<?xml version="1.0" encoding="UTF-8"?><CONCLUSION NNC="YES" xmlns:fmx="http://opoce" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="http://formex.publications.europa.eu/schema/formex-05.58-20161101.xd"><BIB.CONCLUSION><REF.CASE FILE="n.a."><NO.CASE>C-300/20</NO.CASE></REF.CASE><NO.CELEX>62020CC0300</NO.CELEX><NO.ECLI ECLI="ECLI:EU:C:2021:746">EU:C:2021:746</NO.ECLI><NO.SEQ>0001</NO.SEQ><PAGE.FIRST.ECR>1</PAGE.FIRST.ECR><PAGE.SEQ>1</PAGE.SEQ><PAGE.LAST.ECR>27</PAGE.LAST.ECR><PAGE.TOTAL>27</PAGE.TOTAL></BIB.CONCLUSION><CURR.TITLE><PAGE.HEADER><P><HT TYPE="SC">Opinion of Mr Campos Sánchez-Bordona – Case C‑300/20</HT></P><P><HT TYPE="SC">Bund Naturschutz in Bayern</HT></P></PAGE.HEADER></CURR.TITLE><TITLE><TI><P><HT TYPE="UC">Opinion of Advocate General</HT></P><P><HT TYPE="UC">Campos Sánchez-Bordona</HT></P><P>delivered on <DATE ISO="20210916">16 September 2021</DATE><NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0001"><P>Original language: Spanish.</P></NOTE></P></TI><STI><P><HT TYPE="BOLD">Case C‑300/20</HT></P><P>Bund Naturschutz in Bayern eV</P><P>v</P><P>Landkreis Rosenheim<HT TYPE="NORMAL">,</HT></P><P>interveners:</P><P>Landesanwaltschaft Bayern<HT TYPE="NORMAL">,</HT></P><P>Vertreter des Bundesinteresses beim Bundesverwaltungsgericht</P><P><HT TYPE="NORMAL">(Request for a preliminary ruling from the Bundesverwaltungsgericht (Federal Administrative Court, Germany))</HT></P></STI></TITLE><INTERMEDIATE><INDEX IDX.CLOSE=")" SEPARATOR=" – " IDX.OPEN="("><KEYWORD>Reference for a preliminary ruling</KEYWORD><KEYWORD>Environment</KEYWORD><KEYWORD>Assessment of the effects of certain plans and programmes on the environment</KEYWORD><KEYWORD>Strategic environmental assessment</KEYWORD><KEYWORD>Definition of plans and programmes</KEYWORD><KEYWORD>Landscape conservation regulation which lays down general prohibitions and development consent requirements not specific to particular projects</KEYWORD><KEYWORD>Legal consequences of the absence of a strategic environmental assessment</KEYWORD><KEYWORD>Temporal limitation of the effects of the judgment</KEYWORD><KEYWORD>Power of the national court to maintain the effects of national measures on a temporary basis</KEYWORD></INDEX></INTERMEDIATE><CONTENTS.CONCLUSION><GR.SEQ LEVEL="1"><NP.ECR IDENTIFIER="NP0001"><NO.P>1.</NO.P><TXT>This reference for a preliminary ruling raises issues similar to those addressed by the Court in the judgment of <DATE ISO="20200625">25 June 2020</DATE>, concerning wind turbines at Aalter and Nevele,<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0002"><P>Judgment in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">A and Others (Wind turbines at Aalter and Nevele)</HT></NAME.CASE> (<NO.CASE>C‑24/19</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2020:503">EU:C:2020:503</NO.ECLI></REF.DOC.ECR>; <QUOT.START CODE="2018" ID="QS0001" REF.END="QE0001"/>the judgment in <HT TYPE="ITALIC">Wind turbines at Aalter and Nevele</HT><QUOT.END REF.START="QS0001" CODE="2019" ID="QE0001"/>).</P></NOTE> concerning the [strategic] environmental assessment (‘SEA’) of plans and programmes.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0002"><NO.P>2.</NO.P><TXT>In my Opinion in that case, I stated that the assessment of the effects of certain <QUOT.START CODE="2018" ID="QS0002" REF.END="QE0002"/>projects<QUOT.END REF.START="QS0002" CODE="2019" ID="QE0002"/> or certain <QUOT.START CODE="2018" ID="QS0003" REF.END="QE0003"/>plans and programmes<QUOT.END REF.START="QS0003" CODE="2019" ID="QE0003"/> on the environment is one of the key instruments available under EU law for attaining a high level of protection of the environment.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0003"><P>Opinion of <REF.DOC.ECR><DATE ISO="20200303">3 March 2020</DATE> (<NO.CASE>C‑24/19</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2020:143">EU:C:2020:143</NO.ECLI></REF.DOC.ECR>; <QUOT.START CODE="2018" ID="QS0004" REF.END="QE0004"/>Opinion in <HT TYPE="ITALIC">Wind turbines at Aalter and Nevele</HT><QUOT.END REF.START="QS0004" CODE="2019" ID="QE0004"/>; point 1).</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0003"><NO.P>3.</NO.P><TXT>The environmental assessment of <HT TYPE="ITALIC">projects</HT> is governed by Directive 2011/92/EU,<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0004"><P>Directive of the European Parliament and of the Council of <DATE ISO="20111213">13 December 2011</DATE> on the assessment of the effects of certain public and private projects on the environment (<REF.DOC.OJ COLL="L" NO.OJ="026" PAGE.FIRST="1" DATE.PUB="2012">OJ 2012 L 26, p. 1</REF.DOC.OJ>; <QUOT.START CODE="2018" ID="QS0005" REF.END="QE0005"/>the EIA Directive<QUOT.END REF.START="QS0005" CODE="2019" ID="QE0005"/>).</P></NOTE> the environmental assessment of <HT TYPE="ITALIC">plans and programmes</HT> by Directive 2001/42/EC.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0005"><P>Directive of the European Parliament and of the Council of <DATE ISO="20010627">27 June 2001</DATE> on the assessment of the effects of certain plans and programmes on the environment (<REF.DOC.OJ COLL="L" NO.OJ="197" PAGE.FIRST="30" DATE.PUB="2001">OJ 2001 L 197, p. 30</REF.DOC.OJ>). Also known as the ‘Strategic Environmental Assessment’ (<QUOT.START CODE="2018" ID="QS0006" REF.END="QE0006"/>the SEA Directive<QUOT.END REF.START="QS0006" CODE="2019" ID="QE0006"/>).</P></NOTE> The two directives complement one another: because the latter <QUOT.START CODE="2018" ID="QS0007" REF.END="QE0007"/>is intended to bring forward the<?PAGE NO="2"?> environmental impact assessment to the strategic planning stage of the actions taken by national authorities. The study of the environmental effects required is, therefore, broader or more comprehensive than that relating to a specific project<QUOT.END REF.START="QS0007" CODE="2019" ID="QE0007"/>.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0006"><P>Opinion in <HT TYPE="ITALIC">Wind turbines at Aalter and Nevele</HT>, point 36.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0004"><NO.P>4.</NO.P><TXT>As I stated at that time, <QUOT.START CODE="2018" ID="QS0008" REF.END="QE0008"/>on that basis, the difficulty lies in establishing exactly how far the [strategic environmental assessment] requirements [under the] SEA [Directive] extends. It is clear that it ranks higher than the assessment of specific projects but also that it should not apply to all of a Member State’s legislation concerning the environment<QUOT.END REF.START="QS0008" CODE="2019" ID="QE0008"/><NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0007"><P><HT TYPE="ITALIC">Ibidem</HT>, point 37.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0005"><NO.P>5.</NO.P><TXT>This case is a good demonstration of that difficulty, which seems to remain notwithstanding the clarifications contained in the judgment in <HT TYPE="ITALIC">Wind turbines at Aalter and Nevele</HT>. It will be necessary to provide an even more precise definition of when a plan or programme contains a reference framework for the preparation of projects covered by Annexes I and II to the EIA Directive and therefore requires a prior SEA.</TXT></NP.ECR></GR.SEQ><GR.SEQ LEVEL="1"><TITLE><TI><NP><NO.P><HT TYPE="BOLD">I.</HT></NO.P><TXT><HT TYPE="BOLD">Legal framework</HT></TXT></NP></TI></TITLE><GR.SEQ LEVEL="2"><TITLE><TI><NP><NO.P><HT TYPE="BOLD"><HT TYPE="ITALIC">A.</HT></HT></NO.P><TXT><HT TYPE="BOLD"><HT TYPE="ITALIC">EU law – Directive 2001/42</HT></HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0006"><NO.P>6.</NO.P><TXT>According to Article 1:</TXT><QUOT.S LEVEL="1"><P><QUOT.START CODE="2018" ID="QS0009" REF.END="QE0009"/>The objective of this Directive is to provide for a high level of protection of the environment and to contribute to the integration of environmental considerations into the preparation and adoption of plans and programmes with a view to promoting sustainable development, by ensuring that, in accordance with this Directive, an environmental assessment is carried out of certain plans and programmes which are likely to have significant effects on the environment.<QUOT.END REF.START="QS0009" CODE="2019" ID="QE0009"/></P></QUOT.S></NP.ECR><NP.ECR IDENTIFIER="NP0007"><NO.P>7.</NO.P><TXT>Article 2 states:</TXT><P><QUOT.S LEVEL="1"><ALINEA><P><QUOT.START CODE="2018" ID="QS0010" REF.END="QE0010"/>For the purposes of this Directive:</P><LIST TYPE="alpha"><ITEM><NP><NO.P>(a)</NO.P><TXT><QUOT.START CODE="201C" ID="QS0011" REF.END="QE0011"/>plans and programmes<QUOT.END REF.START="QS0011" CODE="201D" ID="QE0011"/> shall mean plans and programmes, including those co-financed by the European Community, as well as any modifications to them:</TXT><P><LIST TYPE="NDASH"><ITEM><P>which are subject to preparation and/or adoption by an authority at national, regional or local level or which are prepared by an authority, through a legislative procedure by Parliament or Government, and</P></ITEM><ITEM><P>which are required by legislative, regulatory or administrative provisions;</P></ITEM></LIST></P></NP></ITEM><ITEM><NP><NO.P>(b)</NO.P><TXT><QUOT.START CODE="201C" ID="QS0012" REF.END="QE0012"/>environmental assessment<QUOT.END REF.START="QS0012" CODE="201D" ID="QE0012"/> shall mean the preparation of an environmental report, the carrying out of consultations, the taking into account of the environmental report and the results of the consultations in decision-making and the provision of information on the decision in accordance with Articles 4 to 9;</TXT></NP></ITEM></LIST><P>…<QUOT.END REF.START="QS0010" CODE="2019" ID="QE0010"/></P></ALINEA></QUOT.S></P></NP.ECR><?PAGE NO="3"?><NP.ECR IDENTIFIER="NP0008"><NO.P>8.</NO.P><TXT>Article 3 provides:</TXT><P><QUOT.S LEVEL="1"><PARAG IDENTIFIER="003.001"><NO.PARAG><QUOT.START CODE="2018" ID="QS0013" REF.END="QE0013"/>1.</NO.PARAG><ALINEA>An environmental assessment, in accordance with Articles 4 to 9, shall be carried out for plans and programmes referred to in paragraphs 2 to 4 which are likely to have significant environmental effects.</ALINEA></PARAG><PARAG IDENTIFIER="003.002"><NO.PARAG>2.</NO.PARAG><ALINEA><P>Subject to paragraph 3, an environmental assessment shall be carried out for all plans and programmes,</P><LIST TYPE="alpha"><ITEM><NP><NO.P>(a)</NO.P><TXT>which are prepared for agriculture, forestry, fisheries, energy, industry, transport, waste management, water management, telecommunications, tourism, town and country planning or land use and which set the framework for future development consent of projects listed in Annexes I and II to Directive 85/337/EEC, or</TXT></NP></ITEM><ITEM><NP><NO.P>(b)</NO.P><TXT>which, in view of the likely effect on sites, have been determined to require an assessment pursuant to Article 6 or 7 of Directive 92/43/EEC.</TXT></NP></ITEM></LIST></ALINEA></PARAG><PARAG IDENTIFIER="003.003"><NO.PARAG>3.</NO.PARAG><ALINEA>Plans and programmes referred to in paragraph 2 which determine the use of small areas at local level and minor modifications to plans and programmes referred to in paragraph 2 shall require an environmental assessment only where the Member States determine that they are likely to have significant environmental effects.</ALINEA></PARAG><PARAG IDENTIFIER="003.004"><NO.PARAG>4.</NO.PARAG><ALINEA>Member States shall determine whether plans and programmes, other than those referred to in paragraph 2, which set the framework for future development consent of projects, are likely to have significant environmental effects.</ALINEA></PARAG><PARAG IDENTIFIER="003.005"><NO.PARAG>5.</NO.PARAG><ALINEA>Member States shall determine whether plans or programmes referred to in paragraphs 3 and 4 are likely to have significant environmental effects either through case-by-case examination or by specifying types of plans and programmes or by combining both approaches. For this purpose Member States shall in all cases take into account relevant criteria set out in Annex II, in order to ensure that plans and programmes with likely significant effects on the environment are covered by this Directive.</ALINEA><ALINEA>…<QUOT.END REF.START="QS0013" CODE="2019" ID="QE0013"/></ALINEA></PARAG></QUOT.S></P></NP.ECR></GR.SEQ><GR.SEQ LEVEL="2"><TITLE><TI><NP><NO.P><HT TYPE="BOLD"><HT TYPE="ITALIC">B.</HT></HT></NO.P><TXT><HT TYPE="BOLD"><HT TYPE="ITALIC">German law</HT></HT></TXT></NP></TI></TITLE><GR.SEQ LEVEL="3"><TITLE><TI><NP><NO.P><HT TYPE="ITALIC">1.</HT></NO.P><TXT><HT TYPE="ITALIC">Gesetz über die Umweltverträglichkeitsprüfung (UVPG) (Law on the Environmental Impact Assessment)</HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0009"><NO.P>9.</NO.P><TXT>Paragraph 2(7)<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0008"><P>Version of <DATE ISO="20100224">24 February 2010</DATE> (BGBl. I, p. 94), as amended by Paragraph 2 of the Law of <DATE ISO="20191212">12 December 2019</DATE> (BGBl. I, p. 2513).</P></NOTE> states:</TXT><P><QUOT.S LEVEL="1"><PARAG IDENTIFIER="002.007"><NO.PARAG><QUOT.START CODE="2018" ID="QS0014" REF.END="QE0014"/>(7)</NO.PARAG><ALINEA><P>For the purposes of this Law, the only plans and programmes to be regarded as such shall be those provided for in federal legislation or in legal acts of the European Union</P><LIST TYPE="ARAB"><ITEM><NP><NO.P>1.</NO.P><TXT>which are subject to preparation and adoption by a public authority,</TXT></NP></ITEM><?PAGE NO="4"?><ITEM><NP><NO.P>2.</NO.P><TXT>which are prepared by an authority for adoption by a government or through a legislative procedure, or</TXT></NP></ITEM><ITEM><NP><NO.P>3.</NO.P><TXT>which are prepared by a third party for adoption by a public authority.</TXT></NP></ITEM></LIST><P>…<QUOT.END REF.START="QS0014" CODE="2019" ID="QE0014"/></P></ALINEA></PARAG></QUOT.S></P></NP.ECR><NP.ECR IDENTIFIER="NP0010"><NO.P>10.</NO.P><TXT>Paragraph 35 states:</TXT><P><QUOT.S LEVEL="1"><PARAG IDENTIFIER="035.001"><NO.PARAG><QUOT.START CODE="2018" ID="QS0015" REF.END="QE0015"/>(1)</NO.PARAG><ALINEA><P>A strategic environmental assessment shall be carried out in the case of the plans and programmes</P><LIST TYPE="ARAB"><ITEM><NP><NO.P>1.</NO.P><TXT>listed in Annex 5(1), or</TXT></NP></ITEM><ITEM><NP><NO.P>2.</NO.P><TXT>listed in Annex 5(2) which set a framework for decision-making on the permissibility of the projects listed in Annex 1 or projects which, in accordance with <HT TYPE="ITALIC">Land</HT> legislation, require an environmental impact assessment or a preliminary assessment of the particular case.</TXT></NP></ITEM></LIST></ALINEA></PARAG><PARAG IDENTIFIER="035.002"><NO.PARAG>(2)</NO.PARAG><ALINEA>Plans and programmes not provided for in subparagraph 1 shall require a strategic environmental assessment only if they set a framework for decision-making on the permissibility of the projects listed in Annex 1 or other projects and, further to a preliminary assessment of the particular case within the meaning of subparagraph 4, are likely to have significant effects on the environment …</ALINEA></PARAG><PARAG IDENTIFIER="035.003"><NO.PARAG>(3)</NO.PARAG><ALINEA>Plans and programmes set a framework for decision-making on the permissibility of projects if they contain criteria of significance to subsequent decisions on development consent, in particular in relation to the need, scope, location, nature or operating conditions of projects or in relation to the use of resources.</ALINEA><ALINEA>…<QUOT.END REF.START="QS0015" CODE="2019" ID="QE0015"/></ALINEA></PARAG></QUOT.S></P></NP.ECR></GR.SEQ><GR.SEQ LEVEL="3"><TITLE><TI><NP><NO.P><HT TYPE="ITALIC">2.</HT></NO.P><TXT><HT TYPE="ITALIC">Gesetz über Naturschutz und Landschaftspflege (Bundesnaturschutzgesetz – BNatSchG) (Law on Nature Conservation and Landscape Management (Federal Law on Nature Conservation – BNatSchG)) of <DATE ISO="20090729">29 July 2009</DATE></HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0011"><NO.P>11.</NO.P><TXT>Paragraph 20<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0009"><P>Version of <DATE ISO="20090729">29 July 2009</DATE> (BGBl. I, p. 2542), as amended by Paragraph 1 of the Law of <DATE ISO="20170915">15 September 2017</DATE> (BGBl. I, p. 3434).</P></NOTE> provides:</TXT><P><QUOT.S LEVEL="1"><P><QUOT.START CODE="2018" ID="QS0016" REF.END="QE0016"/>…</P><PARAG IDENTIFIER="020.002"><NO.PARAG>(2)</NO.PARAG><ALINEA><P>Parts of nature and the landscape may be protected</P><P>…</P></ALINEA></PARAG><PARAG IDENTIFIER="020.004"><NO.PARAG>4.</NO.PARAG><ALINEA>in accordance with Paragraph 26, as landscape conservation areas,</ALINEA><ALINEA>…<QUOT.END REF.START="QS0016" CODE="2019" ID="QE0016"/></ALINEA></PARAG></QUOT.S></P></NP.ECR><?PAGE NO="5"?><NP.ECR IDENTIFIER="NP0012"><NO.P>12.</NO.P><TXT>Paragraph 26 provides:</TXT><P><QUOT.S LEVEL="1"><PARAG IDENTIFIER="026.001"><NO.PARAG><QUOT.START CODE="2018" ID="QS0017" REF.END="QE0017"/>(1)</NO.PARAG><ALINEA><P>Landscape conservation areas are areas the designation of which as such is legally binding and in which special protection for nature and the landscape is required</P><LIST TYPE="ARAB"><ITEM><NP><NO.P>1.</NO.P><TXT>to assist the conservation, development or restoration of the productive and functional capacity of the ecosystem or of the regenerative capacity and sustainable use of natural assets, including the protection of biotopes and habitats of certain species of wild fauna and flora,</TXT></NP></ITEM><ITEM><NP><NO.P>2.</NO.P><TXT>on account of the diversity, distinctiveness and beauty or the special cultural and historical significance of the landscape, or</TXT></NP></ITEM><ITEM><NP><NO.P>3.</NO.P><TXT>on account of their special significance for recreational purposes.</TXT></NP></ITEM></LIST></ALINEA></PARAG><PARAG IDENTIFIER="026.002"><NO.PARAG>(2)</NO.PARAG><ALINEA>In the light in particular of Paragraph 5(1) and in accordance with more detailed provisions, any activity within a landscape conservation area which alters the character of that area or which runs counter to the special conservation objective pursued shall be prohibited.<QUOT.END REF.START="QS0017" CODE="2019" ID="QE0017"/><NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0010"><P>Following the hearing in this case, Paragraph 22 of the BNatSchG has been supplemented with subparagraphs 2a and 2b, to allow for the maintenance in force of legal acts which defined nature and landscape conservation areas contrary to the SEA Directive as they were subject to a prior SEA.</P></NOTE></ALINEA></PARAG></QUOT.S></P></NP.ECR></GR.SEQ><GR.SEQ LEVEL="3"><TITLE><TI><NP><NO.P><HT TYPE="ITALIC">3.</HT></NO.P><TXT><HT TYPE="ITALIC">Bayerisches Gesetz über den Schutz der Natur, die Pflege der Landschaft und die Erholung in der freien Natur (Bayerisches Naturschutzgesetz – BayNatSchG) (Bavarian Law on Nature Conservation, Landscape Management and Outdoor Recreation (Bavarian Law on Nature Conservation – BayNatSchG)) of <DATE ISO="20110223">23 February 2011</DATE></HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0013"><NO.P>13.</NO.P><TXT>Article 12(1)<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0011"><P>GVBl. p. 82, as amended by Paragraph 11a(4) of the Law of <DATE ISO="20191210">10 December 2019</DATE> (GVBl. p. 686).</P></NOTE> states:</TXT><P><QUOT.S LEVEL="1"><PARAG IDENTIFIER="012.001"><NO.PARAG><QUOT.START CODE="2018" ID="QS0018" REF.END="QE0018"/>(1)</NO.PARAG><ALINEA>Parts of nature and the landscape shall be placed under protection, in accordance with Paragraph 20(2), points 1, 2, 4, 6 and 7, of the Law on Nature Conservation and Landscape Management, by means of a regulation, unless this Law provides otherwise …<QUOT.END REF.START="QS0018" CODE="2019" ID="QE0018"/></ALINEA></PARAG></QUOT.S></P></NP.ECR><NP.ECR IDENTIFIER="NP0014"><NO.P>14.</NO.P><TXT>Article 18 states:</TXT><P><QUOT.S LEVEL="1"><PARAG IDENTIFIER="018.001"><NO.PARAG><QUOT.START CODE="2018" ID="QS0019" REF.END="QE0019"/>(1)</NO.PARAG><ALINEA>An official development consent required under a protective regulation shall be replaced by an official development consent required under other provisions; the latter development consent may be issued only if the conditions for the issue of the development consent required under the protective regulation are met and with the consent of the competent authority under the law governing nature conservation.</ALINEA></PARAG><ALINEA>…<QUOT.END REF.START="QS0019" CODE="2019" ID="QE0019"/></ALINEA></QUOT.S></P></NP.ECR><NP.ECR IDENTIFIER="NP0015"><NO.P>15.</NO.P><TXT>According to Article 51:</TXT><P><QUOT.S LEVEL="1"><PARAG IDENTIFIER="051.001"><NO.PARAG><QUOT.START CODE="2018" ID="QS0020" REF.END="QE0020"/>(1)</NO.PARAG><ALINEA><P>The bodies below shall be competent to do as follows:</P><P>…</P><?PAGE NO="6"?><LIST TYPE="ARAB"><ITEM><NP><NO.P>3.</NO.P><TXT>rural districts and independent authorities, to adopt regulations on nature conservation areas within the meaning of Paragraph 26 of the BNatSchG,</TXT></NP></ITEM></LIST><P>…<QUOT.END REF.START="QS0020" CODE="2019" ID="QE0020"/></P></ALINEA></PARAG></QUOT.S></P></NP.ECR></GR.SEQ><GR.SEQ LEVEL="3"><TITLE><TI><NP><NO.P><HT TYPE="ITALIC">4.</HT></NO.P><TXT><HT TYPE="ITALIC">Verordnung des Landkreises Rosenheim über das Landschaftsschutzgebiet <QUOT.START CODE="2018" ID="QS0021" REF.END="QE0021"/>Inntal Süd<QUOT.END REF.START="QS0021" CODE="2019" ID="QE0021"/> (Regulation of the Rural District of Rosenheim on the <QUOT.START CODE="2018" ID="QS0022" REF.END="QE0022"/>Inntal Süd<QUOT.END REF.START="QS0022" CODE="2019" ID="QE0022"/> landscape conservation area) of <DATE ISO="20130410">10 April 2013</DATE></HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0016"><NO.P>16.</NO.P><TXT>Paragraph 1 of that regulation<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0012"><P>ABl. des Landkreises Rosenheim No 5 of <DATE ISO="20130426">26 April 2013</DATE> (<QUOT.START CODE="2018" ID="QS0023" REF.END="QE0023"/>the Inntal Süd Regulation<QUOT.END REF.START="QS0023" CODE="2019" ID="QE0023"/>).</P></NOTE> provides that <QUOT.START CODE="2018" ID="QS0024" REF.END="QE0024"/>the object of protection shall be the … River Inn, including the river basin and its alluvial plains, shall be protected<QUOT.END REF.START="QS0024" CODE="2019" ID="QE0024"/>.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0017"><NO.P>17.</NO.P><TXT>As regards the conservation objective pursued, Paragraph 3 states:</TXT><P><QUOT.S LEVEL="1"><P><QUOT.START CODE="2018" ID="QS0025" REF.END="QE0025"/>The objective of the <QUOT.START CODE="201C" ID="QS0026" REF.END="QE0026"/>Inntal Süd<QUOT.END REF.START="QS0026" CODE="201D" ID="QE0026"/> landscape conservation area is</P><PARAG IDENTIFIER="003.001"><NO.PARAG>1.</NO.PARAG><ALINEA>to ensure the productive capacity of the ecosystem; in particular to conserve, promote and restore alluvial forests and deadwoods, as well as the living conditions of the typical species of fauna and flora adapted to the foregoing and of their biocenoses;</ALINEA></PARAG><PARAG IDENTIFIER="003.002"><NO.PARAG>2.</NO.PARAG><ALINEA>to preserve the diversity, distinctiveness and beauty of the natural landscape; in particular, to strengthen its character as a riverscape and conserve the rural cultural landscape;</ALINEA></PARAG><PARAG IDENTIFIER="003.003"><NO.PARAG>3.</NO.PARAG><ALINEA>to preserve and optimise the functionality of the water regime in order also to promote the continuity of the course of the River Inn and its tributaries, and the retention of surface water;</ALINEA></PARAG><PARAG IDENTIFIER="003.004"><NO.PARAG>4.</NO.PARAG><ALINEA>to safeguard and preserve for the community the features of the landscape that are significant for the purposes of recreational activity, while at the same time respecting nature and the landscape as much as possible, and to channel recreational traffic.<QUOT.END REF.START="QS0025" CODE="2019" ID="QE0025"/></ALINEA></PARAG></QUOT.S></P></NP.ECR><NP.ECR IDENTIFIER="NP0018"><NO.P>18.</NO.P><TXT>In accordance with Paragraph 4, concerning prohibitions, <QUOT.START CODE="2018" ID="QS0027" REF.END="QE0027"/>in the landscape conservation area, any activity which alters the character of that area or which runs counter to the conservation objective pursued (Paragraph 3) shall be prohibited<QUOT.END REF.START="QS0027" CODE="2019" ID="QE0027"/>.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0019"><NO.P>19.</NO.P><TXT>According to Paragraph 5:</TXT><P><QUOT.S LEVEL="1"><PARAG IDENTIFIER="005.001"><NO.PARAG><QUOT.START CODE="2018" ID="QS0028" REF.END="QE0028"/>(1)</NO.PARAG><ALINEA><P>Consent from the Landratsamt Rosenheim (Rosenheim Rural District Council), as the lower authority responsible for nature conservation (Article 43(2), point 3, of the BayNatSchG) shall be required by anyone who, in a landscape conservation area, intends</P><LIST TYPE="ARAB"><ITEM><NP><NO.P>1.</NO.P><TXT>to erect, change or change the use of any kind of construction [Article 2(1) of the Bayerische Bauordnung (Bavarian Building Code)], even if this does not require consent under the building regulations; such construction include in particular:</TXT><P><LIST TYPE="alpha"><ITEM><NP><NO.P>(a)</NO.P><TXT>buildings such as dwellings, farm and forestry plant building, weekend homes, boathouses, bathing huts, tool sheds, sales kiosks …</TXT></NP></ITEM><ITEM><NP><NO.P>(b)</NO.P><TXT>enclosures and other barriers;</TXT></NP></ITEM><?PAGE NO="7"?><ITEM><NP><NO.P>(c)</NO.P><TXT>jetties and riverbank constructions;</TXT></NP></ITEM><ITEM><NP><NO.P>(d)</NO.P><TXT>changes to the land surface as a result of excavation or filling, in particular the creation and operation of new quarries, gravel pits, sand pits, mud pits or clay pits and other boreholes, and spoil heaps. This does not apply to fillings or excavations covering a surface area of up to 500 m<HT TYPE="SUP">2</HT> and measuring 0.3 m in height or depth for the purpose of improving the land on sites already in agricultural use;</TXT></NP></ITEM></LIST></P></NP></ITEM><ITEM><NP><NO.P>2.</NO.P><TXT>in so far as the constructions in question are not already covered in point 1,</TXT><P><LIST TYPE="alpha"><ITEM><NP><NO.P>(a)</NO.P><TXT>to erect billboards and posters, including advertising devices, with a surface area in excess of 0.5 m<HT TYPE="SUP">2</HT>, provided that they do not constitute residential or business names on residential or business premises;</TXT></NP></ITEM><ITEM><NP><NO.P>(b)</NO.P><TXT>to lay overhead or underground wiring, cabling or piping and to erect masts;</TXT></NP></ITEM><ITEM><NP><NO.P>(c)</NO.P><TXT>to construct or substantially alter roads, paths or spaces, in particular campsites, sports fields, playgrounds and bathing areas or similar facilities;</TXT></NP></ITEM><ITEM><NP><NO.P>(d)</NO.P><TXT>to set up vending vans or to erect, secure and operate sales kiosks and vending machines;</TXT></NP></ITEM></LIST></P></NP></ITEM><ITEM><NP><NO.P>3.</NO.P><TXT>to drive or park motor vehicles of any kind anywhere other than on roads, paths and spaces dedicated to public traffic or park them in such areas; …</TXT></NP></ITEM><ITEM><NP><NO.P>4.</NO.P><TXT>to abstract water above ground or underground to an extent beyond that of permitted public use, to alter bodies of water, their banks or beds, the inflow or outflow of water or the piezometric level, to create new bodies of water or to construct drainage systems;</TXT></NP></ITEM><ITEM><NP><NO.P>5.</NO.P><TXT>drain, dry out or otherwise destroy or cause significant damage to biotopes of special ecological value within the meaning of Paragraph 30 of the BNatSchG and Paragraph 23 of the BayNatSchG, in particular peat bogs, marshes, reed beds, large sedge bogs, wet meadows rich in sedges and reeds, moor grass meadows, natural springs, wooded peat bogs, forests and marshlands and alluvial forests, as well as natural or semi-natural areas of flowing or standing internal waters, including their banks and associated natural or semi-natural riparian vegetation, and natural or semi-natural siltation areas, dead-legs and periodically flooded areas; …</TXT></NP></ITEM><ITEM><NP><NO.P>6.</NO.P><TXT>to plough, to convert into multi-harvest grassland, fertilise, graze or afforest meadows providing litter for livestock;</TXT></NP></ITEM><ITEM><NP><NO.P>7.</NO.P><TXT>to pursue, capture or kill wild animals or to remove their breeding sites, habitats or nests;</TXT></NP></ITEM><ITEM><NP><NO.P>8.</NO.P><TXT>to clear, fell or otherwise remove, in the open countryside and anywhere other than in woodlands, individual trees, hedges, hedgerows or copses or field shrubs that characterise the landscape; …</TXT></NP></ITEM><ITEM><NP><NO.P>9.</NO.P><TXT>to clear forest stands in full or in part, carry out initial afforestation or perform associated clear-cutting of more than 0.5 hectares, convert deciduous, mixed or alluvial forests into forests with a predominantly coniferous content or establish specialised crops (such as tree nurseries);</TXT></NP></ITEM><?PAGE NO="8"?><ITEM><NP><NO.P>10.</NO.P><TXT>to destroy or substantially alter, on the banks of bodies of water, riparian vegetation, reed beds or populations of aquatic plants, invade reed beds or bodies of aquatic plants, or use chemical means to remove or control reed beds or clear ditches; …</TXT></NP></ITEM><ITEM><NP><NO.P>11.</NO.P><TXT>to deposit waste, rubble and other objects, in so far as they are not already subject to the waste regulations, on sites other than those authorised for that purpose, even if the intention is not to landfill within the meaning of the building regulations;</TXT></NP></ITEM><ITEM><NP><NO.P>12.</NO.P><TXT>to camp or park caravans (including folding trailers) or motorised dwelling vehicles anywhere other than on authorised sites, or allow others to do so;</TXT></NP></ITEM><ITEM><NP><NO.P>13.</NO.P><TXT>to allow aircraft within the meaning of the Luftverkehrgesetz (Law on Aviation) to take off or land anywhere other than at authorised aerodromes.</TXT></NP></ITEM></LIST></ALINEA></PARAG><PARAG IDENTIFIER="005.002"><NO.PARAG>(2)</NO.PARAG><ALINEA>Consent shall be granted, without prejudice to other legislative provisions, provided that the intended measure does not produce any of the effects referred to in subparagraph 4 or any such effects can be offset by ancillary stipulations.</ALINEA><ALINEA>…<QUOT.END REF.START="QS0028" CODE="2019" ID="QE0028"/></ALINEA></PARAG></QUOT.S></P></NP.ECR><NP.ECR IDENTIFIER="NP0020"><NO.P>20.</NO.P><TXT>As regards exemptions, Paragraph 7 states:</TXT><P><QUOT.S LEVEL="1"><PARAG IDENTIFIER="007.001"><NO.PARAG><QUOT.START CODE="2018" ID="QS0029" REF.END="QE0029"/>(1)</NO.PARAG><ALINEA>Exemption from the prohibitions laid down in Paragraph 4 of this Regulation may be granted, on a case-by-case basis, in accordance with the conditions laid down in Paragraph 67 of the BNatSchG. …<QUOT.END REF.START="QS0029" CODE="2019" ID="QE0029"/></ALINEA></PARAG></QUOT.S></P></NP.ECR></GR.SEQ></GR.SEQ></GR.SEQ><GR.SEQ LEVEL="1"><TITLE><TI><NP><NO.P><HT TYPE="BOLD">II.</HT></NO.P><TXT><HT TYPE="BOLD">Facts, dispute and questions referred for a preliminary ruling</HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0021"><NO.P>21.</NO.P><TXT>The Landkreis Rosenheim (Rural District of Rosenheim, Germany) adopted the Inntal Süd Regulation, with effect from <DATE ISO="20130427">27 April 2013</DATE>, without subjecting it to an SEA or to an examination prior to such an assessment.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0022"><NO.P>22.</NO.P><TXT>The Inntal Süd Regulation protects an area measuring <FT TYPE="NUMBER">4021</FT> hectares, approximately 650 hectares less than that covered by the previous provisions, of 1952 and 1977, that were totally or partially repealed.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0023"><NO.P>23.</NO.P><TXT>Bund Naturschutz in Bayern eV (<QUOT.START CODE="2018" ID="QS0030" REF.END="QE0030"/>Bund Naturschutz<QUOT.END REF.START="QS0030" CODE="2019" ID="QE0030"/>) is an environmental association which had taken part in the procedure for drafting the Inntal Süd Regulation. Dissatisfied with the content of the latter, Bund Naturschutz challenged it before the Bayerischer Verwaltungsgerichtshof (Administrative Court, Bavaria, Germany), which dismissed its action as inadmissible.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0024"><NO.P>24.</NO.P><TXT>The Bundesverwaltungsgericht (Federal Administrative Court, Germany) has to rule on the appeal in cassation (<QUOT.START CODE="2018" ID="QS0031" REF.END="QE0031"/><HT TYPE="ITALIC">Revision</HT><QUOT.END REF.START="QS0031" CODE="2019" ID="QE0031"/>) brought against the lower court’s decision.</TXT></NP.ECR><?PAGE NO="9"?><NP.ECR IDENTIFIER="NP0025"><NO.P>25.</NO.P><TXT>According to the referring court, the appeal in cassation is inadmissible under national law. With regard to the application for a review of legality, since the appellant cannot claim that the law has been infringed, it lacks standing. That application is inadmissible, since the Inntal Süd Regulation is not a decision and it is not subject under national law to the obligation to carry out an SEA or a preliminary examination.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0026"><NO.P>26.</NO.P><TXT>Nonetheless, it goes on to say, the answer to the questions referred for a preliminary ruling might lead to a judgment upholding the claims raised by Bund Naturschutz.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0027"><NO.P>27.</NO.P><TXT>The first two questions are intended to clarify whether, in accordance with Article 3(2)(a) of the SEA Directive, there was an obligation to subject the Inntal Süd Regulation to an SEA. If so, the appeal would not only be admissible but would also succeed on the merits: the court would surely have to declare the Inntal Süd Regulation invalid, owing to the failure to complete a necessary stage in the procedure for its adoption.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0028"><NO.P>28.</NO.P><TXT>The third question, relating to Article 3(4) of the SEA Directive, is also relevant to the outcome of the dispute. If the Inntal Süd Regulation sets a framework for future development consent of projects, within the meaning of that provision, the Rural District of Rosenheim would be required under national law to subject it to a preliminary assessment and, therefore, to a case-by-case examination within the meaning of Article 3(5) of the SEA Directive. In that event, the appeal would be admissible and well founded, and the Inntal Süd Regulation would have to be declared invalid.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0029"><NO.P>29.</NO.P><TXT>It is in this context that the Bundesverwaltungsgericht (Federal Administrative Court) has referred the following questions for a preliminary ruling:</TXT><QUOT.S LEVEL="1"><LIST TYPE="OTHER"><ITEM><NP><NO.P><QUOT.START CODE="2018" ID="QS0032" REF.END="QE0032"/>(1)</NO.P><TXT>Is Article 3(2)(a) of [the SEA] Directive … to be interpreted as meaning that a framework for future development consent of projects listed in Annexes I and II to [Directive 2011/92] (EIA Directive) is set where a regulation on nature conservation and landscape management provides for general prohibitions (with possible exemptions) and compulsory permits which do not specifically relate to projects listed in the annexes to the EIA Directive?</TXT></NP></ITEM><ITEM><NP><NO.P>(2)</NO.P><TXT>Is Article 3(2)(a) of [the SEA] Directive … to be interpreted as meaning that plans and programmes were prepared for agriculture, forestry, land use, etc. if their objective was to establish a reference framework for one or more of those areas? Or does it suffice if, for the purpose of nature conservation and landscape management, general prohibitions and permit requirements are regulated which have to be assessed in the permit procedure for a variety of projects and uses and which may indirectly impact (<QUOT.START CODE="201C" ID="QS0033" REF.END="QE0033"/>by default<QUOT.END REF.START="QS0033" CODE="201D" ID="QE0033"/>) one or more of those areas?</TXT></NP></ITEM><ITEM><NP><NO.P>(3)</NO.P><TXT>Is Article 3(4) of [the SEA] Directive … to be interpreted as meaning that a framework for future development consent of projects is set if a regulation adopted for the purpose of nature conservation and landscape management lays down prohibitions and permit requirements for a variety of projects and measures in the protected area which are described in abstract terms, where there are no actual foreseeable or envisaged projects when it is adopted and therefore it does not specifically relate to actual projects?<QUOT.END REF.START="QS0032" CODE="2019" ID="QE0032"/></TXT></NP></ITEM></LIST></QUOT.S></NP.ECR><?PAGE NO="10"?><NP.ECR IDENTIFIER="NP0030"><NO.P>30.</NO.P><TXT>Written observations have been lodged by Bund Naturschutz, the Rural District of Rosenheim, the Landesanwaltschaft Bayern (Public Prosecutor’s Office for the <HT TYPE="ITALIC">Land</HT> of Bavaria, Germany), the Czech and German Governments, Ireland and the European Commission. With the exception of the Czech Government, all the aforementioned parties attended the hearing held on <DATE ISO="20210607">7 June 2021</DATE>.</TXT></NP.ECR></GR.SEQ><GR.SEQ LEVEL="1"><TITLE><TI><NP><NO.P><HT TYPE="BOLD">III.</HT></NO.P><TXT><HT TYPE="BOLD">Assessment</HT></TXT></NP></TI></TITLE><GR.SEQ LEVEL="2"><TITLE><TI><NP><NO.P><HT TYPE="BOLD"><HT TYPE="ITALIC">A.</HT></HT></NO.P><TXT><HT TYPE="BOLD"><HT TYPE="ITALIC">First and second questions referred</HT></HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0031"><NO.P>31.</NO.P><TXT>The referring court wishes to ascertain whether Article 3(2)(a) of the SEA Directive is to be interpreted as meaning that legislation such as the contested regulation constitutes a plan or programme subject the obligation to carry out an SEA.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0032"><NO.P>32.</NO.P><TXT>In the judgment in <HT TYPE="ITALIC">Wind turbines at Aalter and Nevele</HT>, the Court made, inter alia, the following statements:</TXT><QUOT.S LEVEL="1"><LIST TYPE="OTHER"><ITEM><NP><NO.P><QUOT.START CODE="2018" ID="QS0034" REF.END="QE0034"/>–</NO.P><TXT>The purpose of that directive is, as is set out in Article 1, to provide for a high level of protection for the environment and to contribute to the integration of environmental considerations into the preparation and adoption of plans and programmes with a view to promoting sustainable development.’</TXT></NP></ITEM><ITEM><NP><NO.P>‘–</NO.P><TXT>To that end, as Article 1 states, the fundamental objective of [the SEA] Directive … is to subject plans and programmes that are likely to have significant environmental effects to an environmental assessment during their preparation and before their adoption.’</TXT></NP></ITEM><ITEM><NP><NO.P>‘–</NO.P><TXT>Moreover, a broad interpretation of the concept of <QUOT.START CODE="201C" ID="QS0035" REF.END="QE0035"/>plans and programmes<QUOT.END REF.START="QS0035" CODE="201D" ID="QE0035"/> is consistent with the European Union’s international undertakings, such as those resulting, inter alia, from Article 2(7) of the Espoo Convention.<QUOT.END REF.START="QS0034" CODE="2019" ID="QE0034"/><NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0013"><P>Paragraphs 45, 46 and 49, citing the judgments of <REF.DOC.ECR><DATE ISO="20110922">22 September 2011</DATE>, <NAME.CASE><HT TYPE="ITALIC">Valčiukienė and Others</HT></NAME.CASE> (<NO.CASE>C‑295/10</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2011:608">EU:C:2011:608</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0037">37</REF.NP.ECR></REF.DOC.ECR>), and of <REF.DOC.ECR><DATE ISO="20180607">7 June 2018</DATE>, <NAME.CASE><HT TYPE="ITALIC">Thybaut and Others</HT></NAME.CASE> (<NO.CASE>C‑160/17</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2018:401">EU:C:2018:401</NO.ECLI></REF.DOC.ECR>; ‘the judgment in <HT TYPE="ITALIC">Thybaut and Others</HT>’; paragraph 61).</P></NOTE></TXT></NP></ITEM></LIST></QUOT.S></NP.ECR><NP.ECR IDENTIFIER="NP0033"><NO.P>33.</NO.P><TXT>The rules governing the scope of the SEA Directive are mainly contained in two related articles:</TXT><P><LIST TYPE="NDASH"><ITEM><P>Article 2(a) defines the cumulative conditions that must be met by plans and programmes in order for the Directive to be applicable to them: (a) they must be ‘subject to preparation and/or adoption by an authority at national, regional or local level or … [be] prepared by an authority for adoption, through a legislative procedure by Parliament or Government’; and (b) they must be required by legislative, regulatory or administrative provisions.</P></ITEM><ITEM><P>Article 3(2)(a) sets out the conditions for identifying which of those plans and programmes are likely to have significant environmental effects and must therefore be made subject to an SEA: (a) they must be prepared for certain (sensitive) sectors and economic activities; and (b) they must ‘set’ the framework for future development consent of projects.</P></ITEM></LIST></P></NP.ECR><?PAGE NO="11"?><NP.ECR IDENTIFIER="NP0034"><NO.P>34.</NO.P><TXT>Article 3(4) of the SEA Directive extends the obligation to conduct an SEA to plans and programmes relating to activities which are not sensitive but have a high environmental impact. It is these plans and programmes that form the subject of the third question referred for a preliminary ruling.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0035"><NO.P>35.</NO.P><TXT>Taken together, those provisions give rise to four conditions which I shall analyse in order to determine whether local legislation such as the Inntal Süd Regulation is a plan or programme covered by Article 3(2)(a) of the SEA Directive.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0036"><NO.P>36.</NO.P><TXT>The premiss from which the referring court starts is that, in the light of the case-law of the Court of Justice, that regulation <QUOT.START CODE="2018" ID="QS0036" REF.END="QE0036"/>constitutes a plan or programme within the meaning of Article 2(a) of [the SEA] Directive<QUOT.END REF.START="QS0036" CODE="2019" ID="QE0036"/>.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0014"><P>Order for reference, paragraph 19.</P></NOTE> This is an assertion with which, as I shall explain, I agree.</TXT></NP.ECR><GR.SEQ LEVEL="3"><TITLE><TI><NP><NO.P><HT TYPE="ITALIC">1.</HT></NO.P><TXT><HT TYPE="ITALIC">Preparation or adoption of the plan or programme by a Member State authority</HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0037"><NO.P>37.</NO.P><TXT>The first condition, which does not usually present interpretative problems, is that the legislation must have been adopted or prepared by a Member State authority at national, regional or local level.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0038"><NO.P>38.</NO.P><TXT>In this case, it is common ground that the Inntal Süd Regulation was adopted by a German local authority, that is to say the Rural District of Rosenheim.</TXT></NP.ECR></GR.SEQ><GR.SEQ LEVEL="3"><TITLE><TI><NP><NO.P><HT TYPE="ITALIC">2.</HT></NO.P><TXT><HT TYPE="ITALIC">Plan or programme prescribed by legislative, regulatory or administrative provisions</HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0039"><NO.P>39.</NO.P><TXT>In accordance with Article 2(a), second indent, of the SEA Directive, the plans or programmes adopted by the authorities of a Member State which fall within its scope are those that are <QUOT.START CODE="2018" ID="QS0037" REF.END="QE0037"/>required by legislative, regulatory or administrative provisions<QUOT.END REF.START="QS0037" CODE="2019" ID="QE0037"/>.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0040"><NO.P>40.</NO.P><TXT>Since the judgment in <HT TYPE="ITALIC">Inter-Environnement Bruxelles and Others</HT>, the plans and programmes that are to be regarded as <QUOT.START CODE="2018" ID="QS0038" REF.END="QE0038"/>required<QUOT.END REF.START="QS0038" CODE="2019" ID="QE0038"/> within the meaning, and for the application, of that directive, are those whose adoption is regulated by national legislative or regulatory provisions which determine the competent authorities for adopting them and the procedure for preparing them.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0015"><P>Judgment of <REF.DOC.ECR><DATE ISO="20120322">22 March 2012</DATE>, <NAME.CASE><HT TYPE="ITALIC">Inter-Environnement Bruxelles and Others</HT></NAME.CASE> (<NO.CASE>C‑567/10</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2012:159">EU:C:2012:159</NO.ECLI></REF.DOC.ECR>; <QUOT.START CODE="2018" ID="QS0039" REF.END="QE0039"/>judgment in <HT TYPE="ITALIC">Inter-Environnement Bruxelles and Others</HT><QUOT.END REF.START="QS0039" CODE="2019" ID="QE0039"/>; paragraph 3); judgment in <HT TYPE="ITALIC">Thybaut and Others</HT>, paragraph 43; and judgment of <REF.DOC.ECR><DATE ISO="20190612">12 June 2019</DATE>, <NAME.CASE><HT TYPE="ITALIC">CFE</HT></NAME.CASE> (<NO.CASE>C‑43/18</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2019:483">EU:C:2019:483</NO.ECLI></REF.DOC.ECR>; <QUOT.START CODE="2018" ID="QS0040" REF.END="QE0040"/>judgment in <HT TYPE="ITALIC">CFE</HT><QUOT.END REF.START="QS0040" CODE="2019" ID="QE0040"/>; paragraph 54).</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0041"><NO.P>41.</NO.P><TXT>By that interpretation, the Court adopted a <HT TYPE="ITALIC">broad</HT> interpretation of Directive 2001/42, taking the view that the latter applies to plans and programmes regulated by national legislative or regulatory provisions whether their adoption is <HT TYPE="ITALIC">compulsory</HT> or <HT TYPE="ITALIC">optional</HT>.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0016"><P>In <HT TYPE="ITALIC">Inter-Environnement Bruxelles and Others</HT>, Advocate General Kokott offered a more restrictive interpretation to the effect that an SEA would be required only for plans and programmes whose adoption is compulsory in that it is prescribed by a provision of domestic law (Opinion of Advocate General Kokott of <DATE ISO="20111117">17 November 2011</DATE> in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">Inter-Environnement Bruxelles and Others</HT></NAME.CASE>, <NO.CASE>C‑567/10</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2011:755">EU:C:2011:755</NO.ECLI>, points <REF.NP.ECR REF="NP0018">18</REF.NP.ECR> and <REF.NP.ECR REF="NP0019">19</REF.NP.ECR></REF.DOC.ECR>). In points 41 and 42 of her Opinion of <DATE ISO="20180125">25 January 2018</DATE> in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">Inter-Environnement Bruxelles and Others</HT></NAME.CASE> (<NO.CASE>C‑671/16</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2018:39">EU:C:2018:39</NO.ECLI>, points <REF.NP.ECR REF="NP0041">41</REF.NP.ECR> and <REF.NP.ECR REF="NP0042">42</REF.NP.ECR></REF.DOC.ECR>), Advocate General Kokott reiterated her position, arguing that the Court has extended the scope of the SEA Directive beyond that which the legislature intended and which the Member States could have foreseen.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0042"><NO.P>42.</NO.P><TXT>That case-law has been <QUOT.START CODE="2018" ID="QS0041" REF.END="QE0041"/>questioned<QUOT.END REF.START="QS0041" CODE="2019" ID="QE0041"/> and, in <HT TYPE="ITALIC">Wind turbines at Aalter and Nivele</HT>, it was expressly proposed that the Court should amend it.</TXT></NP.ECR><?PAGE NO="12"?><NP.ECR IDENTIFIER="NP0043"><NO.P>43.</NO.P><TXT>In that case, however, the Court refused to amend its previous case-law. It reaffirmed that the <QUOT.START CODE="2018" ID="QS0042" REF.END="QE0042"/>objectives [of the Directive] would be likely to be compromised if Article 2(a) [thereof] were interpreted as meaning that only those plans or programmes whose adoption is compulsory are covered by the obligation to carry out an environmental assessment laid down by that directive. First, … the adoption of those plans and programmes is often not imposed as a general requirement. Second, such an interpretation would allow a Member State to circumvent easily that requirement for an environmental assessment by deliberately refraining from providing that competent authorities are required to adopt such plans and programmes<QUOT.END REF.START="QS0042" CODE="2019" ID="QE0042"/>.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0017"><P>Judgment in <HT TYPE="ITALIC">Wind turbines at</HT> <HT TYPE="ITALIC">Aalter and Nevele</HT>, paragraph 48.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0044"><NO.P>44.</NO.P><TXT>The second indent of Article 2(a) of the SEA Directive must therefore be interpreted <QUOT.START CODE="2018" ID="QS0043" REF.END="QE0043"/>as meaning that plans and programmes whose adoption is regulated by national legislative or regulatory provisions, which determine the authorities competent to adopt them and the procedure for preparing them, must be regarded as <QUOT.START CODE="201C" ID="QS0044" REF.END="QE0044"/>required<QUOT.END REF.START="QS0044" CODE="201D" ID="QE0044"/> within the meaning, and for the application, of that directive<QUOT.END REF.START="QS0043" CODE="2019" ID="QE0043"/>.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0018"><P>Judgment in <HT TYPE="ITALIC">Wind turbines at Aalter and Nevele</HT>, paragraph 52.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0045"><NO.P>45.</NO.P><TXT>The Landesanwaltschaft Bayern makes a further call for the Court to amend its case-law,<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0019"><P>Paragraph 10 of the written observations of the Landesanwaltschaft Bayern.</P></NOTE> but does not, in my opinion, put forward any strong new arguments in support of its proposition. The referring court does not raise any questions in that regard.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0046"><NO.P>46.</NO.P><TXT>In my view, that issue was definitively disposed of by the Grand Chamber of the Court of Justice in the judgment in <HT TYPE="ITALIC">Wind turbines at Aalter and Nevele</HT> and there is no reason to review that case-law.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0047"><NO.P>47.</NO.P><TXT>According to the referring court,<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0020"><P>Paragraph 19 of the order for reference, which cites as the legal basis for the Inntal Süd Regulation Paragraphs 12(1), first sentence, 20(2) and 26 of the BNatSchgG (which govern the power to adopt, amend or repeal regulations on landscape conservation areas) in conjunction with Paragraphs 51(1), point 3, and 52 of the BayNatSchG (which define the competent administrative authority – in this case, the Rural District of Rosenheim – and the procedure respectively).</P></NOTE> the Inntal Süd Regulation was adopted under the enabling provisions of the BNatSchgG. It is therefore a regulation <HT TYPE="ITALIC">prescribed</HT> by legislative provisions, even if its preparation was not <HT TYPE="ITALIC">compulsory</HT>. It therefore satisfies the second condition for being a plan or programme subject to the obligation to carry out an SEA.</TXT></NP.ECR></GR.SEQ><GR.SEQ LEVEL="3"><TITLE><TI><NP><NO.P><HT TYPE="ITALIC">3.</HT></NO.P><TXT><HT TYPE="ITALIC">Plan or programme prepared for a (sensitive) economic sector covered by the SEA Directive</HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0048"><NO.P>48.</NO.P><TXT>Article 3(2)(a) of the SEA Directive states that, subject to paragraph 3 of that provision, <QUOT.START CODE="2018" ID="QS0045" REF.END="QE0045"/>an environmental assessment shall be carried out for all plans and programmes … which are prepared for agriculture, forestry, fisheries, energy, industry, transport, waste management, water management, telecommunications, tourism, town and country planning or land use<QUOT.END REF.START="QS0045" CODE="2019" ID="QE0045"/>.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0049"><NO.P>49.</NO.P><TXT>In the words of the Court, <QUOT.START CODE="2018" ID="QS0046" REF.END="QE0046"/>Article 3 of Directive 2001/42 makes the obligation to subject a specific plan or programme to an environmental assessment conditional upon the plan or programme covered by that provision being likely to have significant environmental effects … More specifically, Article 3(2)(a) of that directive provides that a systematic environmental assessment is to be carried out for all plans and programmes that are prepared for certain sectors and set the framework for future development consent of projects listed in Annexes I and II to Directive 2011/92 …<QUOT.END REF.START="QS0046" CODE="2019" ID="QE0046"/>.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0021"><P>Judgment in <HT TYPE="ITALIC">Wind turbines at Aalter and Nevele</HT>, paragraph 65.</P></NOTE></TXT></NP.ECR><?PAGE NO="13"?><NP.ECR IDENTIFIER="NP0050"><NO.P>50.</NO.P><TXT>These are environmentally <HT TYPE="ITALIC">sensitive</HT> sectors as provided for in Annexes I and II to the EIA Directive and Directive 92/43/EEC,<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0022"><P>Council Directive of <DATE ISO="19920521">21 May 1992</DATE> on the conservation of natural habitats and of wild fauna and flora (<REF.DOC.OJ COLL="L" NO.OJ="206" PAGE.FIRST="7" DATE.PUB="1992">OJ 1992 L 206, p. 7</REF.DOC.OJ>).</P></NOTE> which are systematically subject to an SEA.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0023"><P>Nonetheless, if plans and programmes in these sensitive sectors determine the use of small areas at local level and the introduction of minor modifications to those plans and programmes, they are to be assessed only where the Member States determine that they are likely to have significant environmental effects (Article 3(3) of the SEA Directive). See recital 10 of that directive.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0051"><NO.P>51.</NO.P><TXT>According to the referring court, the Inntal Süd Regulation was introduced for a <HT TYPE="ITALIC">sector</HT> (nature and landscape conservation) which does not satisfy the requirements of Article 5 of the SEA Directive and, therefore, is not one of those referred to in Article 3(2)(a) of that directive.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0024"><P>Order for reference, paragraph 27. The referring court infers from recital 10, Article 3(2)(a) and Article 5 of the SEA Directive that a prior SEA is required for plans and programmes explicitly created for and focused on one of the sectors referred to in Article 3(2)(a), which do not include that at issue in this dispute.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0052"><NO.P>52.</NO.P><TXT>What is more, it goes on to say, the Court of Justice has ruled on only very few occasions on the requirement of <QUOT.START CODE="2018" ID="QS0047" REF.END="QE0047"/>preparation<QUOT.END REF.START="QS0047" CODE="2019" ID="QE0047"/> in connection with a specific sector, and for that reason it asks the Court to clarify:</TXT><P><LIST TYPE="NDASH"><ITEM><P>whether <QUOT.START CODE="2018" ID="QS0048" REF.END="QE0048"/>preparation<QUOT.END REF.START="QS0048" CODE="2019" ID="QE0048"/> presupposes that the plan or programme is specifically and deliberately targeted at one of the sectors specified in Article 3(2)(a) of the SEA Directive; or</P></ITEM><ITEM><P>whether it is sufficient for plans and programmes to affect such sectors (in this case, agriculture, forestry and land use) in practice, even if they were prepared for another sector not referred to in that provision (in this case, nature and landscape conservation).<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0025"><P>Order for reference, paragraph 29.</P></NOTE></P></ITEM></LIST></P></NP.ECR><NP.ECR IDENTIFIER="NP0053"><NO.P>53.</NO.P><TXT>It is true that the Court has not been particularly demanding when analysing that condition with a view to determining whether a plan or programme requires an SEA prior to its adoption. It is sufficient for the plan or programme to concern, affect, relate to, or have an impact on, one of those sectors in order to be deemed to have been <HT TYPE="ITALIC">prepared</HT> for it, if that sector is one of those referred to in Article 3(2)(a) of the SEA Directive.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0026"><P>See judgment in <HT TYPE="ITALIC">Wind turbines at Aalter and Nevele</HT>, paragraph 66; judgments of <REF.DOC.ECR><DATE ISO="20190508">8 May 2019</DATE>, <NAME.CASE><QUOT.START CODE="2018" ID="QS0049" REF.END="QE0049"/><HT TYPE="ITALIC">Verdi Ambiente e Società (VAS) – Aps Onlus<QUOT.END REF.START="QS0049" CODE="2019" ID="QE0049"/> and Others</HT></NAME.CASE> (<NO.CASE>C‑305/18</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2019:384">EU:C:2019:384</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0048">48</REF.NP.ECR></REF.DOC.ECR>); of <REF.DOC.ECR><DATE ISO="20180607">7 June 2018</DATE>, <NAME.CASE><HT TYPE="ITALIC">Inter-Environnement Bruxelles and Others</HT></NAME.CASE> (<NO.CASE>C‑671/16</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2018:403">EU:C:2018:403</NO.ECLI></REF.DOC.ECR>; <QUOT.START CODE="2018" ID="QS0050" REF.END="QE0050"/>judgment in <HT TYPE="ITALIC">Inter-Environnement Bruxelles and Others</HT><QUOT.END REF.START="QS0050" CODE="2019" ID="QE0050"/>; paragraphs 42 to 45); judgment in <HT TYPE="ITALIC">Thybaut and Others</HT>, paragraphs 47 to 49; and judgment of <REF.DOC.ECR><DATE ISO="20161027">27 October 2016</DATE>, <NAME.CASE><HT TYPE="ITALIC">D’Oultremont and Others</HT></NAME.CASE> (<NO.CASE>C‑290/15</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2016:816">EU:C:2016:816</NO.ECLI></REF.DOC.ECR>; <QUOT.START CODE="2018" ID="QS0051" REF.END="QE0051"/>judgment in <HT TYPE="ITALIC">D’Oultremont and Others</HT><QUOT.END REF.START="QS0051" CODE="2019" ID="QE0051"/>; paragraph 44).</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0054"><NO.P>54.</NO.P><TXT>The Court has also adopted a broad interpretation of the sensitive sectors listed in that article. In particular:</TXT><P><LIST TYPE="NDASH"><ITEM><P>it has stated that the reference to <QUOT.START CODE="2018" ID="QS0052" REF.END="QE0052"/>town and country planning<QUOT.END REF.START="QS0052" CODE="2019" ID="QE0052"/> and <QUOT.START CODE="2018" ID="QS0053" REF.END="QE0053"/>land use<QUOT.END REF.START="QS0053" CODE="2019" ID="QE0053"/> shows that <QUOT.START CODE="2018" ID="QS0054" REF.END="QE0054"/>the sector mentioned is not limited to land use <HT TYPE="ITALIC">sensu stricto</HT>, namely the dividing of land into zones and the defining of activities permitted within those zones, but necessarily covers a broader field<QUOT.END REF.START="QS0054" CODE="2019" ID="QE0054"/>;<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0027"><P>Judgment in <HT TYPE="ITALIC">Inter-Environnement Bruxelles and Others</HT>, paragraph 43.</P></NOTE></P></ITEM><ITEM><P>it has adopted an interpretation to the effect that an order establishing an urban land consolidation area which allows for derogation from the town planning regulations for plans concerning buildings and town and country planning comes within the <QUOT.START CODE="2018" ID="QS0055" REF.END="QE0055"/>town and country planning or land use<QUOT.END REF.START="QS0055" CODE="2019" ID="QE0055"/> sector within the meaning of Article 3(2)(a) of the SEA Directive;<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0028"><P>Judgment in <HT TYPE="ITALIC">Thybaut and Others</HT>, paragraphs 48 and 49.</P></NOTE></P></ITEM><?PAGE NO="14"?><ITEM><P>it has held that an SEA was required for a presidential decree, establishing protection measures in respect of an area comprising a mountain and certain metropolitan parks,<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0029"><P>This was Presidential Decree No 187/2011 of <DATE ISO="20110614">14 June 2011</DATE> establishing protection measures in respect of the Mount Hymettus (Hymettos) area and the Goudi and Ilissia metropolitan parks in Greece, in order to bring the protection of that site into line with the spatial planning master plan for the greater Athens area. According to Article 1 of that Decree, <QUOT.START CODE="2018" ID="QS0056" REF.END="QE0056"/>the objective of the present decree is the effective protection of the Mount Hymettus area and its peripheral areas through the management and ecological conservation of habitats, flora and fauna, enhancement of its important ecological activities for the Attica basin, <HT TYPE="ITALIC">protection of the landscape</HT> and building control<QUOT.END REF.START="QS0056" CODE="2019" ID="QE0056"/> (my emphasis).</P></NOTE> Article 1 of which stated inter alia that its objective was <QUOT.START CODE="2018" ID="QS0057" REF.END="QE0057"/>protection of the landscape<QUOT.END REF.START="QS0057" CODE="2019" ID="QE0057"/>.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0030"><P>Judgment of <REF.DOC.ECR><DATE ISO="20150910">10 September 2015</DATE>, <NAME.CASE><HT TYPE="ITALIC">Dimos Kropias Attikis</HT></NAME.CASE> (<NO.CASE>C‑473/14</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2015:582">EU:C:2015:582</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0020">20</REF.NP.ECR></REF.DOC.ECR>).</P></NOTE></P></ITEM></LIST></P></NP.ECR><NP.ECR IDENTIFIER="NP0055"><NO.P>55.</NO.P><TXT>In my opinion, there is no reason why national measures to protect nature and the landscape should not <HT TYPE="ITALIC">be prepared for</HT> the sensitive sectors identified in Article 3(2)(a) of the SEA Directive, even if they are not directly and specifically, but only indirectly, targeted at their conservation. Provided that the other requirements are met, therefore, such plans and programmes will generally require an SEA prior to their adoption.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0056"><NO.P>56.</NO.P><TXT>In its written observations, the Commission argues that Article 3(2)(a) of the SEA Directive contains an exhaustive list of specific sectors which cannot be broadened or extended to other sectors not expressly provided for because this was the legislature’s wish.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0031"><P>In the Proposal for a Council Directive on the assessment of the effects of certain plans and programmes on the environment (COM/96/0511 final; <REF.DOC.OJ COLL="C" NO.OJ="129" PAGE.FIRST="14" DATE.PUB="1997">OJ 1997 C 129, p. 14</REF.DOC.OJ>), the Commission advocated an open and non-exhaustive list of sensitive sectors plans and programmes in respect of which were subject to an obligation to carry out a prior SEA. Nonetheless, the Common Position adopted by the Council on <DATE ISO="20000330">30 March 2000</DATE> (<REF.DOC.OJ COLL="C" NO.OJ="137" PAGE.FIRST="11" DATE.PUB="2000">OJ 2000 C 137, p. 11</REF.DOC.OJ>) with a view to the adoption of a Directive of the European Parliament and of the Council on the assessment of the risks of certain plans and programmes on the environment decided to introduce an exhaustive list of sensitive sectors.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0057"><NO.P>57.</NO.P><TXT>The Court’s judgments do not add new sensitive sectors to that exhaustive list. They simply adopt a non-restrictive interpretation of the sectors included on the list and refrain from requiring that the preparation of the plan or programme in question be directly and expressly targeted at one or more of those sectors, it being sufficient for the plan or programme to concern, relate to or have an impact on them.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0058"><NO.P>58.</NO.P><TXT>I concur with the Court’s interpretation and I see no reason to propose a change to the direction of that line of case-law.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0059"><NO.P>59.</NO.P><TXT>The wording of Article 3(2)(a) of the SEA Directive endorses that reading of it. Several language versions use terminology which supports the application of that provision to any plan or programme prepared [in Spanish] <HT TYPE="ITALIC">in respect of</HT> sensitive sectors.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0032"><P>Plans and programmes which ‘se elaboren con respecto a’ (Spanish-language version); which are <QUOT.START CODE="2018" ID="QS0058" REF.END="QE0058"/>élaborés pour<QUOT.END REF.START="QS0058" CODE="2019" ID="QE0058"/> (French-language version); <QUOT.START CODE="2018" ID="QS0059" REF.END="QE0059"/>which are prepared for<QUOT.END REF.START="QS0059" CODE="2019" ID="QE0059"/> (English-language version); which ‘sono elaborati per’ (Italian-language version); which <QUOT.START CODE="2018" ID="QS0060" REF.END="QE0060"/>tenham sido preparados para<QUOT.END REF.START="QS0060" CODE="2019" ID="QE0060"/> (Portuguese-language version). The German-language version appears to be more restrictive, inasmuch as it speaks of plans and programmes which <QUOT.START CODE="2018" ID="QS0061" REF.END="QE0061"/>in den Bereichen … ausgearbeitet werden<QUOT.END REF.START="QS0061" CODE="2019" ID="QE0061"/>.</P></NOTE> That phrase allows the text to be interpreted as meaning that the plan or programme does not have to be aimed expressly and exclusively at one of those sectors, but need only have a significant effect on it.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0060"><NO.P>60.</NO.P><TXT>Contrary to the view expressed by the Czech and German Governments and Ireland, such an interpretation does not entail an unjustified extension of the scope of Article 3(2)(a) of the SEA Directive, to the detriment of paragraph 4 thereof. To my mind, that interpretation ensures that Member States do not circumvent the obligation to carry out an SEA for plans and programmes affecting sensitive sectors by disguising them through the use of different terminology, for example by stating that they are intended to protect nature and the landscape.</TXT></NP.ECR><?PAGE NO="15"?><NP.ECR IDENTIFIER="NP0061"><NO.P>61.</NO.P><TXT>In actual fact, the objections raised in that regard arise from a measure of terminological misunderstanding, inasmuch as nature and landscape conservation is not, strictly speaking, a sector that can be regarded as comparable to the sectors specifically listed in Article 3(2)(a) of the SEA Directive. If it could, the <HT TYPE="ITALIC">inclusio unius, exclusio alterius</HT> rule of interpretation would apply and the absence of that <HT TYPE="ITALIC">purported sector</HT> from the list would duly amount to its exclusion from it.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0062"><NO.P>62.</NO.P><TXT>The fact remains, however, that the sectors listed in the provision in question cover very specific fields of activity (agriculture, fisheries, transport, energy, telecommunications, and so forth), whereas nature and landscape conservation is a cross-cutting objective which may in and of itself inform and justify measures that will, whether directly or otherwise, affect each of those sensitive sectors.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0063"><NO.P>63.</NO.P><TXT>I do not see why the requirements of Article 5(1) of the SEA Directive can be <QUOT.START CODE="2018" ID="QS0062" REF.END="QE0062"/>adapted<QUOT.END REF.START="QS0062" CODE="2019" ID="QE0062"/><NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0033"><P>Order for reference, paragraph 27.</P></NOTE> to plans and programmes in the sectors listed but cannot, on the other hand, be adapted to a regulation which directly targets nature and landscape conservation and indirectly impacts on those sectors. There is, in my opinion, nothing to stop a report being drawn up which identifies, describes and assesses the significant effects which implementing a plan or programme the objective of which is to protect nature and the landscape is likely to have on the environment.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0034"><P>There would be nothing to stop the – positive and negative – environmental effects of a provision such as the Inntal Süd Regulation (for example, the effects of reducing its scope by comparison with that of its predecessors so as to permit house building projects on previously protected land) from being identified, described and identified, notwithstanding that, because it does not include a reference framework, that provision does not necessarily have to be subjected to an SEA, as I shall examine below.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0064"><NO.P>64.</NO.P><TXT>The Inntal Süd Regulation, while protecting nature and the landscape in one of the areas designated by the Bavarian legislation (which make up some 30% of the territory of that <HT TYPE="ITALIC">Land</HT>), simultaneously has an impact on some of the aforementioned <HT TYPE="ITALIC">sensitive sectors</HT>.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0065"><NO.P>65.</NO.P><TXT>Bund Naturschutz describes its impact on <QUOT.START CODE="2018" ID="QS0063" REF.END="QE0063"/>land use<QUOT.END REF.START="QS0063" CODE="2019" ID="QE0063"/>, a sector expressly caught by Article 3(2)(a) of the SEA Directive. The Inntal Süd Regulation contains rules on, inter alia, the carrying out of construction work and the pursuit of farming and forestry activities, and its connection with <QUOT.START CODE="2018" ID="QS0064" REF.END="QE0064"/>land use<QUOT.END REF.START="QS0064" CODE="2019" ID="QE0064"/> (including <QUOT.START CODE="2018" ID="QS0065" REF.END="QE0065"/>town and country planning<QUOT.END REF.START="QS0065" CODE="2019" ID="QE0065"/>) would appear to be unquestionable.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0035"><P>The referring court recognises (paragraph 22 of the order for reference) that the <QUOT.START CODE="2018" ID="QS0066" REF.END="QE0066"/>Regulation lays down … a number of general obligations and obligations to obtain consent <HT TYPE="ITALIC">for an extensive range of projects</HT> and uses<QUOT.END REF.START="QS0066" CODE="2019" ID="QE0066"/>. My emphasis.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0066"><NO.P>66.</NO.P><TXT>The Inntal Süd Regulation lays down a requirement to obtain prior administrative consent for a whole host of activities in the protected area.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0036"><P>In point 43 of her Opinion in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">CFE</HT> and <HT TYPE="ITALIC">Terre wallonne</HT></NAME.CASE> (<NO.CASE>C‑43/18 and C‑321/18</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2019:56">EU:C:2019:56</NO.ECLI></REF.DOC.ECR>), Advocate General Kokott confined herself to saying that <QUOT.START CODE="2018" ID="QS0067" REF.END="QE0067"/>the doubts expressed by various parties as to whether the designation of a special area of conservation or the establishment of conservation objectives for the Natura 2000 sites in a region can be attributed to one of these areas [provided for in Article 3([2])(a) of Directive 2001/4[2]] are perfectly understandable<QUOT.END REF.START="QS0067" CODE="2019" ID="QE0067"/>.</P></NOTE> Those consents <HT TYPE="ITALIC">defend</HT> the land against a certain type of use and, in my view, constitute measures concerning the use of that land and town and country planning. Both of those sectors, as I have said, are referred to in Article 3([2])(a) of the SEA Directive.</TXT></NP.ECR><?PAGE NO="16"?><NP.ECR IDENTIFIER="NP0067"><NO.P>67.</NO.P><TXT>In particular, Paragraph 5 of the Inntal Süd Regulation lays down a requirement to obtain consent for the construction of immoveable property,<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0037"><P>Paragraph 5(1), point 1.</P></NOTE> water management,<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0038"><P>Paragraph 5(1), points 4 and 5.</P></NOTE> the conservation of meadows<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0039"><P>Paragraph 5(1), point 6.</P></NOTE> and forestry exploitation,<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0040"><P>Paragraph 5(1), points 8, 9 and 10.</P></NOTE> among other activities.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0041"><P>According to Bund Naturschutz (p. 17 of the French-language version of its written observations), that same article could affect land use, and thereby impact on future construction work, inasmuch as it does not include a <QUOT.START CODE="2018" ID="QS0068" REF.END="QE0068"/>bar-to-opening clause<QUOT.END REF.START="QS0068" CODE="2019" ID="QE0068"/> as interpreted by national case-law. The answer to that claim, however, will depend on the interpretation of domestic law.</P></NOTE></TXT></NP.ECR></GR.SEQ><GR.SEQ LEVEL="3"><TITLE><TI><NP><NO.P><HT TYPE="ITALIC">4.</HT></NO.P><TXT><HT TYPE="ITALIC">Plan or programme which sets a reference framework for future development consent of projects covered by the EIA Directive</HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0068"><NO.P>68.</NO.P><TXT>A plan or programme prepared for certain sensitive sectors will be subject to a compulsory SEA, in accordance with Article 3(2)(a) of the SEA Directive, if it sets the framework for future development consent of projects listed in Annexes I and II to the EIA Directive.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0042"><P>Judgment of <REF.DOC.ECR><DATE ISO="20190508">8 May 2019</DATE>, <NAME.CASE><QUOT.START CODE="2018" ID="QS0069" REF.END="QE0069"/><HT TYPE="ITALIC">Verdi Ambiente e Società (VAS) – Aps Onlus<QUOT.END REF.START="QS0069" CODE="2019" ID="QE0069"/> and Others</HT></NAME.CASE> (<NO.CASE>C‑305/18</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2019:384">EU:C:2019:384</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0047">47</REF.NP.ECR></REF.DOC.ECR>), and judgment in <HT TYPE="ITALIC">Wind turbines at Aalter and Nevele</HT>, paragraph 65.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0069"><NO.P>69.</NO.P><TXT>That article thus makes the obligation to carry out an SEA subject to the following conditions:</TXT><P><LIST TYPE="NDASH"><ITEM><P>the plans and programmes must set the framework for future development consent for the implementation of projects; and</P></ITEM><ITEM><P>the projects must be listed in Annexes I and II to the EIA Directive.</P></ITEM></LIST></P></NP.ECR><GR.SEQ LEVEL="4"><TITLE><TI><NP><NO.P><HT TYPE="ITALIC">(a)</HT></NO.P><TXT><HT TYPE="ITALIC">Plan or programme providing for development consent for projects listed in Annexes I and II to the EIA Directive</HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0070"><NO.P>70.</NO.P><TXT>According to Article1(2) of the EIA Directive, the term <QUOT.START CODE="2018" ID="QS0070" REF.END="QE0070"/>project<QUOT.END REF.START="QS0070" CODE="2019" ID="QE0070"/> covers:</TXT><P><LIST TYPE="NDASH"><ITEM><P>the execution of construction works or of other installations or schemes;</P></ITEM><ITEM><P>other interventions in the natural surroundings and landscape including those involving the extraction of mineral resources.</P></ITEM></LIST></P></NP.ECR><NP.ECR IDENTIFIER="NP0071"><NO.P>71.</NO.P><TXT>The term <QUOT.START CODE="2018" ID="QS0071" REF.END="QE0071"/>project<QUOT.END REF.START="QS0071" CODE="2019" ID="QE0071"/> as defined (in particular under the first indent of Article 1(2)(a) of the EIA Directive), refers to works or interventions involving alterations to the physical aspect of the site.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0043"><P>Judgments of <REF.DOC.ECR><DATE ISO="20120419">19 April 2012</DATE>, <NAME.CASE><HT TYPE="ITALIC">Pro-Braine and Others</HT></NAME.CASE> (<NO.CASE>C‑121/11</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2012:225">EU:C:2012:225</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0031">31</REF.NP.ECR></REF.DOC.ECR>); of <REF.DOC.ECR><DATE ISO="20190729">29 July 2019</DATE>, <NAME.CASE><HT TYPE="ITALIC">Inter-Environnement Wallonie and Bond Beter Leefmilieu Vlaanderen</HT></NAME.CASE> (<NO.CASE>C‑411/17</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2019:622">EU:C:2019:622</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0062">62</REF.NP.ECR></REF.DOC.ECR>); and of <REF.DOC.ECR><DATE ISO="20200909">9 September 2020</DATE>, <NAME.CASE><HT TYPE="ITALIC">Friends of the Irish Environment</HT></NAME.CASE> (<NO.CASE>C‑254/19</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2020:680">EU:C:2020:680</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0032">32</REF.NP.ECR></REF.DOC.ECR>).</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0072"><NO.P>72.</NO.P><TXT>In accordance with Article 2(1) of the EIA Directive, projects to be made subject to assessment are those which are likely to <QUOT.START CODE="2018" ID="QS0072" REF.END="QE0072"/>have significant effects on the environment by virtue, inter alia, of their nature, size or location<QUOT.END REF.START="QS0072" CODE="2019" ID="QE0072"/>, as defined in Article 4 of that directive, which refers to the projects listed in Annexes I and II thereto.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0044"><P>Judgments of <REF.DOC.ECR><DATE ISO="20110317">17 March 2011</DATE>, <NAME.CASE><HT TYPE="ITALIC">Brussels Hoofdstedelijk Gewest and Others</HT></NAME.CASE> (<NO.CASE>C‑275/09</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2011:154">EU:C:2011:154</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0025">25</REF.NP.ECR></REF.DOC.ECR>), and of <REF.DOC.ECR><DATE ISO="20190729">29 July 2019</DATE>, <NAME.CASE><HT TYPE="ITALIC">Inter-Environnement Wallonie and Bond Beter Leefmilieu Vlaanderen</HT></NAME.CASE> (<NO.CASE>C‑411/17</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2019:622">EU:C:2019:622</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0074">74</REF.NP.ECR></REF.DOC.ECR>).</P></NOTE></TXT></NP.ECR><?PAGE NO="17"?><NP.ECR IDENTIFIER="NP0073"><NO.P>73.</NO.P><TXT>A reading of Article 2(1) in conjunction with Article 4(1) of the EIA Directive makes it clear that the projects listed in Annex I thereto entail by their nature a risk of significant effects on the environment and must necessarily be the subject of an EIA.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0045"><P>Judgments of <REF.DOC.ECR><DATE ISO="20111124">24 November 2011</DATE>, <NAME.CASE><HT TYPE="ITALIC">Commission</HT> v <HT TYPE="ITALIC">Spain</HT></NAME.CASE> (<NO.CASE>C‑404/09</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2011:768">EU:C:2011:768</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0074">74</REF.NP.ECR></REF.DOC.ECR>); of <REF.DOC.ECR><DATE ISO="20150211">11 February 2015</DATE>, <NAME.CASE><HT TYPE="ITALIC">Marktgemeinde Straßwalchen and Others</HT></NAME.CASE> (<NO.CASE>C‑531/13</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2015:79">EU:C:2015:79</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0020">20</REF.NP.ECR></REF.DOC.ECR>); and of <REF.DOC.ECR><DATE ISO="20190729">29 July 2019</DATE>, <NAME.CASE><HT TYPE="ITALIC">Inter-Environnement Wallonie and Bond Beter Leefmilieu Vlaanderen</HT></NAME.CASE> (<NO.CASE>C‑411/17</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2019:622">EU:C:2019:622</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0075">75</REF.NP.ECR></REF.DOC.ECR>).</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0074"><NO.P>74.</NO.P><TXT>As regards the projects listed in Annex II, Member States must determine whether they are to be made subject to an EIA on the basis of either a case-by-case examination or pre-established thresholds or criteria.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0075"><NO.P>75.</NO.P><TXT>The Inntal Süd Regulation includes provisions on activities that do not fall within the scope of the concept of <QUOT.START CODE="2018" ID="QS0073" REF.END="QE0073"/>project<QUOT.END REF.START="QS0073" CODE="2019" ID="QE0073"/> under the EIA Directive, as well as on others that do.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0076"><NO.P>76.</NO.P><TXT>For, as the Commission states,<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0046"><P>Paragraph 22 of its written observations.</P></NOTE> the Inntal Süd Regulation covers some activities which, even though subject to the requirement to obtain prior administrative consent, fall outside the concept of project.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0047"><P>These include: ‘set[ting] up vending vans or … erect[ing], secur[ing] and operat[ing] sales kiosks and vending machines’ (Paragraph 5(1), point 2(d); <QUOT.START CODE="2018" ID="QS0074" REF.END="QE0074"/>driv[ing] or park[ing] motor vehicles of any kind anywhere other than on roads, paths and spaces dedicated to public traffic or park[ing] them in such areas<QUOT.END REF.START="QS0074" CODE="2019" ID="QE0074"/> (Paragraph 5(1), point 3); <QUOT.START CODE="2018" ID="QS0075" REF.END="QE0075"/>camp[ing] or park[ing] caravans (including folding trailers) or motorised dwelling vehicles anywhere other than on authorised sites, or allow[ing] others to do so<QUOT.END REF.START="QS0075" CODE="2019" ID="QE0075"/> (Paragraph 5(1), point 12); <QUOT.START CODE="2018" ID="QS0076" REF.END="QE0076"/>allow[ing] aircraft within the meaning of the Luftverkehrgesetz (Law on Aviation) to take off or land anywhere other than at authorised aerodromes<QUOT.END REF.START="QS0076" CODE="2019" ID="QE0076"/> (Paragraph 5(1), point 13).</P></NOTE> None of those activities entails the execution of construction works or of other installations or schemes, or of physical interventions in the natural surroundings or landscape either. Consequently, they are not consistent with the concept of <QUOT.START CODE="2018" ID="QS0077" REF.END="QE0077"/>project<QUOT.END REF.START="QS0077" CODE="2019" ID="QE0077"/> under the EIA Directive and the legislation providing for them does not therefore require a prior SEA.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0077"><NO.P>77.</NO.P><TXT>At the same time, however, the Inntal Süd Regulation lays down a requirement to obtain consent to carry on other activities in the conservation area which do fall within the scope of the projects listed in Annexes I and II to the EIA Directive. This is true of several of those described in Paragraphs 4 and 5 thereof.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0048"><P>Paragraph 4 prohibits the carrying on <QUOT.START CODE="2018" ID="QS0078" REF.END="QE0078"/>in the landscape conservation area of any activity which alters the character of that area or which runs counter to the conservation objective pursued<QUOT.END REF.START="QS0078" CODE="2019" ID="QE0078"/>. Paragraph 5 extends that prohibition to <QUOT.START CODE="2018" ID="QS0079" REF.END="QE0079"/>erect[ing], chang[ing] or changing the use of any kind of construction …<QUOT.END REF.START="QS0079" CODE="2019" ID="QE0079"/> (subparagraph 1, point 1); <QUOT.START CODE="2018" ID="QS0080" REF.END="QE0080"/>lay[ing] overhead or underground wiring, cabling or piping and … erect[ing] masts<QUOT.END REF.START="QS0080" CODE="2019" ID="QE0080"/> (subparagraph 1, point 2(b)); <QUOT.START CODE="2018" ID="QS0081" REF.END="QE0081"/>construct[ing] or substantially alter[ing] roads, paths or spaces, in particular campsites, sports fields, playgrounds and bathing areas or similar facilities<QUOT.END REF.START="QS0081" CODE="2019" ID="QE0081"/> (subparagraph 1, point 2(c)); <QUOT.START CODE="2018" ID="QS0082" REF.END="QE0082"/>abstract[ing] water above ground or underground to an extent beyond that of permitted public use, … alter[ing] bodies of water, their banks or beds, the inflow or outflow of water or the piezometric level, … creat[ing] new bodies of water or … construct[ing] drainage systems<QUOT.END REF.START="QS0082" CODE="2019" ID="QE0082"/> (subparagraph 1, point 4); <QUOT.START CODE="2018" ID="QS0083" REF.END="QE0083"/>clear[ing], fell[ing] or otherwise remov[ing], in the open countryside and anywhere other than in woodlands, individual trees, hedges, hedgerows or copses or field shrubs that characterise the landscape<QUOT.END REF.START="QS0083" CODE="2019" ID="QE0083"/> (subparagraph 1, point 8); <QUOT.START CODE="2018" ID="QS0084" REF.END="QE0084"/>clear[ing] forest stands in full or in part, carry[ing] out initial afforestation or perform[ing] associated clear-cutting of more than 0.5 hectares, convert[ing] deciduous, mixed or alluvial forests into forests with a predominantly coniferous content or estasblish[ing] specialised crops (such as tree nurseries)<QUOT.END REF.START="QS0084" CODE="2019" ID="QE0084"/> (subparagraph 1, point 9).</P></NOTE> It should be noted, moreover, that this is the assessment of the referring court too.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0049"><P>Point 36 of this Opinion.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0078"><NO.P>78.</NO.P><TXT>The latter activities (subject to a requirement to obtain consent pursuant to Paragraph 5 of the Inntal Süd Regulation) fall full square, as I have said, within the projects listed in Annexes I and II to the EIA Directive.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0050"><P>Projects involving <QUOT.START CODE="2018" ID="QS0085" REF.END="QE0085"/>construction of motorways and express roads<QUOT.END REF.START="QS0085" CODE="2019" ID="QE0085"/> (Annex I(7)(b)); <QUOT.START CODE="2018" ID="QS0086" REF.END="QE0086"/>construction of a new road of four or more lanes<QUOT.END REF.START="QS0086" CODE="2019" ID="QE0086"/> (Annex I(7)(c)); <QUOT.START CODE="2018" ID="QS0087" REF.END="QE0087"/>water management projects for agriculture, including irrigation and land drainage projects<QUOT.END REF.START="QS0087" CODE="2019" ID="QE0087"/> (Annex II(1)(c)) or <QUOT.START CODE="2018" ID="QS0088" REF.END="QE0088"/>initial afforestation and deforestation for the purposes of conversion to another type of land use<QUOT.END REF.START="QS0088" CODE="2019" ID="QE0088"/> (Annex II(1)(d)).</P></NOTE></TXT></NP.ECR><?PAGE NO="18"?><NP.ECR IDENTIFIER="NP0079"><NO.P>79.</NO.P><TXT>Furthermore, Paragraph 5(1), point 1, of the Inntal Süd Regulation talks about the requirement to obtain consent to <QUOT.START CODE="2018" ID="QS0089" REF.END="QE0089"/>erect, change or change the use of <HT TYPE="ITALIC">any kind of construction</HT>),<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0051"><P>My emphasis.</P></NOTE> even if these do not require consent under the building regulations<QUOT.END REF.START="QS0089" CODE="2019" ID="QE0089"/>. Such construction forms part of several types of project listed in Annex I and II to the EIA Directive.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0080"><NO.P>80.</NO.P><TXT>In short, the Inntal Süd Regulation could, in principle, be classified as a plan or programme which, for the purposes of the requirement to obtain a prior SEA, prescribes development consent for projects provided for in Annexes I and II to the EIA Directive.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0081"><NO.P>81.</NO.P><TXT>The next step is to determine whether the Inntal Süd Regulation also contains a reference framework for the future preparation of projects covered by the EIA Directive.</TXT></NP.ECR></GR.SEQ><GR.SEQ LEVEL="4"><TITLE><TI><NP><NO.P><HT TYPE="ITALIC">(b)</HT></NO.P><TXT><HT TYPE="ITALIC">Plan or programme which sets a framework for future development consent of projects</HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0082"><NO.P>82.</NO.P><TXT>Article 3(2)(a) of the SEA Directive states that the plan or programme must set the framework for future development consent of projects listed in Annexes I and II to the EIA Directive.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0083"><NO.P>83.</NO.P><TXT>It is this condition which presents the most difficulties when it comes to implementing the SEA Directive. As I have noted previously, <QUOT.START CODE="2018" ID="QS0090" REF.END="QE0090"/>[the requirement] that the plans and programmes concerned must include the <HT TYPE="ITALIC">legislative framework</HT> for subsequent development consent for projects having significant effects on the environment … is key to the correct determination of the scope of the SEA Directive, without excessive interference in the legislative activities of the Member States<QUOT.END REF.START="QS0090" CODE="2019" ID="QE0090"/>.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0052"><P>Opinion in <HT TYPE="ITALIC">Wind turbines at Aalter and Nevele</HT>, point 74.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0084"><NO.P>84.</NO.P><TXT>The phrase <QUOT.START CODE="2018" ID="QS0091" REF.END="QE0091"/>which set the framework for future development consent<QUOT.END REF.START="QS0091" CODE="2019" ID="QE0091"/> does not include any reference to national laws and therefore constitutes an autonomous concept of European Union law that must be interpreted uniformly throughout the territory thereof.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0053"><P>Judgment in <HT TYPE="ITALIC">Wind turbines at Aalter and Nevele</HT>, paragraph 75.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0085"><NO.P>85.</NO.P><TXT>Plans or programmes set a framework for future development consent of projects covered by the EIA Directive where they are <QUOT.START CODE="2018" ID="QS0092" REF.END="QE0092"/>measure[s] which establish …, by defining rules and procedures for scrutiny applicable to the sector concerned, a significant body of criteria and detailed rules for the grant and implementation of one or more projects likely to have significant effects on the environment<QUOT.END REF.START="QS0092" CODE="2019" ID="QE0092"/>.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0054"><P>Judgments in <HT TYPE="ITALIC">D’Oultremont and Others</HT>, paragraph 49; in <HT TYPE="ITALIC">Inter-Environnement Bruxelles and Others</HT>, paragraph 53; in <HT TYPE="ITALIC">CFE</HT>, paragraph 61; and in <HT TYPE="ITALIC">Wind turbines at Aalter and Nevele</HT>, paragraph 67.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0086"><NO.P>86.</NO.P><TXT>This ensures that specifications likely to have significant environmental effects are subject to an environmental assessment<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0055"><P>Judgment of <REF.DOC.ECR><DATE ISO="20120228">28 February 2012</DATE>, <NAME.CASE><HT TYPE="ITALIC">Inter-Environnement Wallonie and Terre wallonne</HT></NAME.CASE> (<NO.CASE>C‑41/11</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2012:103">EU:C:2012:103</NO.ECLI></REF.DOC.ECR>; <QUOT.START CODE="2018" ID="QS0093" REF.END="QE0093"/>judgment in <HT TYPE="ITALIC">Inter-Environnement Wallonie and Terre wallonne</HT><QUOT.END REF.START="QS0093" CODE="2019" ID="QE0093"/>; paragraph 42); judgments in <HT TYPE="ITALIC">Inter-Environnement Bruxelles and Others</HT>, paragraph 54; and in <HT TYPE="ITALIC">Wind turbines at Aalter and Nevele</HT>, paragraph 68.</P></NOTE> as part of a process laid down by legislation; conversely, it prevents criteria or detailed rules laid down in isolation from requiring an SEA.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0087"><NO.P>87.</NO.P><TXT>The Court has stated that the ‘significant body of criteria and detailed rules’ must be construed qualitatively and not quantitatively. It is sufficient if that <HT TYPE="ITALIC">body</HT> is significant, rather than exhaustive, in order for the plan or programme establishing it to require an SEA. This also puts a<?PAGE NO="19"?> stop to strategies that may be designed to circumvent the obligations laid down in the SEA Directive, for example by splitting measures, thereby reducing the practical effect of that directive.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0056"><P>Opinion in <HT TYPE="ITALIC">Wind turbines at Aalter and Nevele</HT>, point 90. See the judgments in <HT TYPE="ITALIC">Inter-Environnement Bruxelles and Others</HT>, paragraph 55; in <HT TYPE="ITALIC">CFE</HT>, paragraph 64; and in <HT TYPE="ITALIC">Wind turbines at Aalter and Nevele</HT>, paragraph 70.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0088"><NO.P>88.</NO.P><TXT>National legislation sets a framework for the preparation of projects provided for in Annexes I and II to the EIA Directive only if that framework is suitable for shaping those projects.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0057"><P>This idea is shared in their written observations by the Commission and by the Governments of Germany (paragraph 22 of its observations) and the Czech Republic (paragraphs 14, 19 and 23 of its observations), and Ireland (paragraphs 32 and 40 of its observations).</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0089"><NO.P>89.</NO.P><TXT>It is not necessary for the plan or programme to lay down express and detailed provisions governing projects, but it is essential, to my mind, for it to contain a sufficient number of criteria that must be taken into account in the determination of their content, preparation and implementation.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0090"><NO.P>90.</NO.P><TXT>In other words, a plan or programme may have significant effects on the environment and will require a prior SEA if it introduces provisions on the location, characteristics, size and operating conditions of projects and the allocation of resources within them.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0091"><NO.P>91.</NO.P><TXT>In accordance with that case-law, the following, inter alia, set a framework for future development consent of projects because they included a significant body of criteria and detailed rules for their preparation:</TXT><P><LIST TYPE="NDASH"><ITEM><P>Walloon legislation which concerned, in particular, <QUOT.START CODE="2018" ID="QS0094" REF.END="QE0094"/>technical standards, operating conditions (particularly shadow flicker), the prevention of accidents and fires (inter alia, the stopping of the wind turbine), noise level standards, restoration and financial collateral for wind turbines<QUOT.END REF.START="QS0094" CODE="2019" ID="QE0094"/>;<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0058"><P>Judgment in <HT TYPE="ITALIC">D’Oultremont and Others</HT>, paragraph 50, in which the Court went on to say that ‘such standards have a sufficiently significant importance and scope in the determination of the conditions applicable to the sector concerned and the choices, in particular related to the environment, available under those standards must determine the conditions which actual projects for the installation and operation of wind turbine sites may be authorised in the future’.</P></NOTE></P></ITEM><ITEM><P>rules enacted by the Region of Flanders (an order and a circular) containing provisions on the installation and operation of wind turbines, including measures relating to stroboscopic shadowing, safety and noise regulations;.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0059"><P>Judgment in <HT TYPE="ITALIC">Wind turbines at Aalter and Nevele</HT>.</P></NOTE></P></ITEM><ITEM><P>town planning regulations (of the Brussels Capital Region) containing certain requirements concerning the implementation of building projects and rules applicable to all buildings, that is to say to immovable property, of whatever nature, and to all their surroundings, including <QUOT.START CODE="2018" ID="QS0095" REF.END="QE0095"/>areas of open space<QUOT.END REF.START="QS0095" CODE="2019" ID="QE0095"/> and <QUOT.START CODE="2018" ID="QS0096" REF.END="QE0096"/>areas on which building is permissible<QUOT.END REF.START="QS0096" CODE="2019" ID="QE0096"/>, whether public or private.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0060"><P>Judgment in <HT TYPE="ITALIC">Inter-Environnement Bruxelles and Others</HT>, paragraphs 48 to 50.</P></NOTE></P></ITEM></LIST></P></NP.ECR><NP.ECR IDENTIFIER="NP0092"><NO.P>92.</NO.P><TXT>Thus, the plans and programmes examined by the Court in <HT TYPE="ITALIC">D’Oultremont and Others</HT>, <HT TYPE="ITALIC">Inter-Environnement Bruxelles and Others</HT>, and <HT TYPE="ITALIC">Wind turbines at Aalter and Nevele</HT> set frameworks for development consent for projects and, for that reason, required an SEA prior to their adoption.</TXT></NP.ECR><?PAGE NO="20"?><NP.ECR IDENTIFIER="NP0093"><NO.P>93.</NO.P><TXT>Is the same true of the Inntal Süd Regulation? It is for the referring court to analyse whether that is so and whether that regulation contains a significant number of criteria for determining the content, the procedure for preparing, and the implementation of projects provided for in Annexes I and II to Directive 2001/42. In its order for reference, it appears to say not, and, for the reasons I shall set out below, I am in essence of the same view.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0094"><NO.P>94.</NO.P><TXT>The referring court doubts whether the Inntal Süd Regulation really does set a reference framework for the preparation of projects. In its view, that regulation <QUOT.START CODE="2018" ID="QS0097" REF.END="QE0097"/>does not contain any specific rules on development consent for projects [and] does not regulate (sector-specific) consent for projects, but serves primarily to prevent projects or, in any event, to ensure that they are ecologically sound<QUOT.END REF.START="QS0097" CODE="2019" ID="QE0097"/>.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0061"><P>Order for reference, paragraph 25.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0095"><NO.P>95.</NO.P><TXT>The information provided to the Court in this case supports that assessment.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0096"><NO.P>96.</NO.P><TXT>In the first place, the Inntal Süd Regulation lays down (Paragraph 4) a general prohibition, in the protected area, of any activity which alters the character of that area or runs counter to the conservation objective pursued. This general prohibition appears to be of a piece with that laid down at federal level by Paragraph 26(2) of the BNatSchG, and does not include any additional provisions which would enable the Inntal Süd Regulation to be classified as a plan or programme that sets a framework for the preparation of projects.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0097"><NO.P>97.</NO.P><TXT>In the second place, it is true that Paragraph 5 of the Inntal Süd Regulation lays down a requirement to obtain consent for activities in the conservation area and sets precise limits in certain cases (Paragraph 5(1), point 1(a) and (c), Paragraph 5(2)(a), and Paragraph 5(1), point 9, for example). Nonetheless, most of the prohibitions and consents are of a general nature and further measures are required in order for those prohibitions and consents to have a direct bearing on the preparation and implementation of projects covered by the EIA Directive.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0098"><NO.P>98.</NO.P><TXT>As the Commission states,<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0062"><P>Written observations, paragraph 33.</P></NOTE> the vagueness of the provisions contained in the Inntal Süd Regulation means that the latter does not lay down criteria and detailed rules on development consent for projects. Since recourse must be had to other texts in order to prepare such projects, the Inntal Süd Regulation does not in and of itself offer a reference framework for development consent for projects covered by the SEA Directive.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0099"><NO.P>99.</NO.P><TXT>The judgment in <HT TYPE="ITALIC">CFE</HT> is not at odds with what I have just explained, on the contrary in fact. The legislation at issue in that case was a decree of the Government of the Brussels Capital Region designating a Natura 2000 site.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0063"><P><QUOT.START CODE="2018" ID="QS0098" REF.END="QE0098"/>The Sonian forest, together with forest margins and surrounding wooded areas and the Woluwe valley – Sonian forest complex – Woluwe valley<QUOT.END REF.START="QS0098" CODE="2019" ID="QE0098"/>.</P></NOTE> In order to achieve the conservation and protection objectives it defined, that decree provided for preventive measures and laid down general and specific prohibitions. To that end, it reflected choices and formed part of a hierarchy of measures intended to protect the environment, including future management plans.</TXT></NP.ECR><?PAGE NO="21"?><NP.ECR IDENTIFIER="NP0100"><NO.P>100.</NO.P><TXT>Notwithstanding the referring court’s assessment,<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0064"><P>The referring court took the view that the designation of a site as an SAC has legal effects on the adoption of plans and on the consideration of applications for permits affecting the site, both procedurally and in terms of the criteria according to which decisions are made, and therefore contributed to setting the framework for activities that are, in principle, to be accepted, encouraged or prohibited, and thus is not unconnected with the concept of <QUOT.START CODE="2018" ID="QS0099" REF.END="QE0099"/>plan or programme<QUOT.END REF.START="QS0099" CODE="2019" ID="QE0099"/> (judgment in <HT TYPE="ITALIC">CFE</HT>, paragraph 63).</P></NOTE> the Court of Justice held that, subject to those matters which are for the referring court to verify, <QUOT.START CODE="2018" ID="QS0100" REF.END="QE0100"/>a decree such as that at issue in the main proceedings, whereby a Member State designates a [special area of conservation (SAC)], and makes provision as to conservation objectives and certain preventive measures, is not among the <QUOT.START CODE="201C" ID="QS0101" REF.END="QE0101"/>plans and programmes<QUOT.END REF.START="QS0101" CODE="201D" ID="QE0101"/> in respect of which an environmental impact assessment is required<QUOT.END REF.START="QS0100" CODE="2019" ID="QE0100"/>.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0065"><P>Judgment in <HT TYPE="ITALIC">CFE</HT>, paragraphs 62 and 74.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0101"><NO.P>101.</NO.P><TXT>The similarities between Paragraph 5 of the Inntal Süd Regulation and Article 15 of the Belgian Decree are many.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0102"><NO.P>102.</NO.P><TXT>In short, I propose that the Court interpret Article 3(2)(a) of the SEA Directive as meaning that its scope does not extend to a regulation intended to protect nature and the landscape which lays down general prohibitions (with exceptions) and obligations to obtain consent, but does not contain sufficiently detailed rules on the content, preparation and implementation of projects listed in Annexes I and II to the SEA Directive, notwithstanding that it includes certain measures relating to activities forming part of those projects.</TXT></NP.ECR></GR.SEQ></GR.SEQ></GR.SEQ><GR.SEQ LEVEL="2"><TITLE><TI><NP><NO.P><HT TYPE="BOLD"><HT TYPE="ITALIC">B.</HT></HT></NO.P><TXT><HT TYPE="BOLD"><HT TYPE="ITALIC">Third question referred</HT></HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0103"><NO.P>103.</NO.P><TXT>The referring court wishes to ascertain whether Article 3(4) of the SEA Directive must be interpreted as meaning that a regulation such as that at issue here constitutes, at least, a plan or programme with a significant impact on the environment in sectors other than those provided for in paragraph 2 of that provision.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0104"><NO.P>104.</NO.P><TXT>I would recall that Article 3(4) of the SEA Directive extends the scope of that directive. Unlike Article 3(2), it does not automatically assume that certain plans and programmes will have significant effects on the environment but requires the Member States to determine whether that is the case. The plans and programmes to which it extends the Directive are those that set a framework for future development consent of projects but which are not covered by Article 3(2).</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0105"><NO.P>105.</NO.P><TXT>The obligation laid down in Article 3(4) of the SEA Directive (in common with that laid down in Article 3(2)(a) thereof) depends on whether the plan or programme in question sets a framework for future development consent of projects.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0066"><P>Judgment in <HT TYPE="ITALIC">CFE</HT>, paragraph 60.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0106"><NO.P>106.</NO.P><TXT>As I have proposed that the Court’s answer to the first two questions referred should be that a regulation such as that at issue here does not set a framework for future development consent of projects, I am bound to conclude that it also does not fall within the scope of plans and programmes in other sectors for which Article 3(4) of the SEA Directive requires a prior SEA.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0107"><NO.P>107.</NO.P><TXT>Both plans and programmes in sensitive sectors, under Article 3(2), and plans and programmes in non-sensitive sectors but having an impact on the environment, under Article 3(4) of the SEA Directive, must set a framework for development consent for, and the implementation of, specific projects.</TXT></NP.ECR><?PAGE NO="22"?><NP.ECR IDENTIFIER="NP0108"><NO.P>108.</NO.P><TXT>For that reason, there would be an inconsistency in dismissing the proposition that the Inntal Süd Regulation sets a framework for the implementation of projects in sensitive sectors, while, at the same time, accepting that it sets such a framework in the case of non-sensitive sectors.</TXT></NP.ECR></GR.SEQ><GR.SEQ LEVEL="2"><TITLE><TI><NP><NO.P><HT TYPE="BOLD"><HT TYPE="ITALIC">C.</HT></HT></NO.P><TXT><HT TYPE="BOLD"><HT TYPE="ITALIC">Possible limitation of the effects of the judgment of the Court</HT></HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0109"><NO.P>109.</NO.P><TXT>The Landesanwaltschaft Bayern and the German Government would like the Court to limit the effects of its judgment if it finds that the Inntal Süd Regulation required a prior SEA, claiming that the Court should restrict the temporal effects of the judgment or temporarily suspend the ousting effect of the primacy of the SEA Directive.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0110"><NO.P>110.</NO.P><TXT>In the light of the foregoing, it is my view that there is no requirement to draw up an SEA before adopting legislation such as the Inntal Süd Regulation. This allays the fears of a legal vacuum expressed by the Landesanwaltschaft Bayern and the German Government.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0111"><NO.P>111.</NO.P><TXT>There is therefore no need to consider limiting the effects of the interpretative judgment to be given by the Court or suspending the ousting effect of the primacy of the SEA Directive on a national provision that is contrary to it.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0112"><NO.P>112.</NO.P><TXT>Nonetheless, in the event that the Court does not share my view, and decides that a provision such as the Inntal Süd Regulation requires a prior SEA, I shall, in the alternative, analyse the options for limiting the consequences of its judgment.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0113"><NO.P>113.</NO.P><TXT>The referring court notes that, in the Federal Republic of Germany, the view has hitherto been taken that there is no need for nature and landscape conservation areas, including the special areas of conservation under Directive 92/43,<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0067"><P>This reference for a preliminary ruling does not contain a question concerning the natural habitats and wild flora and fauna of Community interest governed by Directive 92/43. The requirements relating to plans and programmes under the SEA Directive cannot be applied without further consideration to the legal rules governing those habitats and species.</P></NOTE> to be made subject to a prior SEA. It goes on to say that:</TXT><P><LIST TYPE="NDASH"><ITEM><P>if the Court were to establish the existence of an obligation under EU law to conduct an SEA or, in any event, a prior examination under national law, it is likely that many designations of protected areas made after the time limit for transposing the SEA Directive, that is to say after <DATE ISO="20040721">21 July 2004</DATE>, would be vitiated by procedural irregularities;</P></ITEM><ITEM><P>in accordance with national law, such an irregularity would in principle render the corresponding regulatory provision ineffective.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0068"><P>According to the referring court (paragraph 16 of the order for reference), the ineffectiveness [of the regulatory provision] could be relied on by anyone wishing to implement a project in the protected area. In that event, the competent court would be obliged to examine the validity of the Inntal Süd Regulation as an ancillary issue, and in the absence of any time limit for such a claim under national law, since regulations – unlike administrative measures – do not become final.</P></NOTE> In this way, the obligation to carry out an SEA or a prior examination could <QUOT.START CODE="2018" ID="QS0102" REF.END="QE0102"/>considerably lower the level of nature and landscape conservation achieved in Germany<QUOT.END REF.START="QS0102" CODE="2019" ID="QE0102"/>.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0069"><P>Paragraph 16 of the order, <HT TYPE="ITALIC">in fine</HT>.</P></NOTE></P></ITEM></LIST></P></NP.ECR><?PAGE NO="23"?><NP.ECR IDENTIFIER="NP0114"><NO.P>114.</NO.P><TXT>Those assertions do not, however, prompt the referring court to seek a limitation of the effects of the (future) judgment of the Court. Its silence in this regard is, in my opinion, a significant indication that there are insufficient grounds of justification for such a limitation.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0070"><P>The referring court points up (in paragraph 16 of the order for reference) the importance of the issues raised but it does not, as I have said before, expressly ask the Court of Justice to limit the effects of any judgment declaring the Inntal Süd Regulation to be incompatible with the SEA Directive.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0115"><NO.P>115.</NO.P><TXT>The Landesanwaltschaft Bayern and the German Government, on the other hand, laid emphasis at the hearing on the adverse consequences for the environment that would flow from invalidating the sites designated as nature and landscape conservation areas, reiterating the claim they had already asserted in the written procedure.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0071"><P>They also drew attention to the administrative burden that would be associated with reopening proceedings for designating sites and conducting SEAs, if they were compulsory.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0116"><NO.P>116.</NO.P><TXT>In order to remedy that situation, Bund Naturschutz proposed at the hearing that the SEA Directive should not be applied to the <HT TYPE="ITALIC">initial</HT> designation of nature conservation areas, which would have a positive impact. Only <HT TYPE="ITALIC">subsequent</HT> amendments to [the designation of] those areas would be subject to the Directive, inasmuch as they reduce environmental protection.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0117"><NO.P>117.</NO.P><TXT>I do not concur with that approach. The SEA does not distinguish between initial consent for plans and programmes and their subsequent amendment, for the purposes of the requirement for a prior SEA. What is more, the Court has stated that an SEA is also required for plans and programmes having a positive impact on the environment.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0072"><P>Judgment in <HT TYPE="ITALIC">CFE</HT>, paragraph 41.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0118"><NO.P>118.</NO.P><TXT>I would recall that, according to the Court, <QUOT.START CODE="2018" ID="QS0103" REF.END="QE0103"/>in the absence of provisions in [Directive 2001/42] on the consequences of infringing the procedural provisions which it lays down, it is for the Member States to take, within the sphere of their competence, all the general or particular measures necessary to ensure that all <QUOT.START CODE="201C" ID="QS0104" REF.END="QE0104"/>plans<QUOT.END REF.START="QS0104" CODE="201D" ID="QE0104"/> or <QUOT.START CODE="201C" ID="QS0105" REF.END="QE0105"/>programmes<QUOT.END REF.START="QS0105" CODE="201D" ID="QE0105"/> likely to have <QUOT.START CODE="201C" ID="QS0106" REF.END="QE0106"/>significant environmental effects<QUOT.END REF.START="QS0106" CODE="201D" ID="QE0106"/> within the meaning of Directive 2001/42 are subject to an environmental assessment prior to their adoption in accordance with the procedural requirements and the criteria laid down by that directive<QUOT.END REF.START="QS0103" CODE="2019" ID="QE0103"/>.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0073"><P>Judgments in <HT TYPE="ITALIC">Wind turbines at Aalter and Nevele</HT>, paragraph 82; and of <REF.DOC.ECR><DATE ISO="20160728">28 July 2016</DATE>, <NAME.CASE><HT TYPE="ITALIC">Association France Nature Environnement</HT></NAME.CASE> (<NO.CASE>C‑379/15</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2016:603">EU:C:2016:603</NO.ECLI></REF.DOC.ECR>; <QUOT.START CODE="2018" ID="QS0107" REF.END="QE0107"/>judgment in <HT TYPE="ITALIC">Association France Nature Environnement</HT><QUOT.END REF.START="QS0107" CODE="2019" ID="QE0107"/>; paragraph 30).</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0119"><NO.P>119.</NO.P><TXT>It is also settled case-law that, under the principle of sincere cooperation (Article 4(3) TEU), Member States are required to eliminate the unlawful consequences of such a breach of EU law. Accordingly, competent national authorities, including national courts hearing an action brought against an act of domestic law that is contrary to EU law, have an obligation to take all measures necessary, within the sphere of their competence, to remedy the failure to carry out an SEA.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0074"><P>This consideration and those I shall set out in the points that follow are consistent with the ones contained in the Opinion in <HT TYPE="ITALIC">Wind turbines at Aalter and Nevele</HT>.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0120"><NO.P>120.</NO.P><TXT>In accordance with that general obligation, a plan or programme adopted without an SEA, in breach of the SEA Directive, should be suspended, annulled or disapplied by the national court in order to give effect to the primacy of EU law. The same fate should certainly await development consents for projects based on such plans or programmes.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0075"><P>See, to this effect, judgment in <HT TYPE="ITALIC">Association France Nature Environnement</HT>, paragraphs 31 and 32; judgment of <REF.DOC.ECR><DATE ISO="20191112">12 November 2019</DATE>, <NAME.CASE><HT TYPE="ITALIC">Commission</HT> v <HT TYPE="ITALIC">Ireland (Derrybrien Wind Farm)</HT></NAME.CASE> (<NO.CASE>C‑261/18</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2019:955">EU:C:2019:955</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0075">75</REF.NP.ECR></REF.DOC.ECR>); and judgment in <HT TYPE="ITALIC">Wind turbines at Aalter and Nevele</HT>, paragraph 83.</P></NOTE></TXT></NP.ECR><?PAGE NO="24"?><GR.SEQ LEVEL="3"><TITLE><TI><NP><NO.P><HT TYPE="ITALIC">1.</HT></NO.P><TXT><HT TYPE="ITALIC">Temporal limitation of the effects of the judgment on the request for a preliminary ruling</HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0121"><NO.P>121.</NO.P><TXT>Judgments of the Court of Justice on requests for a preliminary ruling on interpretation are effective from the point at which the rule of EU law forming the subject of interpretation enters into force.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0076"><P>In accordance with settled case-law, the interpretation which the Court gives to a rule of EU law, in the exercise of the jurisdiction conferred upon it by Article 267 TFEU, clarifies and defines the meaning and scope of that rule as it must be, or ought to have been, understood and applied from the time of its coming into force. It follows that the rule as thus interpreted may and must be applied by the courts to legal relationships arising and established before the judgment ruling on the request for interpretation, provided that in other respects the conditions for bringing before the courts having jurisdiction an action relating to the application of that rule are satisfied (judgments of <REF.DOC.ECR><DATE ISO="20191003">3 October 2019</DATE>, <NAME.CASE><HT TYPE="ITALIC">Schuch-Ghannadan</HT></NAME.CASE>, <NO.CASE>C‑274/18</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2019:828">EU:C:2019:828</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0060">60</REF.NP.ECR></REF.DOC.ECR>, and of <REF.DOC.ECR><DATE ISO="20200916">16 September 2020</DATE>, <NAME.CASE><HT TYPE="ITALIC">Romenergo and Aris Capital</HT></NAME.CASE>, <NO.CASE>C‑339/19</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2020:709">EU:C:2020:709</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0047">47</REF.NP.ECR></REF.DOC.ECR>).</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0122"><NO.P>122.</NO.P><TXT>It is only on a very restrictive basis that the Court permits exceptions to that rule, in application of the general principle of legal certainty inherent in the EU legal order. It does so only if the persons concerned have acted in good faith and if there is a risk of serious difficulties, the burden of proving the presence of those conditions falling to the State relying on them.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0077"><P>Judgments of <REF.DOC.ECR><DATE ISO="20191003">3 October 2019</DATE>, <NAME.CASE><HT TYPE="ITALIC">Schuch-Ghannadan</HT></NAME.CASE> (<NO.CASE>C‑274/18</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2019:828">EU:C:2019:828</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0061">61</REF.NP.ECR></REF.DOC.ECR>), and of <REF.DOC.ECR><DATE ISO="20200916">16 September 2020</DATE>, <NAME.CASE><HT TYPE="ITALIC">Romenergo and Aris Capital</HT></NAME.CASE> (<NO.CASE>C‑339/19</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2020:709">EU:C:2020:709</NO.ECLI>, paragraphs <REF.NP.ECR REF="NP0048">48</REF.NP.ECR> and <REF.NP.ECR REF="NP0050">50</REF.NP.ECR></REF.DOC.ECR>). Paragraph 49 of the latter judgment explains that the Court has taken that step only in quite specific circumstances, notably where there was a risk of serious economic repercussions owing in particular to the large number of legal relationships entered into in good faith on the basis of rules considered to be validly in force and where it appeared that individuals and national authorities had been led to adopt practices which did not comply with EU law by reason of objective, significant uncertainty regarding the implications of EU provisions, to which the conduct of other Member States or the European Commission may even have contributed (judgment of <REF.DOC.ECR><DATE ISO="20191003">3 October 2019</DATE>, <NAME.CASE><HT TYPE="ITALIC">Schuch-Ghannadan</HT></NAME.CASE>, <NO.CASE>C‑274/18</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2019:828">EU:C:2019:828</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0062">62</REF.NP.ECR></REF.DOC.ECR> and the case-law cited).</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0123"><NO.P>123.</NO.P><TXT>The arguments put forward by the Landesanwaltschaft Bayern and the German Government with respect to the adoption of the Inntal Süd Regulation at issue do not strike me as being sufficient to justify their claim.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0124"><NO.P>124.</NO.P><TXT>From the point at which the Court interpreted Articles 2 and 3 of the SEA Directive in its 2012 judgment in <HT TYPE="ITALIC">Inter-Environnement Wallonie</HT> <HT TYPE="ITALIC">and Terre wallonne</HT>, it was at least foreseeable that the German rules governing conservation areas were likely, depending on their content, to be classified as plans or programmes subject to the obligation to carry out a prior SEA, even though the national rules did not require one.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0125"><NO.P>125.</NO.P><TXT>In the same way, it was foreseeable that the Court would take the view that the requirement to carry out an SEA applied not only to plans and programmes adversely affecting the environment but also to those having a positive impact on it (such as those providing for nature conservation areas).<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0078"><P>Judgment in <HT TYPE="ITALIC">CFE</HT>, paragraph 41. It had already previously stated that this was the case with the environmental assessment of projects subject to the EIA Directive, in the judgment of <REF.DOC.ECR><DATE ISO="20080725">25 July 2008</DATE>, <NAME.CASE><HT TYPE="ITALIC">Ecologistas en Acción-CODA</HT></NAME.CASE> (<NO.CASE>C‑142/07</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2008:445">EU:C:2008:445</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0041">41</REF.NP.ECR></REF.DOC.ECR>).</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0126"><NO.P>126.</NO.P><TXT>The fact that the Commission did not bring infringement proceedings against the Federal Republic of Germany (for having failed to carry out an SEA prior to the adoption of plans and programmes concerning nature and landscape conservation areas) is not, in itself, a sufficient ground on which to claim that the German authorities acted in good faith.</TXT></NP.ECR><?PAGE NO="25"?><NP.ECR IDENTIFIER="NP0127"><NO.P>127.</NO.P><TXT>Neither do I consider to be compelling the reasons given by those authorities to support their argument that the annulment of the rules on nature and landscape conservation would <HT TYPE="ITALIC">ipso facto</HT> have <QUOT.START CODE="2018" ID="QS0108" REF.END="QE0108"/>catastrophic<QUOT.END REF.START="QS0108" CODE="2019" ID="QE0108"/> consequences in Germany, as one of the interveners asserted at the hearing. Militating against those reasons is the fact:</TXT><P><LIST TYPE="NDASH"><ITEM><P>first, that the ineffectiveness of the Inntal Süd Regulation might even have a positive impact on the environment if, as Bund Naturschutz argues, this rendered the previous regulation applicable and thus increased the size of the conservation area formerly in place, which the latter regulation reduced; and</P></ITEM><ITEM><P>secondly, that the continued applicability to that area and to all similar areas of the remaining sectoral rules allows administrative control to be exercised over many of the activities having a potential impact on the environment.</P></ITEM></LIST></P></NP.ECR></GR.SEQ><GR.SEQ LEVEL="3"><TITLE><TI><NP><NO.P><HT TYPE="ITALIC">2.</HT></NO.P><TXT><HT TYPE="ITALIC">Temporary suspension of the ousting effect of the primacy of Directive 2001/42 on national law contrary thereto</HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0128"><NO.P>128.</NO.P><TXT>The Court has recognised that the ousting effect which a rule of EU law has on national law that is contrary to it may, exceptionally and in the light of overriding considerations of legal certainty, be temporarily suspended.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0079"><P>Judgment of <REF.DOC.ECR><DATE ISO="20100908">8 September 2010</DATE>, <NAME.CASE><HT TYPE="ITALIC">Winner Wetten</HT></NAME.CASE> (<NO.CASE>C‑409/06</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2010:503">EU:C:2010:503</NO.ECLI>, paragraphs <REF.NP.ECR REF="NP0066">66</REF.NP.ECR> and <REF.NP.ECR REF="NP0067">67</REF.NP.ECR></REF.DOC.ECR>), and judgment in <HT TYPE="ITALIC">Association France Nature Environnement</HT>, paragraph 33.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0129"><NO.P>129.</NO.P><TXT>The Court reserves that right exclusively for itself, and it follows from its case-law that:</TXT><P><LIST TYPE="NDASH"><ITEM><P>if national courts had the power to give provisions of national law primacy in relation to EU law contravened by those provisions, even temporarily, the uniform application of EU law would be undermined;<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0080"><P>Judgment of <REF.DOC.ECR><DATE ISO="20190729">29 July 2019</DATE>, <NAME.CASE><HT TYPE="ITALIC">Inter-Environnement Wallonie and Bond Beter Leefmilieu Vlaanderen</HT></NAME.CASE> (<NO.CASE>C‑411/17</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2019:622">EU:C:2019:622</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0177">177</REF.NP.ECR></REF.DOC.ECR>), and judgment in <HT TYPE="ITALIC">Wind turbines at Aalter and Nevele</HT>, paragraph 84.</P></NOTE></P></ITEM><ITEM><P>if national law permits it, a national court may, by way of exception and following a case-by-case examination, limit the temporal effectiveness of a declaration as to the illegality of a provision of national law adopted in breach of the obligations under the SEA Directive.</P></ITEM></LIST></P></NP.ECR><NP.ECR IDENTIFIER="NP0130"><NO.P>130.</NO.P><TXT>There is disagreement between the parties to the dispute as to whether German law allows the rules on nature conservation areas to be temporarily maintained after they have been annulled. The Landesanwaltschaft Bayern says not,<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0081"><P>Paragraph 50 of its written observations.</P></NOTE> but, according to Bund Naturschutz, the referring court’s case-law tolerates such temporary application in the event of annulment on formal grounds.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0082"><P>Written observations of Bund Naturschutz, p. 25, which cites the judgment of the Bundesverwaltungsgericht (Federal Administrative Court) of <DATE ISO="19791025">25 October 1979</DATE> – 2 N 1/78 – BVerwGE 59, 48-56, paragraph 11. At the hearing, the German Government and the Landesanwaltschaft Bayern denied that that case-law was transposable to the case at issue.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0131"><NO.P>131.</NO.P><TXT>It is for the referring court to determine whether it has available to it the procedural mechanisms that would enable it to maintain the rules on nature and landscape conservation temporarily in force notwithstanding their invalidity<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0083"><P>After the hearing, the Court has been informed of the introduction in Paragraph 22 BNatschGH of subparagraphs 2a and 2b, which allow the maintenance of conservation areas.</P></NOTE>. If not, the case-law of the Court of Justice on the temporal limitation of the ousting effect of primacy could not be applied.</TXT></NP.ECR><?PAGE NO="26"?><NP.ECR IDENTIFIER="NP0132"><NO.P>132.</NO.P><TXT>In the event that German domestic law permitted this, it would still have to be verified whether the temporary ousting of primacy is justified in the light of an overriding consideration relating to environmental protection and whether the remaining conditions laid down in the judgment in <HT TYPE="ITALIC">Inter-Environnement Wallonie Terre wallonne</HT> are met.<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0084"><P>Paragraphs 59 to 63. To the same effect, judgment in <HT TYPE="ITALIC">Association France Nature Environnement</HT>, paragraph 43.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0133"><NO.P>133.</NO.P><TXT>The overriding requirement in the general interest on which the German authorities rely is that protection of the environment would be diminished if they had to repeal the Inntal Süd Regulation at issue and others like it.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0134"><NO.P>134.</NO.P><TXT>In my opinion, it has not been fully demonstrated that the potential invalidity or ineffectiveness<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0085"><P>It falls to the referring court to determine whether, under domestic law, the absence of an SEA prior to the Inntal Süd Regulation results in the invalidity (nullity) or ineffectiveness of that regulation.</P></NOTE> of the regulations concerning nature and landscape conservation areas (on the ground that they had not been the subject of a prior SEA) would inevitably create a legal vacuum of such magnitude as to endanger environmental protection. There are a number of arguments that can be put forward to counter that proposition:</TXT><P><LIST TYPE="NDASH"><ITEM><P>the areas protected prior to the entry into force of the SEA Directive in 2004 would not be affected;</P></ITEM><ITEM><P>in those areas granted protection after 2004, the loss of effectiveness (or, where appropriate, nullity) of regulations adopted without a prior SEA may be at least partially <QUOT.START CODE="2018" ID="QS0109" REF.END="QE0109"/>neutralised<QUOT.END REF.START="QS0109" CODE="2019" ID="QE0109"/> by applying the previous protective provisions, as I have already explained;</P></ITEM><ITEM><P>if, as the referring court notes, regulations which were adopted without a prior SEA but which were not directly contested at the time of their adoption may be challenged by an indirect mechanism (an objection of illegality or an ancillary action), it has not been shown that the judgment bringing such an action to an end is effective <HT TYPE="ITALIC">erga omnes</HT>;<NOTE TYPE="FOOTNOTE" NUMBERING="ARAB" NUMBERING.CONTINUED="YES" NOTE.ID="E0086"><P>It is for the referring court to establish whether a judgment given in an action against a refusal to grant development consent for an individual project, following an assessment of the formal defect vitiating the regulation in question, is to be effective <HT TYPE="ITALIC">erga omnes</HT> or only in relation to the <HT TYPE="ITALIC">indirect</HT> action concerned. In this connection, I refer to points 125 to 130 of my Opinion in <HT TYPE="ITALIC">Wind turbines at Aalter and Nevele</HT>.</P></NOTE></P></ITEM><ITEM><P>the rules at federal and <HT TYPE="ITALIC">Land</HT> level transposing the content of the SEA Directive continue to be binding, enabling the implementation of projects detrimental to the environment to be halted;</P></ITEM><ITEM><P>also still in place are the mechanisms available under sectoral legislation for controlling activities which are potentially harmful to the environment through the application of regulations relating to town planning, building, water management, mining, excavation and earth moving, agriculture, forestry, tourism and other similar activities.</P></ITEM></LIST></P></NP.ECR></GR.SEQ></GR.SEQ></GR.SEQ><?PAGE NO="27"?><GR.SEQ LEVEL="1"><TITLE><TI><NP><NO.P><HT TYPE="BOLD">IV.</HT></NO.P><TXT><HT TYPE="BOLD">Conclusion</HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0135"><NO.P>135.</NO.P><TXT>In the light of the foregoing, I suggest that the Court’s answer to the Bundesverwaltungsgericht (Federal Administrative Court, Germany) should be as follows:</TXT><P><LIST TYPE="ARAB"><ITEM><NP><NO.P>(1)</NO.P><TXT>Article 3(2)(a) of Directive 2001/42/EC of the European Parliament and of the Council of <DATE ISO="20010627">27 June 2001</DATE> on the assessment of the effects of certain plans and programmes on the environment must be interpreted as meaning that its scope does not extend to a regulation intended to protect nature and the landscape which lays down prohibitions (with exceptions) and obligations to obtain consent but which does not contain sufficiently detailed rules on the content, preparation and implementation of projects listed in Annexes I and II to Directive 2011/92/EU of the European Parliament and of the Council of <DATE ISO="20111213">13 December 2011</DATE> on the assessment of the effects of certain public and private projects on the environment, notwithstanding that it provides for certain measures relating to activities forming part of those projects.</TXT></NP></ITEM><ITEM><NP><NO.P>(2)</NO.P><TXT>Article 3(4) of Directive 2001/42 must be interpreted as meaning that it is not applicable to a regulation on nature and landscape conservation which does not constitute a plan or programme having a substantial impact on the environment in sectors other than those referred to in paragraph 2 of that article, because it does not contain sufficiently detailed rules on the content, preparation and implementation of projects listed in Annexes I and II to Directive 2011/92.</TXT></NP></ITEM></LIST></P></NP.ECR></GR.SEQ></CONTENTS.CONCLUSION></CONCLUSION>