Brussels, 13.7.2026

SWD(2026) 229 final

COMMISSION STAFF WORKING DOCUMENT

Updated climate tracking and digital tagging of the recovery and resilience plan of Romania

Accompanying the document

Proposal for a COUNCIL IMPLEMENTING DECISION

amending Implementing Decision of 29 October 2021 on the approval of the assessment of the recovery and resilience plan for Romania

{COM(2026) 378 final}


Executive summary

The modifications submitted by Romania under Article 21(1) of Regulation (EU) 2021/241 affect 92 measures in total. Romania requested to modify these 92 measures due to objective circumstances.

In addition, the proposed amendments to the Romania recovery and resilience plan aim to adapt the plan in line with the Communication from the Commission to the European Parliament and the Council “NextGenerationEU – the Road to 2026” 1 . 

Based on the assessment of the submitted modification, the Romanian modified plan receives an A-rating on all criteria except for costing, where the plan receives a B-rating (unchanged from the original plan assessment).

(1)
Balanced Response

(2)
CSRs

(3)
Growth, jobs…

(4)
DNSH

(5)
Green target

(6)
Digital target

(7)
Lasting impact

(8)
M & T

(9)
Costing

(10)
Control Systems

(11)
Cohe
-rence

(12) REPowerEU

(13) Cross-border

A

A

A

A

A (39.1%)

A (24.0%)

A

A

B

A

A

A

A


Updated climate tracking and digital tagging of the recovery and resilience plan of Romania

The table below presents the detailed application of the climate tracking and digital tagging methodologies set out respectively in Annexes VI and VII to Regulation (EU) 2021/241 in the modified Romanian recovery and resilience plan.

Int. Field = intervention field.

Coeff. = Coefficient for the calculation of support to climate change objectives and to digital transition, on the basis of Annex VI and Annex VII of the RRF Regulation.

Measure 

ID 

Measure/ 

Sub-Measure Name 

Budget 

(EUR m) 

Climate 

Digital 

Int.

field 

Coeff. % 

Int. 

field 

Coeff. % 

C1.I.4b

Rehabilitation of existing accumulations that require emergency interventions for safe operation

33.00

40

40%

C1.I.5

Appropriate endowment of river basin administrations for flood monitoring, prevention and emergency response

1.60

035

100%

C1.I.5

Appropriate endowment of river basin administrations for flood monitoring, prevention and emergency response - Other types of ICT infrastructure

5.20

1.60

100%

C1.I.6

Delivery of the water cadastre

30.00

055

100%

C2.I.1

Afforestation and reforestation national campaign, including urban forests

306.88

035

100%

C2.I.2

Modern production capacities of forest reproduction material

50.00

035

100%

C2.I.3b

Identification of potential areas for strict protection in natural terrestrial and marine habitats in line with the EU Biodiversity Strategy for 2030

5.00

050

40%

C2.I.4d

Monitoring system for wild sturgeons along the Lower Danube

3.99

055

100%

C2.I.5

Integrated flood risk mitigation systems in forest river basins

22.00

040

40%

C3.I.1a

Construction of voluntary collection centres

240.11

042

40%

C3.I.1b

Establishment of integrated municipal waste management systems

39.39

042

40%

C3.I.1b

Establishment of integrated municipal waste management systems

33.37

055

100%

C3.I.1c

Establishment of integrated municipal waste management systems

16.18

042

40%

C3.I.1c

Establishment of integrated municipal waste management systems

0.56

044

40%

C3.I.1d

Establishment of integrated municipal waste management systems

76.15

042

40%

C3.I.2

Construction or delivery of infrastructure for manure and other compostable agricultural waste management

47.01

044

40%

C3.I.3a

Public monitoring, control and institutional capacities for waste management

0.36

042

40%

C3.I.3a

Public monitoring, control and institutional capacities for waste management

11.97

055

100%

C4.I.1

Modernisation and/or upgrading of railway infrastructure - Modernisation of TEN-T Core sections - Railway infrastructure construction

364.89

064

100%

C4.I.1

Modernisation and/or upgrading of railway infrastructure - Modernisation of TEN-T Comprehensive sections - Railway infrastructure construction

353.12

065

100%

C4.I.1

Modernisation and/or upgrading of railway infrastructure - “Quick wins” sections TEN-T Core

366.46

067

100%

C4.I.1a

Modernisation and/or upgrading of railway infrastructure

561.87

068

100%

C4.I.2

Railway rolling stock - Electric Locomotives, EMU/HEMU railcars, wagon retraction

241.64

072bis

100%

C4.I.3

Increasing the sustainability of road infrastructure on TEN-T network, road charging, traffic management - TEN-T Core sections (A1, A7) - ITS infrastructure

8.06

063

100%

C4.I.3

Increasing the sustainability of road infrastructure on TEN-T network, road charging, traffic management - Infrastructure for charging and control - digital

101.15

063bis

40%

063

100%

C4.I.3a

Increasing the sustainability of road infrastructure on TEN-T network, road charging, traffic management

47.90

063

100%

C4.I.5

Increasing the road safety - ITS infrastructure (other then A1, A3, A7, A8)

77.18

063

100%

C5.I.1

Establishment of a renovation wave fund to finance works to increase the energy efficiency of the existing building stock - residential buildings

323.73

025bis

100%

C5.I.1

Establishment of a renovation wave fund to finance works to increase the energy efficiency of the existing building stock - public buildings

184.35

026bis

100%

C5.I.1a.1

Establishment of a renovation wave fund to finance works to increase the energy efficiency of the existing building stock - residential buildings

680.32

025bis

100%

C5.I.1a.3

Establishment of a renovation wave fund to finance works to increase the energy efficiency of the existing building stock - public buildings

700.00

026bis

100%

C5.I.2

Publication of the National Digital Building Register

5.00

011

100%

C5.I.4

Circular economy and increased energy efficiency of historical buildings

5.05

026

40%

C5.I.4

Circular economy and increased energy efficiency of historical buildings

1.70

01

100%

C5.I.4

Circular economy and increased energy efficiency of historical buildings

5.00

023

40%

C6.I.2

Green hydrogen production capacities for the use as electricity storage and/or for the decarbonisation of industry

86.50

032

100%

C6.I.3

Construction of flexible and highly efficient gas-fired electricity and heat generation (CHP) in district heating

86.38

034

40%

C7.R.1

Development of a unitary framework for defining the architecture of a government cloud system

11.89

011

100%

C7.I.1

Deployment of the Government Cloud Infrastructure

374.73

011bis

40%

011bis

100%

C7.I.2

Cloud development and migration

187.05

011

100%

C7.I.3

Establishment of eHealth

280.00

095

100%

C7.I.4

Digitalisation of the judiciary

127.31

011quater

100%

C7.I.4

Digitalisation of the judiciary - construction of energy efficient buildings

35.00

025ter

100%

C7.I.4

Digitalisation of the judiciary

80.00

011quater

100%

C7.I.5

Digitalisation in the field of the environment

47.95

011

100%

C7.I.6

Digitalisation in employment and social protection

85.00

011

100%

C7.I.7

Introduction of electronic forms (eForms) in the field of public procurement

0.85

011

100%

C7.I.8

Electronic identity card and digital signature

109.40

011ter

100%

C7.I.9

Digitalisation of the non-governmental organisations sector

12.00

010

100%

C7.I.10

Digital transformation in civil service management

10.00

011

100%

C7.I.11

Support to the use of communication services in white areas

94.00

054

100%

C7.I.12

Ensuring cybersecurity protection for both public and private ITC infrastructures important for national security

100.00

021quinquies

100%

C7.I.13

Development of security systems for the protection of the government spectrum

28.86

055

100%

C7.I.14

Increase of the resilience and cybersecurity of Internet Service Provider infrastructure services provided to public authorities in Romania

18.39

021quinquies

100%

C7.I.15

Cybersecurity skills for the identified entities

11.31

108

100%

C7.I.16

Training programme for civil servants on digital skills

20.00

108

100%

C7.I.17

Digitalisation of libraries

18.90

108

100%

C7.I.18

Digital transformation and Robotic Process Automation in public administration

5.00

011

100%

C7.I.18

Digital transformation and Robotic Process Automation in public administration

9.80

011

100%

C7.I.19

Upskilling/reskilling of employees in firms

19.00

108

100%

C8.I.1

Facilitating taxpayers’ compliance through access to digital services

4.20

011

100%

C8.I.2

Improving tax and tax administration processes

196.40

011

100%

C8.I.3

Ensuring the capacity to respond to current and future information challenges, including in the context of the pandemic, through the digital transformation of Ministry of Finance / National Agency for Fiscal Administration

78.50

011

100%

C8.I.4

Establishment of electronic customs

28.10

011

100%

C8.I.5

Enhancing the budgetary programming mechanism

3.57

011

100%

C8.I.5

Enhancing the budgetary programming mechanism

0.43

108

100%

C8.I.6

Economic modelling instrument (Pension Reform Options Simulation Toolkit) to expand institutional capacity to forecast pension expenditures

0.40

011

100%

C8.I.8

Establishment of the National Development Bank - Other types of ICT infrastructure

9.00

055

100%

C8.I.9

Supporting the process of assessing pension files

1.27

011

100%

C8.I.10

Advanced e-services through digitalisation of the pension system

61.88

011

100%

C9.I.1

Digital platforms on legislative transparency, de-bureaucratisation and procedural simplification for business.

5.30

011

100%

C9.I.2d

Financial instruments for the private sector - Fund of funds for digitisation, climate action, and other areas of interest and Financial instruments for the private sector - Digitising SMEs

16.00

010

100%

C9.I.2d

Financial instruments for the private sector - Fund of funds for digitisation, climate action, and other areas of interest and Financial instruments for the private sector - Low carbon economy

33.00

027

100%

C9.I.3a

Private sector aid schemes - Aid scheme for the digitalisation of SMEs

212.50

010

100%

C9.I.3a

Private sector aid schemes - Aid scheme for the digitalisation of SMEs - Investments in advanced technologies

44.00

021quater

100%

C9.I.4

Cross-border and multi-country projects - Low Power Processors and Semiconductor Chips

400.00

021quater

100%

C10.I.1

Sustainable urban mobility - Clean urban transport rolling stock

580.00

074

100%

C10.I.1

Sustainable urban mobility - ITS

100.00

076

100%

C10.I.1

Sustainable urban mobility - Other ICT infrastructures

175.00

021ter

100%

C10.I.1

Sustainable urban mobility - Recharging points for electric vehicles

25.00

077

100%

C10.I.1

Sustainable urban mobility - Cycling lanes constructed

69.56

075

100%

C10.I.2

Construction of housing for youth and for professionals in health and education - Construction of energy efficient buildings

57.31

025ter

40%

C10.I.2

Construction of housing for youth and for professionals in health and education - Other types of ICT infrastructure

0.50

055

100%

C10.I.3

Renovation of public buildings to support better public service delivery by administrative territorial units

220.93

026bis

100%

C10.I.3a

Renovation of public buildings to support better public service delivery by administrative territorial units

287.50

026bis

100%

C10.I.4

Producing/updating in GIS format of spatial planning and urban planning documents

17.26

011

100%

C11.I.1

Promotion of the 12 touristic/ cultural routes

9.98

011

100%

C11.I.4

Construction of at least 236 km of cycling routes

24.30

075

100%

C11.I.6

Establishment of digital system for cultural funding processes

3.75

011

100%

C11.I.7

Accelerating the digitalisation of film production and distribution

5.46

021bis

100%

C12.I.1

Pre-hospital medical infrastructure

10.97

025ter

40%

C12.I.2

Public hospital infrastructure

11.19

095

100%

C12.I.2

Public hospital infrastructure

91.27

025ter

40%

C12.I.3

Public hospitals

75.00

095

40%

C12.I.3

Public hospitals

7.00

025ter

100%

C13.I.3

The establishment of the labour voucher system for domestic providers and service beneficiaries

4.03

055

100%

C14.R.1

Enhancing the quality of government decision-making

2.80

011

100%

C14.R.2

Increasing strategic governance for climate and sustainable development and environmental policies

5.23

011

100%

C14.R.3

Modernising human resources management in the public sector

5.00

011

100%

C14.R.9

Improve the procedural framework for the implementation of corporate governance principles in state-owned enterprises

1.46

011

100%

C14.I.5

Monitoring and implementation of the plan

12.84

011

100%

C15.I.1a

Construction and equipping of crèches of 80 crèches - construction of new energy efficient buildings

137.45

025ter

40%

C15.I.1b

Construction and equipping of crèches of 30 crèches - construction of new energy efficient buildings

51.55

025ter

40%

C15.I.2

Setting up, equipping and approving complementary services

0.26

012

100%

C15.I.4

Supporting educational establishments with medium and high risk of drop-outs - part of digitalisation

96.00

012

100%

C15.I.6

Building and equipping vocational campuses within regional consortia - Construction of new energy efficient buildings

140.00

025ter

40%

C15.I.6

Building and equipping vocational campuses within regional consortia - IT services and applications for digital skills

16.90

012

100%

C15.I.8

Digital pedagogy training programme(s) for teaching staff

80.00

108

100%

C15.I.9

Digital equipment and technological resources for schools and extracurricular educational establishments

478.50

108

100%

C15.I.10

Green-schools network development and purchase of green minibuses - Energy renovation

9.14

026

40%

C15.I.10

Green-schools network development and purchase of green minibuses - Construction of new energy efficient buildings

52.96

025ter

40%

C15.I.10

Green-schools network development and purchase of green minibuses - Purchase of electric minibuses

200.00

074

100%

C15.I.11

Provision of equipment for pre-university classrooms and school science laboratories/school cabinets - Part of digital laboratories

60.00

012

100%

C15.I.13

Equipping of IT laboratories in vocational education and training (VET) schools

9.00

012

100%

C15.I.14

Equipping of practice workshops in VET schools - Digitisation part

16.50

012

100%

C15.I.16

Digitisation of universities and their preparation for the digital professions of the future - Universities

234.00

108

100%

C15.I.17

Ensuring university infrastructure (accommodation, canteens, recreation facilities) - Construction of new energy efficient buildings

66.64

025ter

40%

C15.I.17

Ensuring university infrastructure (accommodation, canteens, recreation facilities) - Energy renovation

69.16

026

40%

C16.R.1

Creating a legal framework for the use of state land as acceleration areas for RES investments - digital tagging*

0.76

011

100%

C16.I.2

New capacities for electricity generation from renewable sources

460.00

029

100%

C16.I.4

Grant Vouchers to accelerate the rollout of renewable energy by households

610.76

029

100%

C16.I.5

Digitalisation and modernisation of the national electricity transmission network

29.56

029

100%

C16.I.5

Digitalisation and modernisation of the national electricity transmission network*

11.20

010bis

100%

C16.I.5

Digitalisation and modernisation of the national electricity transmission network - Teletrans SA*

8.44

055

100%

C16.I.7

Grant Vouchers to support households’ energy efficiency upgrades - Axis I - PV

156.97

029

100%

C16.I.8

Contracts for Difference allocation

62.04

028

100%

C16.I.9

Industrial chain of production and/or assembly and/or recycling of batteries, cells and photovoltaic panels (including ancillary equipment), production of raw materials used in the associated industry, and new electricity storage capacities – Electricity*

80.00

033

100%

033

40%

C16.I.10

Ensuring energy efficiency in the industrial sector

64.00

024ter

100%

* Reforms and investments in the REPowerEU chapter are not taken into account when calculating the plan’s contribution to the digital target requirement set by Regulation (EU) 2021/241.

(1)

4.6.2025 COM(2025) 310 final