ITALIC">INEOS</HT></NAME.CASE> (<NO.CASE>C‑58/17</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2018:19">EU:C:2018:19</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0029">29</REF.NP.ECR></REF.DOC.ECR>), and of <REF.DOC.ECR><DATE ISO="20201203">3 December 2020</DATE>, <NAME.CASE><HT TYPE="ITALIC">Ingredion Germany</HT></NAME.CASE> (<NO.CASE>C‑320/19</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2020:983">EU:C:2020:983</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0068">68</REF.NP.ECR></REF.DOC.ECR>).</P></NOTE> With regard to process emissions sub-installations, it considered that this followed because they is ‘qualified as such with regard solely to the generation of specific types of emissions referred to in Article 3(h)(i) to (vi) of Decision 2011/278.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0067"><P>Judgment of <REF.DOC.ECR><DATE ISO="20160908">8 September 2016</DATE>, <NAME.CASE><HT TYPE="ITALIC">Borealis and Others</HT></NAME.CASE> (<NO.CASE>C‑180/15</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2016:647">EU:C:2016:647</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0066">66</REF.NP.ECR></REF.DOC.ECR>).</P></NOTE> The Court further found, relying on recital 12 of that decision, that, where deriving a product benchmark had not been feasible, but greenhouse gases eligible for the free allocation of emission allowances nonetheless occur, a hierarchy of three fallback approaches had been developed.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0068"><P>Ibid., at paragraph 67.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0082"><NO.P>82.</NO.P><TXT>It follows, therefore, that the question posed by the referring court has in fact already been answered by the Court in <HT TYPE="ITALIC">Borealis and Others</HT>.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0069"><P>Judgment of <REF.DOC.ECR><DATE ISO="20160908">8 September 2016</DATE>, <NAME.CASE><HT TYPE="ITALIC">Borealis and Others</HT></NAME.CASE> (<NO.CASE>C‑180/15</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2016:647">EU:C:2016:647</NO.ECLI></REF.DOC.ECR>).</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0083"><NO.P>83.</NO.P><TXT>The arguments of ExxonMobil to the effect that there is no hierarchy between the fallback options or, in the alternative, that process emissions sub-installations should be given precedence because they are the more specific option, are not, with respect, persuasive. I say that for the following reasons.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0084"><NO.P>84.</NO.P><TXT>ExxonMobil argues that heat benchmark sub-installations and process emissions sub-installations can coincide. According to ExxonMobil this is clear from the way in which the heat-related annual historical activity level is determined according to Article 9(3) of Decision 2011/278. The allocation of emissions allowances for a heat benchmark sub-installation depends on the emissions that are the result of the production of measurable heat. Those emissions are inferred from the heat that has been produced which is measured in terajoule per year. A process emissions sub-installation, on the other hand, at least that under Article 3(h)(v) of Decision 2011/278, is characterised by the fact that the emissions result from a process <QUOT.START CODE="2018" ID="QS0108" REF.END="QE0108"/>for a primary purpose other than the generation of heat<QUOT.END REF.START="QS0108" CODE="2019" ID="QE0108"/>. Hence, the annual historical activity level according to<?PAGE NO="21"?> Article 9(5) of Decision 2011/278 is the amount of emissions measured in tonnes of its CO<HT TYPE="SUB">2</HT> equivalent. These arguments refer to the question whether a heat benchmark sub-installation and a process emission sub-installation can be present in the same installation but in respect of different emissions.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0085"><NO.P>85.</NO.P><TXT>While it is true that two (or more) sub-installations relating to different activities might happen to coincide in one installation, the same inputs, outputs and emissions<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0070"><P>I use the wording now used in Article 10 of Delegated Regulation 2019/331 which is clearer in that it does not only refer to emissions but rather to <QUOT.START CODE="2018" ID="QS0109" REF.END="QE0109"/>an installation’s inputs, outputs and emissions<QUOT.END REF.START="QS0109" CODE="2019" ID="QE0109"/> which are assigned to one or more sub-installations. This is a more adequate reference to the different sub-installations.</P></NOTE> cannot be covered by several sub-installations as, otherwise, the risk of overlaps and double-counting which is prohibited by Article 6(2) of Decision 2011/278 could arise.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0071"><P>The Member States are obliged to ensure this according to Articles 7(7) and 8(5) of Decision 2011/278. See further, judgment of <REF.DOC.ECR><DATE ISO="20160908">8 September 2016</DATE>, <NAME.CASE><HT TYPE="ITALIC">Borealis and Others</HT></NAME.CASE> (<NO.CASE>C‑180/15</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2016:647">EU:C:2016:647</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0069">69</REF.NP.ECR></REF.DOC.ECR>).</P></NOTE> If one were to assume that criteria applying to different sub-installations can be fulfilled by the same inputs, outputs and emissions, the concept underlying Decision 2011/278 is the following: As explained in the study commissioned by the European Commission <QUOT.START CODE="2018" ID="QS0110" REF.END="QE0110"/>Methodology for the free allocation of emission allowances in the EU ETS post 2012<QUOT.END REF.START="QS0110" CODE="2019" ID="QE0110"/>, three factors influence specific CO<HT TYPE="SUB">2</HT> emissions. They are the choice of fuel mix, the efficiency of the heat production and the efficiency of the heat end use. Product benchmarks take all of these three factors into consideration.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0086"><NO.P>86.</NO.P><TXT>All of this is in line with recital 1 of Decision 2011/278 which provides that to the extent feasible, <HT TYPE="ITALIC">ex ante</HT> benchmarks must be determined, so as to ensure that the free allocation of emission allowances takes place in a manner that provides incentives for reductions in greenhouse gas emissions and energy efficient techniques. The methods of heat production benchmarking used for heat benchmark sub-installations, fuel mix benchmarking for fuel benchmark sub-installations and the so-called <QUOT.START CODE="2018" ID="QS0111" REF.END="QE0111"/>grandfathering<QUOT.END REF.START="QS0111" CODE="2019" ID="QE0111"/> (which only takes into account historic data and which is used for process emissions) each uses one less of these factors with the grandfathering method not taking any of them into account.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0072"><P>Ecofys, Fraunhofer Institute for Systems and Innovation Research, Öko-Institut, <QUOT.START CODE="2018" ID="QS0112" REF.END="QE0112"/>Methodology for the free allocation of emission allowances in the EU ETS post 2012: Report on the project approach and general issues<QUOT.END REF.START="QS0112" CODE="2019" ID="QE0112"/>, November 2009 (a study ordered by the European Commission), pp. 38 and 39.</P></NOTE> This is the rationale for the hierarchy between the different fallback benchmarks. Benchmarking methods that provide incentives for the reduction of emissions take precedence over the process emission sub-installation where no such incentives are provided for.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0087"><NO.P>87.</NO.P><TXT>It would therefore be contrary to the scheme of Article 10a of Directive 2003/87 and of Decision 2011/278 not to apply the hierarchy between the different benchmarks described in recital 12 of that decision.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0088"><NO.P>88.</NO.P><TXT>In the light of those considerations, I take the view that the allocation of free emission allowances must be carried out on the basis of the heat benchmark if emissions that are subject to the emissions trading scheme were to satisfy both the defining conditions of a heat benchmark sub-installation and the defining conditions of a process emissions sub-installation. This is simply because allocations under a heat benchmark sub-installation take precedence over allocations under a process emissions sub-installation.</TXT></NP.ECR></GR.SEQ><?PAGE NO="22"?><GR.SEQ LEVEL="2"><TITLE><TI><NP><NO.P><HT TYPE="BOLD"><HT TYPE="ITALIC">D.</HT></HT></NO.P><TXT><HT TYPE="BOLD"><HT TYPE="ITALIC">Question 5: Can entitlements to a free allocation of emission allowances for the third trading period be met after the end of that trading period?</HT></HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0089"><NO.P>89.</NO.P><TXT>By its fifth question, the referring court wants to know whether entitlements to free allowances for the third trading period which are only established by a court after the end of that trading period can be met by free allowances for the fourth trading period.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0073"><P>ExxonMobil has informed the Court that it had applied for interim relief by an application to the referring court on <DATE ISO="20200716">16 July 2020</DATE>. It sought a declaration by that court obliging the DEHSt to ensure that a number equivalent to the number of emission certificates requested to be allocated in the proceedings underlying the present request for a preliminary ruling be entered into ExxonMobil’s operator holding account, by <DATE ISO="20201231">31 December 2020</DATE> at the latest, in order to secure its allocation entitlements. In reaction to this, but prior to the referring court’s decision on the matter, the DEHSt had applied to the Commission for the transfer of that number of emission certificates to either the national allowance holding account of the Federal Republic of Germany or to ExxonMobil’s operator holding account. This application was rejected by the Commission by a letter addressed to the DEHSt on <DATE ISO="20201208">8 December 2020</DATE>. The referring court issued an order providing for interim measures on <DATE ISO="20201215">15 December 2020</DATE> (VG 10 L 216/2020) whereby it compelled the DEHSt to assert that, should the emission certificates for the trading period of 2013 to 2020 lapse, it will treat ExxonMobil as if this had not happened. That order was quashed by the Oberverwaltungsgericht Berlin-Brandenburg (Higher Administrative Court, Berlin-Brandenburg, Germany) on <DATE ISO="20201223">23 December 2020</DATE> and ExxonMobil’s application was finally dismissed (ECLI:DE:OVGBEBB:2020:0323.OVG11S12.20.00). An application to the Bundesverfassungsgericht (Federal Constitutional Court, Germany) for interim relief was unsuccessful (ECLI:DE:BVerfG:2020:qk20201229.1bvq016120). In parallel, ExxonMobil had, on <DATE ISO="20201217">17 December 2020</DATE>, started proceedings challenging the legality of the Commission’s decision of <DATE ISO="20201208">8 December 2020</DATE> addressed to the DEHSt according to Article 263 TFEU. It further applied for interim measures according to Article 279 TFEU. That action was dismissed by order of the President of the General Court of <REF.DOC.ECR><DATE ISO="20201231">31 December 2020</DATE>, <NAME.CASE><HT TYPE="ITALIC">ExxonMobil Production Deutschland</HT> v <HT TYPE="ITALIC">Commission</HT></NAME.CASE> (<NO.CASE>T‑731/20 R</NO.CASE>, not published, <NO.ECLI ECLI="ECLI:EU:T:2020:654">EU:T:2020:654</NO.ECLI></REF.DOC.ECR>), inter alia because it was considered unlikely that non-fulfilled rights to the free allowance of emission certificates would lapse at the end of the third trading period (at paragraph 17).</P></NOTE> Once again, this question has only been asked by the referring court if the first to fourth questions are answered in the affirmative. Given my answers to those questions, this case does not arise. I nonetheless propose to consider the question in the event that the Court were to decide differently.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0090"><NO.P>90.</NO.P><TXT>The referring court’s doubts with respect to this question are mainly the result of the Bundesverwaltungsgericht’s (Federal Administrative Court, Germany) case-law. That court had decided that (open) claims for additional allocations for the second trading period (2008 to 2012) had lapsed at the latest by <DATE ISO="20130430">30 April 2013</DATE> (midnight).<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0074"><P>Judgment of the Bundesverwaltungsgericht (Federal Administrative Court) of <DATE ISO="20180426">26 April 2018</DATE> (ECLI:DE:BVerwG:2018:260418U7C20.16.0).</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0091"><NO.P>91.</NO.P><TXT>It should be observed, however, that the legal situation at the end of the second trading period was quite different from the one at the end of the third trading period. Whereas, according to Article 13(1) of Directive 2003/87, allowances issued during one trading period were only valid for emissions during that trading period, that wording was amended by Directive 2018/410. The first sentence of Article 13 of Directive 2003/87 now reads <QUOT.START CODE="2018" ID="QS0113" REF.END="QE0113"/>Allowances issued from <DATE ISO="20130101">1 January 2013</DATE> onwards shall be valid indefinitely …<QUOT.END REF.START="QS0113" CODE="2019" ID="QE0113"/>.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0075"><P>According to Article 27 of Delegated Regulation 2019/331, Decision 2011/278 shall continue to apply to allocations relating to the period prior to <DATE ISO="20210101">1 January 2021</DATE> beyond the repeal of that decision.</P></NOTE> This is possible due to the general continuity of rules between the third and the fourth trading periods. The question is essentially whether, and, if so, in what way, a possible entitlement to the free allocation of emission allowances can be met in the absence of a specific provision dealing with this question.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0092"><NO.P>92.</NO.P><TXT>The referring court specifically asked whether an entitlement to a further free allocation of emission allowances for the third trading period can be met with allowances in respect of the fourth trading period in such a case. According to the second sentence of Article 13 of Directive 2003/87 (as amended by Directive 2018/410), allowances issued from 2021 shall only be valid from the beginning of the 10-year period in which they were issued. Therefore, a plaintiff who has been awarded a right to the allocation of free allowances would not be able to meet its obligations according to Article 12(3) of Directive 2003/87 with allowances for the fourth trading<?PAGE NO="23"?> period. In order to provide a useful answer to the referring court, its question might conveniently be therefore reformulated. Accordingly, the question to be answered should not be limited to whether such an entitlement can be met with allowances of the fourth trading period.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0093"><NO.P>93.</NO.P><TXT>There are two aspects to the question of how a possible entitlement to the free allocation of emission allowances for the third trading period can be met. There is first the procedural basis for such a change in allocation and, second, the question of the <QUOT.START CODE="2018" ID="QS0114" REF.END="QE0114"/>origin<QUOT.END REF.START="QS0114" CODE="2019" ID="QE0114"/> of these allowances. With respect to the first of these issues, as the German Government, represented by the Federal Ministry for Economic Affairs and Energy as well as the Commission have pointed out, any adjustment constitutes a change to the national allocation table provided for by Article 52 of Regulation No 389/2013<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0076"><P>Commission Regulation (EU) No 389/2013 of <DATE ISO="20130502">2 May 2013</DATE> establishing a Union Registry pursuant to Directive 2003/87/EC of the European Parliament and of the Council, Decisions No 280/2004/EC and No 406/2009/EC of the European Parliament and of the Council and repealing Commission Regulations (EU) No 920/2010 and No 1193/2011 (<REF.DOC.OJ COLL="L" NO.OJ="122" PAGE.FIRST="1" DATE.PUB="2013">OJ 2013 L 122, p. 1</REF.DOC.OJ>).</P></NOTE> which, according to Article 88 of Delegated Regulation 2019/1122,<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0077"><P>Commission Delegated Regulation (EU) 2019/1122 of <DATE ISO="20190312">12 March 2019</DATE> supplementing Directive 2003/87/EC of the European Parliament and of the Council as regards the functioning of the Union Registry (<REF.DOC.OJ COLL="L" NO.OJ="177" PAGE.FIRST="3" DATE.PUB="2019">OJ 2019 L 177, p. 3</REF.DOC.OJ>).</P></NOTE> shall continue to apply until <DATE ISO="20260101">1 January 2026</DATE> to all operations required in relation to the trading period between 2013 and 2020. If a court judges that an operator is entitled to a further allocation free of charge of emission allowances, the Member State concerned will inform the Commission accordingly (Article 52(2)(d) of Regulation No 389/2013) and the Commission will instruct the central administrator to make the corresponding changes to the national allocation table in the European Union Transaction Log.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0078"><P>The Commission will verify, in accordance with the second sub-paragraph of Article 52(2) of Regulation No 389/2013 whether such change is in conformity with, mainly Directive 2003/87 and Decision 2011/278 and will reject such changes if this is not the case.</P></NOTE> The central administrator will then ensure that the Union Registry transfers the respective allowances from the EU Allocation Account in accordance with the adjusted national allocation table to the operator holding account according to Article 53(2) of Regulation No 389/2013.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0094"><NO.P>94.</NO.P><TXT>As for the second aspect, namely the origin of those allowances, while neither Directive 2003/87, nor Decision 2011/278 nor Delegated Regulation 2019/331 specifically deal with the adjustment of free allowances due to a decision by a court and, although Article 24(2) of Decision 2011/278 does not refer to an increase in allowances as a result of a decision by a court, that latter article can be applied to such cases by analogy. The difference to the case in which such a decision by a court is taken prior to the end of the trading period and the situation when it is taken thereafter, is that the respective allowances can no longer be deducted from the number of allowances to be auctioned by the respective Member State during that period.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0095"><NO.P>95.</NO.P><TXT>While it is not the purpose of the market stability reserve to provide certificates for claims that have remained unfulfilled at the end of the third marketing period, but rather to tackle structural supply demand imbalances in the emission trading scheme,<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0079"><P>See, to that, effect recital 4 of Decision 2015/1814.</P></NOTE> allowances from this source are suited to the first purpose. The reason for this is the structure and the purpose of the market stability reserve.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0096"><NO.P>96.</NO.P><TXT>According to Article 1(2), (3) and (5) of Decision 2015/1814, the market stability reserve is made up of: (i) 900 million allowances which were meant to be auctioned during the years 2019 and 2020 according to the third column of Annex IV to Regulation No 176/2014,<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0080"><P>Commission Regulation (EU) No 176/2014 of <DATE ISO="20140225">25 February 2014</DATE> amending Regulation (EU) No 1031/2010 in particular to determine the volumes of greenhouse gas emission allowances to be auctioned in 2013-20 (<REF.DOC.OJ COLL="L" NO.OJ="056" PAGE.FIRST="11" DATE.PUB="2014">OJ 2014 L 56, p. 11</REF.DOC.OJ>). As a short-term measure against the surplus of allowances in the market, they had originally been <QUOT.START CODE="2018" ID="QS0115" REF.END="QE0115"/>back-loaded<QUOT.END REF.START="QS0115" CODE="2019" ID="QE0115"/> by reducing the volumes in 2014 to 2016 with the intention of having them auctioned in 2019 and 2020.</P></NOTE> (ii) allowances not allocated to new entrants according to Article 10a(7) of Directive 2003/87 and to installations<?PAGE NO="24"?> that have (partially or fully) ceased their operations or have significantly reduced their capacity (Article 10a(19) and (20) of Directive 2003/87), and (iii) a number of allowances equal to 12% of the total number of allowances in circulation per year<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0081"><P>According to Article 1(4) of Decision 2015/1814 this is the cumulative number of allowances issued in the period since <DATE ISO="20080101">1 January 2008</DATE> and entitlements to use international credits exercised by installations under the EU ETS in respect of emissions up to 31 December of that year, minus the cumulative tonnes of verified emissions from installations under the EU emissions trading system between <DATE ISO="20080101">1 January 2008</DATE> and 31 December of that year, any allowances cancelled and the number of allowances in the reserve.</P></NOTE> if that number exceeds 100 million.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0097"><NO.P>97.</NO.P><TXT>These allocation rules are merely a way of taking a surplus of allowances off the market and to reintroduce parts or all of them back into the market if the number of allowances in circulation falls below a threshold of 400 million allowances in circulation. Allowances that should have been allocated to the operator of an installation, had Directive 2003/87 and Decision 2011/278 been applied correctly, do not constitute such surplus and can therefore be taken from the market stability reserve without affecting the overall number of allocations. Neither is the market stability reserve’s purpose compromised by deducting a limited number of allowances from the market stability reserve and adding them to the number in circulation. As the allowances for the third marketing period which can thus be allocated are of indefinite validity according to the first sentence of Article 13 of Directive 2003/87,<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0082"><P>As amended by Directive 2018/410.</P></NOTE> they can be used by the recipient either for the third trading period or during trading periods beyond the third trading period.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0098"><NO.P>98.</NO.P><TXT>In light of the above I propose to conclude that entitlements to a further free allocation of emission allowances for the third trading period can be met after the end of the third trading period with allowances of the third trading period where the existence of the allowance entitlement is established by a court only after expiry of the third trading period. Allowances for the third trading period do not lapse on expiry of the third trading period.</TXT></NP.ECR></GR.SEQ></GR.SEQ><GR.SEQ LEVEL="1"><TITLE><TI><NP><NO.P><HT TYPE="BOLD">V.</HT></NO.P><TXT><HT TYPE="BOLD">Conclusion</HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0099"><NO.P>99.</NO.P><TXT>In the light of the foregoing considerations, I propose that the Court should answer the questions referred for a preliminary ruling by the Verwaltungsgericht Berlin (Administrative Court, Berlin, Germany) as follows:</TXT><P><LIST TYPE="ARAB"><ITEM><NP><NO.P>(1)</NO.P><TXT>The CO<HT TYPE="SUB">2</HT> released into the atmosphere as part of the processing of natural gas (in the form of sour gas) in the Claus process, by means of the CO<HT TYPE="SUB">2</HT> inherent in natural gas being separated from the gas mixture but which is not itself used in the course of the chemical desulphurisation reaction, does not occur as a result of the process referred to in Article 3(h)(v) of Commission Decision 2011/278/EU of <DATE ISO="20110427">27 April 2011</DATE> determining transitional Union-wide rules for harmonised free allocation of emission allowances pursuant to Article 10a of Directive 2003/87/EC of the European Parliament and of the Council because the sour gas, which is a carbon-containing raw material is not <QUOT.START CODE="2018" ID="QS0116" REF.END="QE0116"/>used<QUOT.END REF.START="QS0116" CODE="2019" ID="QE0116"/> within the meaning of that provision.</TXT></NP></ITEM><ITEM><NP><NO.P>(2)</NO.P><TXT>The allocation of free emission allowances must be carried out on the basis of the heat benchmark if emissions that are subject to the emissions trading scheme were to satisfy both the defining conditions of a heat benchmark sub-installation and the defining conditions of a process emissions sub-installation. This is so because allocations under a heat benchmark sub-installation take precedence over allocations under a process emissions sub-installation.</TXT></NP></ITEM><?PAGE NO="25"?><ITEM><NP><NO.P>(3)</NO.P><TXT>Entitlements to a further free allocation of emission allowances for the third trading period can be met after the end of the third trading period with allowances of the third trading period where the existence of the allowance entitlement is established by a court only after expiry of the third trading period. Allowances for the third trading period do not lapse on expiry of the third trading period.</TXT></NP></ITEM></LIST></P></NP.ECR></GR.SEQ></CONTENTS.CONCLUSION></CONCLUSION>