<?xml version="1.0" encoding="UTF-8"?><CONCLUSION xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="http://formex.publications.europa.eu/schema/formex-04.cj-20080212.xd"><BIB.CONCLUSION><REF.CASE FILE="ECRCJ1989ENA.0600195901.case.xml"><NO.CASE>88/88</NO.CASE></REF.CASE><NO.CELEX>61988C0088</NO.CELEX><NO.SEQ>0015.0001</NO.SEQ><PAGE.FIRST>1960</PAGE.FIRST><PAGE.SEQ>1</PAGE.SEQ><PAGE.LAST>1960</PAGE.LAST><PAGE.TOTAL>1</PAGE.TOTAL></BIB.CONCLUSION><CURR.TITLE><LEFT>OPINION OF MR JACOBS —CASE 88/88</LEFT><RIGHT>REWE UBERWACHUNGSSTELLE FUR MILCHERZEUGNISSE UND HANDELSKURSEN</RIGHT></CURR.TITLE><CONTENTS.CONCLUSION><TITLE><TI><P><HT TYPE="UC">Opinion of the Advocate General</HT></P></TI></TITLE><P>Mr Advocate General Jacobs delivered his Opinion on <DATE ISO="19890426">26 April 1989</DATE>.<NOTE NOTE.ID="E0001" NUMBERING="STAR"><P>Original language: English.</P></NOTE> He proposed that the Court should rule as follows:</P><QUOT.S LEVEL="1"><P><QUOT.START ID="QS0001" REF.END="QE0001" CODE="2018"/>Article 3(2) of Council Regulation (EEC) No 2967/76 does not prohibit national rules whereby any batch of goods from which a sample has been taken must be withheld from the market until the inspection procedure is completed. Such national rules need not specify any time-limit for a suspension from the market; but any such suspension must not exceed the time which is necessary for the purposes of an effective system of inspection.<QUOT.END ID="QE0001" REF.START="QS0001" CODE="2019"/></P></QUOT.S></CONTENTS.CONCLUSION></CONCLUSION>