<?xml version="1.0" encoding="UTF-8"?><CONCLUSION NNC="YES" xmlns:fmx="http://opoce" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="http://formex.publications.europa.eu/schema/formex-05.55-20141201.xd"><BIB.CONCLUSION><REF.CASE FILE="n.a."><NO.CASE>C‑6/15</NO.CASE></REF.CASE><NO.CELEX>62015CC0006</NO.CELEX><NO.ECLI ECLI="ECLI:EU:C:2016:160">EU:C:2016:160</NO.ECLI><NO.SEQ>0001</NO.SEQ><PAGE.FIRST.ECR>1</PAGE.FIRST.ECR><PAGE.SEQ>1</PAGE.SEQ><PAGE.LAST.ECR>13</PAGE.LAST.ECR><PAGE.TOTAL>13</PAGE.TOTAL></BIB.CONCLUSION><CURR.TITLE><PAGE.HEADER><P>OPINION OF MR MENGOZZI — CASE C‑6/15</P><P>TNS DIMARSO</P></PAGE.HEADER></CURR.TITLE><TITLE><TI><P><HT TYPE="UC">Opinion of Advocate General</HT></P><P><HT TYPE="UC">Mengozzi</HT></P><P>delivered on <DATE ISO="20160310">10 March 2016</DATE><NOTE TYPE="FOOTNOTE" NUMBERING="STAR" NUMBERING.CONTINUED="YES" NOTE.ID="E0001"><P>Original language: French.</P></NOTE></P></TI><STI><P><HT TYPE="BOLD">Case C‑6/15</HT></P><P><HT TYPE="BOLD">TNS Dimarso NV</HT></P><P><HT TYPE="BOLD">v</HT></P><P><HT TYPE="BOLD">Vlaams Gewest(Request for a preliminary ruling</HT></P><P><HT TYPE="NORMAL">from the Raad van State van België (Belgian Council of State))</HT></P></STI></TITLE><INDEX><KEYWORD>Reference for a preliminary ruling</KEYWORD><KEYWORD>Directive 2004/18/EC</KEYWORD><KEYWORD>Article 53</KEYWORD><KEYWORD>Criteria for the award of contracts</KEYWORD><KEYWORD>Tenderers</KEYWORD><KEYWORD>Equal treatment</KEYWORD><KEYWORD>Most economically advantageous tender</KEYWORD><KEYWORD>Evaluation of tenders)</KEYWORD></INDEX><CONTENTS.CONCLUSION><GR.SEQ LEVEL="1"><TITLE><TI><NP><NO.P><HT TYPE="BOLD">I –</HT></NO.P><TXT><HT TYPE="BOLD">Introduction</HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0001"><NO.P>1.</NO.P><TXT>By the present reference for a preliminary ruling, the Raad van State van België (Belgian Council of State) seeks, in essence, to ascertain whether Article 53(2) of Directive 2004/18/EC of the European Parliament and of the Council of <DATE ISO="20040331">31 March 2004</DATE> on the coordination of procedures for the award of public works contracts, public supply contracts and public service contracts,<NOTE TYPE="FOOTNOTE" NUMBERING="STAR" NUMBERING.CONTINUED="YES" NOTE.ID="E0002"><P><REF.DOC.OJ COLL="L" NO.OJ="134" PAGE.FIRST="114" DATE.PUB="2004">OJ 2004 L 134, p. 114</REF.DOC.OJ>. Directive as modified by Commission Regulation (EU) No 1251/2011 of <DATE ISO="20111130">30 November 2011</DATE> amending Directives 2004/17/EC and 2009/81/EC of the European Parliament and of the Council in respect of their application thresholds for the procedures for the awards of contract (<REF.DOC.OJ COLL="L" NO.OJ="319" PAGE.FIRST="43" DATE.PUB="2011">OJ 2011 L 319, p. 43</REF.DOC.OJ>, <QUOT.START CODE="2018" ID="QS0001" REF.END="QE0001"/>Directive 2004/18<QUOT.END REF.START="QS0001" CODE="2019" ID="QE0001"/>).</P></NOTE> read in the light of the principles of equal treatment and transparency, requires that a contracting authority should always, or, if not, in certain circumstances, make known in advance, in the contract notice or the contract documents, the method of evaluation or weighting rules used to assess tenderers’ bids.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0002"><NO.P>2.</NO.P><TXT>That request was made in the context of a dispute between TNS Dimarso NV (<QUOT.START CODE="2018" ID="QS0002" REF.END="QE0002"/>Dimarso<QUOT.END REF.START="QS0002" CODE="2019" ID="QE0002"/>) and Vlaams Gewest (Flemish Government Housing Agency, <QUOT.START CODE="2018" ID="QS0003" REF.END="QE0003"/>the Housing Agency<QUOT.END REF.START="QS0003" CODE="2019" ID="QE0003"/>) concerning the lawfulness of the method used to evaluate bids submitted by tenderers in a procedure for the award of a public service contract organised by the Housing Agency.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0003"><NO.P>3.</NO.P><TXT>In summary, it is clear from the order for reference that, through a call for tenders published in the <HT TYPE="ITALIC">Official Journal of the European Union</HT> of <DATE ISO="20120131">31 January 2012</DATE>, the Housing Agency launched a procedure for the award of a service contract for the performance of a large-scale survey of housing and housing consumers in Flanders. The estimated value of that contract was EUR <FT TYPE="NUMBER">1400000</FT>, including VAT.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0004"><NO.P>4.</NO.P><TXT>The contract documents relating to that procedure referred to the following two award criteria:</TXT></NP.ECR><QUOT.S LEVEL="1"><P><QUOT.START CODE="2018" ID="QS0004" REF.END="QE0004"/>1 Quality of the tender (50/100)</P><?PAGE NO="2"?><P>Quality of the preparation, organisation and execution of the work on the ground, and of the encryption and initial data processing. The services proposed must be described in as much detail as possible. It must be clear from the tender that the tenderer is capable of taking on the whole contract (minimum <FT TYPE="NUMBER">7000</FT> samples / maximum <FT TYPE="NUMBER">10000</FT> samples) within the prescribed 12-month delivery deadline.</P><P>2 Price (50/100)</P><P>Cost of delivering the contract in relation to the basic sample (<FT TYPE="NUMBER">7000</FT> samples) and cost per additional batch of 500 addresses supplied (amounts inclusive of VAT).<QUOT.END REF.START="QS0004" CODE="2019" ID="QE0004"/></P></QUOT.S><NP.ECR IDENTIFIER="NP0005"><NO.P>5.</NO.P><TXT>Four tenderers submitted tenders, which, according to the evaluation committee’s report on the qualitative selection, met the minimum requirements in regard to technical competence. The method used to evaluate the tenders was set out as follows in the evaluation committee’s award report of <DATE ISO="20120323">23 March 2012</DATE>:</TXT><P><QUOT.S LEVEL="1"><P><QUOT.START CODE="2018" ID="QS0005" REF.END="QE0005"/>The committee then evaluated the tenders.</P><P>The four tenders were evaluated and compared with each other on the basis of the criteria set out above. First, the tenders were examined and evaluated on the basis of the <QUOT.START CODE="201C" ID="QS0006" REF.END="QE0006"/>quality<QUOT.END REF.START="QS0006" CODE="201D" ID="QE0006"/> criterion. For this, each tender was unanimously assigned a given score (high — satisfactory — low). Then, the price criterion was applied.</P><P>On the basis of those scores, a final ranking was established.<QUOT.END REF.START="QS0005" CODE="2019" ID="QE0005"/></P></QUOT.S></P></NP.ECR><NP.ECR IDENTIFIER="NP0006"><NO.P>6.</NO.P><TXT>It is clear from the award report that, as regards the first criterion, namely the quality of the tenders, Dimarso and two other tenderers were rated <QUOT.START CODE="2018" ID="QS0007" REF.END="QE0007"/>high<QUOT.END REF.START="QS0007" CODE="2019" ID="QE0007"/>, while the fourth tenderer was assessed as <QUOT.START CODE="2018" ID="QS0008" REF.END="QE0008"/>low<QUOT.END REF.START="QS0008" CODE="2019" ID="QE0008"/>. As regards the second criterion, namely price, while the fourth tenderer’s offer was lowest, Dimarso’s was highest.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0007"><NO.P>7.</NO.P><TXT>On <DATE ISO="20120411">11 April 2012</DATE>, the contract was finally awarded to one of the tenderers which had been rated <QUOT.START CODE="2018" ID="QS0009" REF.END="QE0009"/>high<QUOT.END REF.START="QS0009" CODE="2019" ID="QE0009"/> and whose price offer was lower than Dimarso’s.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0008"><NO.P>8.</NO.P><TXT>In support of its action for annulment of the contract award decision, Dimarso submits before the referring court that the evaluation committee appears to have evaluated the tenders on the basis of the <QUOT.START CODE="2018" ID="QS0010" REF.END="QE0010"/>high — satisfactory — low<QUOT.END REF.START="QS0010" CODE="2019" ID="QE0010"/> scale, not referred to in the contract documents, in relation to the tender quality criterion, whereas, according to Dimarso, it is clear from the contract documents that a score of 0 to 50 points should have been allocated to each tender. As regards the price criterion, the evaluation committee also failed to carry out an adequate examination, comparison and final assessment of the tenders taking into account the award criteria as set out in the contract documents, including the <QUOT.START CODE="201C" ID="QS0011" REF.END="QE0011"/>50/100<QUOT.END REF.START="QS0011" CODE="201D" ID="QE0011"/> weighting given to each of the award criteria in the call for tenders.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0009"><NO.P>9.</NO.P><TXT>The referring court notes first of all, in rejecting the first part of the action brought before it by Dimarso, that it is not unreasonable to interpret the <QUOT.START CODE="2018" ID="QS0012" REF.END="QE0012"/>50/100<QUOT.END REF.START="QS0012" CODE="2019" ID="QE0012"/> weighting, given to each of the award criteria in the contract documents, as meaning that it seeks only to indicate that each of the two criteria must be regarded as having the same value and that each of them will therefore determine half of the ranking of the tenders.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0010"><NO.P>10.</NO.P><TXT>It notes next that both recital 46 and Article 53(2) of Directive 2004/18 refer only to the <QUOT.START CODE="2018" ID="QS0013" REF.END="QE0013"/>criteria<QUOT.END REF.START="QS0013" CODE="2019" ID="QE0013"/> and the <QUOT.START CODE="2018" ID="QS0014" REF.END="QE0014"/>relative weighting<QUOT.END REF.START="QS0014" CODE="2019" ID="QE0014"/> given to each of them, the method of evaluation and weighting rules not being expressly mentioned anywhere. The national court states that the method of evaluation is not neutral but may, on the contrary, play a decisive role in the outcome of the evaluation of the tenders on the basis of the award criteria. It cites the example of the price award criterion, in connection with<?PAGE NO="3"?> which the contracting authority may, inter alia, opt to apply the principle of proportionality, award the maximum score to the lowest-priced tender or a zero score to the highest-priced, applying a linear interpolation to the intermediate tenders, or look most favourably on the tender with the median price.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0011"><NO.P>11.</NO.P><TXT>The national court points out, lastly, that neither the judgment in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">Lianakis and Others</HT></NAME.CASE> (<NO.CASE>C‑532/06</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2008:40">EU:C:2008:40</NO.ECLI>, paragraphs <REF.NP.ECR REF="NP0038">38</REF.NP.ECR>, <REF.NP.ECR REF="NP0044">44</REF.NP.ECR> and <REF.NP.ECR REF="NP0045">45</REF.NP.ECR></REF.DOC.ECR>), which was concerned with the interpretation of Article 36(2) of Council Directive 92/50/EEC of <DATE ISO="19920618">18 June 1992</DATE> relating to the coordination of procedures for the award of public service contracts,<NOTE TYPE="FOOTNOTE" NUMBERING="STAR" NUMBERING.CONTINUED="YES" NOTE.ID="E0003"><P><REF.DOC.OJ COLL="L" NO.OJ="209" PAGE.FIRST="1" DATE.PUB="1992">OJ 1992 L 209, p. 1</REF.DOC.OJ>.</P></NOTE> the content of which is, in essence, the same as that of Article 53(2) of Directive 2004/18, nor the judgment in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">Evropaïki Dynamiki</HT> v <HT TYPE="ITALIC">EMSA</HT></NAME.CASE> (<NO.CASE>C‑252/10 P</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2011:512">EU:C:2011:512</NO.ECLI></REF.DOC.ECR>), provide an answer, or at least not a decisive answer, to the question arising in the case in the main proceedings, that is to say whether the method of evaluation, that is to say the specific method to be used by the contracting authority to score the tenders, must be made known to tenderers in advance, like the award criteria and sub-criteria and the <QUOT.START CODE="2018" ID="QS0015" REF.END="QE0015"/>weighting factors<QUOT.END REF.START="QS0015" CODE="2019" ID="QE0015"/>.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0012"><NO.P>12.</NO.P><TXT>In the light of those considerations, the Raad van State van België (Belgian Council of State) decided to stay the proceedings and refer the following question to the Court for a preliminary ruling:</TXT><P><QUOT.S LEVEL="1"><P><QUOT.START CODE="2018" ID="QS0016" REF.END="QE0016"/>Must Article 53(2) of Directive 2004/18/EC …, both in isolation and in conjunction with the scope of the principles laid down by European law concerning equality and transparency in the field of public procurement, be interpreted as meaning that, if the contract is awarded to the tenderer who submits the most economically advantageous tender from the point of view of the contracting authority, the contracting authority is always required to establish in advance, and indicate in the contract notice or contract documents, the method of assessment or the weighting rules, irrespective of their scope, predictability or commonness, in the light of which the tenders will be assessed in accordance with the award criteria or sub-criteria,</P><P>or, if no such general obligation exists, that there are circumstances, such as, inter alia, the scope, unpredictability or uncommonness of these weighting rules, in which this obligation does apply?<QUOT.END REF.START="QS0016" CODE="2019" ID="QE0016"/></P></QUOT.S></P></NP.ECR><NP.ECR IDENTIFIER="NP0013"><NO.P>13.</NO.P><TXT>That question was the subject of written observations submitted by Dimarso, the Belgian and Italian Governments and the European Commission. Those parties also presented oral argument at the hearing on <DATE ISO="20160113">13 January 2016</DATE>, with the exception of the Italian Government, which was not represented.</TXT></NP.ECR></GR.SEQ><GR.SEQ LEVEL="1"><TITLE><TI><NP><NO.P><HT TYPE="BOLD">II –</HT></NO.P><TXT><HT TYPE="BOLD">Analysis</HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0014"><NO.P>14.</NO.P><TXT>By the question referred to it in the present case, the Court is asked to define the scope of Article 53(2) of Directive 2004/18. More specifically, the Court is asked whether, in the light of the principles of equal treatment and transparency, that provision requires the contracting authority, when awarding a service contract to the most economically advantageous tender, to inform tenderers, in the contract notice or the contract documents, of the method of evaluation used to assess tenderers’ bids.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0015"><NO.P>15.</NO.P><TXT>As a preliminary point, it is important to say that it is common ground that the service contract at issue in the case in the main proceedings falls squarely within the scope of Directive 2004/18 and that, in particular, Article 53 of that directive is fully applicable to that contract.</TXT></NP.ECR><?PAGE NO="4"?><NP.ECR IDENTIFIER="NP0016"><NO.P>16.</NO.P><TXT>First, under Article 20 of Directive 2004/18, contracts which have as their object services listed in Annex II A to that directive, which include, in Category 10, contracts relating to <QUOT.START CODE="2018" ID="QS0017" REF.END="QE0017"/>Market research and public opinion polling services<QUOT.END REF.START="QS0017" CODE="2019" ID="QE0017"/>, are awarded in accordance with the provisions of Articles 23 to 55 of that directive. Secondly, the service contract in the case in the main proceedings significantly exceeded the threshold of EUR <FT TYPE="NUMBER">200000</FT>, referred to in Article 7(b) of Directive 2004/18, applicable at the time when the contract notice was published by the Housing Agency.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0017"><NO.P>17.</NO.P><TXT>In accordance with Article 53 of Directive 2004/18, entitled <QUOT.START CODE="2018" ID="QS0018" REF.END="QE0018"/>Contract award criteria<QUOT.END REF.START="QS0018" CODE="2019" ID="QE0018"/>, public contracts are awarded either to the tender which proposes <QUOT.START CODE="2018" ID="QS0019" REF.END="QE0019"/>the lowest price<QUOT.END REF.START="QS0019" CODE="2019" ID="QE0019"/>, or to the <QUOT.START CODE="2018" ID="QS0020" REF.END="QE0020"/>tender most economically advantageous from the point of view of the contracting authority<QUOT.END REF.START="QS0020" CODE="2019" ID="QE0020"/>, that is to say, as the third sentence of recital 46 of that directive states, and as the Court has further noted, the tender which <QUOT.START CODE="2018" ID="QS0021" REF.END="QE0021"/>offers the best value for money<QUOT.END REF.START="QS0021" CODE="2019" ID="QE0021"/> from the point of view of the contracting authority.<NOTE TYPE="FOOTNOTE" NUMBERING="STAR" NUMBERING.CONTINUED="YES" NOTE.ID="E0004"><P>See judgment in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">Ambisig</HT></NAME.CASE> (<NO.CASE>C‑601/13</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2015:204">EU:C:2015:204</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0029">29</REF.NP.ECR></REF.DOC.ECR>).</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0018"><NO.P>18.</NO.P><TXT>Where the latter option is selected, as it was in the case of the service contract at issue in the case in the main proceedings, Article 53(1)(a) of Directive 2004/18 establishes a non-exhaustive list of criteria linked to the subject matter of the public contract in question which the contracting authority is entitled to take into account.<NOTE TYPE="FOOTNOTE" NUMBERING="STAR" NUMBERING.CONTINUED="YES" NOTE.ID="E0005"><P>The non-restrictive nature of those criteria has regularly been recalled by the Court: see, recently, the judgments in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">eVigilo</HT></NAME.CASE> (<NO.CASE>C‑538/13</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2015:166">EU:C:2015:166</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0061">61</REF.NP.ECR></REF.DOC.ECR>) and <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">Ambisig</HT></NAME.CASE> (<NO.CASE>C‑601/13</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2015:204">EU:C:2015:204</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0030">30</REF.NP.ECR></REF.DOC.ECR>).</P></NOTE> Those criteria include quality and price, which, as the contract documents in the case in the main proceedings indicate, are the only two criteria that were taken into account by the Housing Agency when awarding the contract at issue in the main proceedings.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0019"><NO.P>19.</NO.P><TXT>In the aforementioned situation of a contract awarded to the most economically advantageous tender, the first subparagraph of Article 53(2) of Directive 2004/18 provides that the contracting authority is to specify in the contract notice or the contract documents <QUOT.START CODE="2018" ID="QS0022" REF.END="QE0022"/>the relative weighting which it gives to each of the criteria chosen to determine [that] tender<QUOT.END REF.START="QS0022" CODE="2019" ID="QE0022"/>. The second subparagraph of the same provision states that that weighting can be expressed by providing for a range with an appropriate maximum spread. According to the third subparagraph of that provision, where, in the opinion of the contracting authority, weighting is not possible for demonstrable reasons, the latter is to indicate in the contract notice or contract documents the criteria in descending order of importance.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0020"><NO.P>20.</NO.P><TXT>It should be observed here and now that the obligation to indicate not only the award criteria but also, since the adoption of Directive 2004/18, the relative weighting given to each of those criteria, except where there are good reasons why weighting is not possible, at the time of publication of the contract notice or contract documents, as laid down in Article 53(2) of that directive, serves to fulfil the requirement of compliance with the principle of equal treatment and the associated obligation of transparency.<NOTE TYPE="FOOTNOTE" NUMBERING="STAR" NUMBERING.CONTINUED="YES" NOTE.ID="E0006"><P>See, to that effect, the judgment in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">Commission</HT> v <HT TYPE="ITALIC">Ireland</HT></NAME.CASE> (<NO.CASE>C‑226/09</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2010:697">EU:C:2010:697</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0043">43</REF.NP.ECR></REF.DOC.ECR>). I would recall, to the extent necessary, that it is settled case-law that, under the principle of equal treatment between tenderers, the aim of which is to promote the development of healthy and effective competition between undertakings taking part in a public procurement procedure, all tenderers must be afforded equality of opportunity when formulating their tenders, which therefore implies that the tenders of all competitors must be subject to the same conditions [see, to that effect, in particular, the judgments in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">Cartiera dell’Adda</HT></NAME.CASE> (<NO.CASE>C‑42/13</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2014:2345">EU:C:2014:2345</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0044">44</REF.NP.ECR></REF.DOC.ECR>) and <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">eVigilo</HT></NAME.CASE> (<NO.CASE>C‑538/13</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2015:166">EU:C:2015:166</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0033">33</REF.NP.ECR></REF.DOC.ECR>)]. The Court has also stated that the obligation of transparency is essentially intended to preclude any risk of favouritism or arbitrariness on the part of the contracting authority with respect to certain tenderers or certain tenders [see, in that regard, the judgments in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">Cartiera dell’Adda</HT></NAME.CASE> (<NO.CASE>C‑42/13</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2014:2345">EU:C:2014:2345</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0044">44</REF.NP.ECR></REF.DOC.ECR>) and <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">eVigilo</HT></NAME.CASE> (<NO.CASE>C‑538/13</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2015:166">EU:C:2015:166</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0034">34</REF.NP.ECR></REF.DOC.ECR>)].</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0021"><NO.P>21.</NO.P><TXT>As regards the need to disclose the weightings given to the award criteria, it is important to note that Article 53(2) of Directive 2004/18 marks a notable change from the former legal regime applicable to the award of public service contracts.</TXT></NP.ECR><?PAGE NO="5"?><NP.ECR IDENTIFIER="NP0022"><NO.P>22.</NO.P><TXT>After all, under the legal regime in place before the entry into force of that act, Article 36(2) of Council Directive 92/50 required the contracting authorities only to indicate, in the contract documents or the contract notice, the award criteria which they intended to apply, <QUOT.START CODE="2018" ID="QS0023" REF.END="QE0023"/>where possible in descending order of importance<QUOT.END REF.START="QS0023" CODE="2019" ID="QE0023"/>.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0023"><NO.P>23.</NO.P><TXT>Now, however, the contracting authorities have an obligation to indicate the weightings of the award criteria in the contract notice or the contract documents. It is only in the event that this proves impossible, for demonstrable reasons, that those entities may opt to prioritise those criteria, which prioritisation must in any event be adequately disclosed in the contract notice or the contract documents.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0024"><NO.P>24.</NO.P><TXT>As I shall say when I come back to this point later, that change has some bearing on the resolution of the case in the main proceedings.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0025"><NO.P>25.</NO.P><TXT>At this stage, it should be observed that, in the case in the main proceedings, it is common ground that the contract documents referred to <QUOT.START CODE="2018" ID="QS0024" REF.END="QE0024"/>50/100<QUOT.END REF.START="QS0024" CODE="2019" ID="QE0024"/> in connection with each of the two criteria used by the contracting authority. The referring court held that that reference could reasonably be interpreted as meaning that each of the two criteria was to be regarded as having the same value and each therefore determined half of the ranking of the tenders.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0026"><NO.P>26.</NO.P><TXT>It is important to note that that assessment is final. It is after all unambiguously clear from the request for a preliminary ruling, and was confirmed by Dimarso at the hearing before the Court, that the referring court rejected the first part of the action brought before it by Dimarso, to the effect, in essence, that the <QUOT.START CODE="2018" ID="QS0025" REF.END="QE0025"/>50/100<QUOT.END REF.START="QS0025" CODE="2019" ID="QE0025"/> reference should have been interpreted as meaning that the <QUOT.START CODE="2018" ID="QS0026" REF.END="QE0026"/>quality<QUOT.END REF.START="QS0026" CODE="2019" ID="QE0026"/> criterion should have been evaluated by awarding each tender a score from 0 to 50 points. The referring court therefore accepted, in essence, that the weighted value of each of those two contract award criteria, as given in the contract documents, was identical, namely 50%, a fact which reasonably well-informed and normally diligent tenderers were able to interpret in the same way.<NOTE TYPE="FOOTNOTE" NUMBERING="STAR" NUMBERING.CONTINUED="YES" NOTE.ID="E0007"><P>The standard of the reasonably well-informed and normally diligent tenderer stems from the Court’s case-law: see, in that regard, the judgments in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">SIAC Construction</HT></NAME.CASE> (<NO.CASE>C‑19/00</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2001:553">EU:C:2001:553</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0042">42</REF.NP.ECR></REF.DOC.ECR>) and <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">eVigilo</HT></NAME.CASE> (<NO.CASE>C‑538/13</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2015:166">EU:C:2015:166</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0054">54</REF.NP.ECR></REF.DOC.ECR>).</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0027"><NO.P>27.</NO.P><TXT>It is therefore common ground that the award criteria for the public contract in question and the relative weighting given to each of those criteria were communicated to the tenderers in the contract documents and, therefore, in advance of the award of the contract, in accordance, prima facie, with Article 53(2) of Directive 2004/18.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0028"><NO.P>28.</NO.P><TXT>The referring court wishes to ascertain, however, whether the latter provision, read in the light of the principle of equal treatment and the obligation of transparency, requires the contracting authority, either systematically or, at the very least, in certain circumstances, to inform tenderers in advance of the method to be used to evaluate tenders against the award criteria, in particular, so far as concerns the case in the main proceedings, the method used to assess compliance with the <QUOT.START CODE="2018" ID="QS0027" REF.END="QE0027"/>quality<QUOT.END REF.START="QS0027" CODE="2019" ID="QE0027"/> criterion published by the Housing Agency, that is to say a ranking scale of three ratings or scores (<QUOT.START CODE="2018" ID="QS0028" REF.END="QE0028"/>low — medium — high<QUOT.END REF.START="QS0028" CODE="2019" ID="QE0028"/>).</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0029"><NO.P>29.</NO.P><TXT>That question must be understood in the context of Dimarso’s argument that, in essence, the method of evaluation used (<QUOT.START CODE="2018" ID="QS0029" REF.END="QE0029"/>low — medium — high<QUOT.END REF.START="QS0029" CODE="2019" ID="QE0029"/>) was so vague that it prompted the contracting authority to downgrade the assessment of the <QUOT.START CODE="2018" ID="QS0030" REF.END="QE0030"/>quality<QUOT.END REF.START="QS0030" CODE="2019" ID="QE0030"/> criterion relative to that of the <QUOT.START CODE="2018" ID="QS0031" REF.END="QE0031"/>price<QUOT.END REF.START="QS0031" CODE="2019" ID="QE0031"/> criterion, since the second criterion alone was actually capable of eliminating three of the four tenders submitted. In reality, therefore, Dimarso contends, the price criterion benefited from a higher relative weighting than the 50% previously announced in the contract documents. In other words, Dimarso submits that, if the method of evaluation had been made known to tenderers in advance, at the stage when the contract documents were published, it would inevitably have had an effect on the preparation of the tenders.</TXT></NP.ECR><?PAGE NO="6"?><NP.ECR IDENTIFIER="NP0030"><NO.P>30.</NO.P><TXT>I am by no means insensitive to that argument. It is important, however, to think it through in stages.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0031"><NO.P>31.</NO.P><TXT>First of all, as I have already pointed out, Article 53(2) of Directive 2004/18 requires the contracting authority to make known to tenderers, either in the contract notice or the contract documents, the award criteria it intends to use and the relative weightings attached to them.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0032"><NO.P>32.</NO.P><TXT>However, there would be no point in scouring the wording of Article 53(2) of Directive 2004/18 for a general obligation requiring the contracting authority to set out in the contract notice or the contract documents the method to be used to evaluate tenders in the light of the award criteria and their relative weightings, that is to say all of the rules and processes in accordance with which a contracting authority or a pared-down version of one, such as an evaluation committee, will attribute a given score or rating to the various tenders depending on the extent to which those tenders meet one of the criteria (and/or, where appropriate, sub-criteria) for the award of a public contract.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0033"><NO.P>33.</NO.P><TXT>Article 53(2) of Directive 2004/18 does not therefore require that the use of such a method, by an evaluation committee, for analysing tenders in the light of the criteria for the award of a public contract and their relative weightings should, in principle, be communicated to tenderers in advance in the contract notice or the contract documents.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0034"><NO.P>34.</NO.P><TXT>The Court’s case-law also confirms that principle.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0035"><NO.P>35.</NO.P><TXT>First, it should be recalled that the Court has on several occasions recognised as lawful the conduct of a contracting authority which had weighted the subheadings of an award criterion <HT TYPE="ITALIC">after</HT> tenders were submitted but <HT TYPE="ITALIC">before</HT> they were opened, which necessarily implies that the contracting authority is not systematically required to make known in advance the weightings thus given to the award sub-criteria in the contract notice or the contract documents.<NOTE TYPE="FOOTNOTE" NUMBERING="STAR" NUMBERING.CONTINUED="YES" NOTE.ID="E0008"><P>See the judgments in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">ATI EAC e Viaggi di Maio and Others</HT></NAME.CASE> (<NO.CASE>C‑331/04</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2005:718">EU:C:2005:718</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0032">32</REF.NP.ECR></REF.DOC.ECR>); <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">Lianakis and Others</HT></NAME.CASE> (<NO.CASE>C‑532/06</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2008:40">EU:C:2008:40</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0043">43</REF.NP.ECR></REF.DOC.ECR>); and <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">Evropaïki Dynamiki</HT> v <HT TYPE="ITALIC">EMSA</HT></NAME.CASE> (<NO.CASE>C‑252/10 P</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2011:512">EU:C:2011:512</NO.ECLI>, paragraphs <REF.NP.ECR REF="NP0032">32</REF.NP.ECR> and <REF.NP.ECR REF="NP0033">33</REF.NP.ECR></REF.DOC.ECR>).</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0036"><NO.P>36.</NO.P><TXT>That assessment may, <HT TYPE="ITALIC">a fortiori</HT>, be extended to the adoption of a method for evaluating tenders in the light of award criteria and their relative weightings.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0037"><NO.P>37.</NO.P><TXT>Secondly, in the judgment in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">Evropaïki Dynamiki</HT> v <HT TYPE="ITALIC">EMSA</HT></NAME.CASE> (<NO.CASE>C‑252/10 P</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2011:512">EU:C:2011:512</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0035">35</REF.NP.ECR></REF.DOC.ECR>), the Court accepted — in the context of applying the rules for the award of public service contracts by the institutions of the European Union,<NOTE TYPE="FOOTNOTE" NUMBERING="STAR" NUMBERING.CONTINUED="YES" NOTE.ID="E0009"><P>The case in question concerned the interpretation of Article 97 of Council Regulation (EC, Euratom) No 1605/2002 of <DATE ISO="20020625">25 June 2002</DATE> on the Financial Regulation applicable to the general budget of the European Communities (<REF.DOC.OJ COLL="L" NO.OJ="248" PAGE.FIRST="1" DATE.PUB="2002">OJ 2002 L 248, p. 1</REF.DOC.OJ>) and Article 138 of Commission Regulation (EC, Euratom) No 2342/2002 of <DATE ISO="20021223">23 December 2002</DATE> laying down detailed rules for the implementation of Regulation No 1605/2002 (<REF.DOC.OJ COLL="L" NO.OJ="357" PAGE.FIRST="1" DATE.PUB="2002">OJ 2002 L 357, p. 1</REF.DOC.OJ>).</P></NOTE> very similar to the context of applying the provisions of Directive 2004/18, and in the course of considering which information need not be communicated in advance by the contracting authority to tenderers — that an evaluation committee must be able to have some leeway in carrying out its task and to structure its own work of examining and analysing the submitted tenders.<NOTE TYPE="FOOTNOTE" NUMBERING="STAR" NUMBERING.CONTINUED="YES" NOTE.ID="E0010"><P>See also, in the same legal context, the judgment in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">bpost</HT> v <HT TYPE="ITALIC">Commission</HT></NAME.CASE> (<NO.CASE>T‑514/09</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:T:2011:689">EU:T:2011:689</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0086">86</REF.NP.ECR></REF.DOC.ECR>).</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0038"><NO.P>38.</NO.P><TXT>In all of those cases, the Court nonetheless stated that the leeway enjoyed by the contracting authority is subject to compliance with certain conditions.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0039"><NO.P>39.</NO.P><TXT>Those conditions do not, however, appear to be entirely uniform.</TXT></NP.ECR><?PAGE NO="7"?><NP.ECR IDENTIFIER="NP0040"><NO.P>40.</NO.P><TXT>Thus, in cases where a contracting authority has determined weighting factors for award sub-criteria after tenders have been submitted, the Court has held, as the referring court rightly pointed out, that such ex post determination is lawful provided that it meets three conditions, namely:</TXT><P><LIST TYPE="DASH"><ITEM><P>that it does not alter the criteria for the award of the contract set out in the contract documents or the contract notice,</P></ITEM><ITEM><P>that it does not contain elements which, if they had been known at the time the tenders were prepared, could have affected that preparation, and</P></ITEM><ITEM><P>that it was not adopted taking into account matters likely to give rise to discrimination against one of the tenderers.<NOTE TYPE="FOOTNOTE" NUMBERING="STAR" NUMBERING.CONTINUED="YES" NOTE.ID="E0011"><P>See the judgments in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">ATI EAC e Viaggi di Maio and Others</HT></NAME.CASE> (<NO.CASE>C‑331/04</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2005:718">EU:C:2005:718</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0032">32</REF.NP.ECR></REF.DOC.ECR>); <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">Lianakis and Others</HT></NAME.CASE> (<NO.CASE>C‑532/06</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2008:40">EU:C:2008:40</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0043">43</REF.NP.ECR></REF.DOC.ECR>); and <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">Evropaïki Dynamiki</HT> v <HT TYPE="ITALIC">EMSA</HT></NAME.CASE> (<NO.CASE>C‑252/10 P</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2011:512">EU:C:2011:512</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0033">33</REF.NP.ECR></REF.DOC.ECR>).</P></NOTE></P></ITEM></LIST></P></NP.ECR><NP.ECR IDENTIFIER="NP0041"><NO.P>41.</NO.P><TXT>If one of those conditions is not met, that case-law supports the inference that determining the weighting of sub-criteria after publication of the contract notice or the contract documents renders the procedure for awarding the contract unlawful. In other words, the contracting authority should have determined the weighting of the sub-criteria relating to the contract award criteria in advance and should have ensured that that weighting had been communicated to tenderers in the contract notice or the contract documents.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0042"><NO.P>42.</NO.P><TXT>Furthermore, as regards an evaluation committee’s leeway in structuring its own work of analysing and examining the submitted tenders, the Court stated, in paragraph 35 of the judgment in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">Evropaïki Dynamiki</HT> v <HT TYPE="ITALIC">EMSA</HT></NAME.CASE> (<NO.CASE>C‑252/10 P</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2011:512">EU:C:2011:512</NO.ECLI></REF.DOC.ECR>), that such leeway must not prompt the contracting authority to <QUOT.START CODE="2018" ID="QS0032" REF.END="QE0032"/>amend[…] the contract award criteria set out in the contract documents or the contract notice<QUOT.END REF.START="QS0032" CODE="2019" ID="QE0032"/>.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0043"><NO.P>43.</NO.P><TXT>By confining itself to referring only to compliance with one (the first) of the three conditions listed in point 40 of this Opinion, the Court appears to wish to confer a broader discretion on the contracting authority in the ex post determination of a method for analysing or evaluating tenders only in cases where the contracting authority decides to determine weighting factors for the sub-criteria corresponding to award criteria that were made known to tenderers in advance.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0044"><NO.P>44.</NO.P><TXT>Although the case in the main proceedings called for the strict application of the clarification made in paragraph 35 of the judgment in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">Evropaïki Dynamiki</HT> v <HT TYPE="ITALIC">EMSA</HT></NAME.CASE> (<NO.CASE>C‑252/10 P</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2011:512">EU:C:2011:512</NO.ECLI></REF.DOC.ECR>), there is nothing in the information provided at this stage by the referring court that would support the view that the method of evaluation adopted by the evaluation committee to assess the <QUOT.START CODE="2018" ID="QS0033" REF.END="QE0033"/>quality<QUOT.END REF.START="QS0033" CODE="2019" ID="QE0033"/> criterion could have altered that criterion or, <HT TYPE="ITALIC">a fortiori</HT>, the second award criterion, both of which had been made known to tenderers in advance in the contract notice.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0045"><NO.P>45.</NO.P><TXT>I doubt, however, that, by the clarification it gave in paragraph 35 of the judgment in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">Evropaïki Dynamiki</HT> v <HT TYPE="ITALIC">EMSA</HT></NAME.CASE> (<NO.CASE>C‑252/10 P</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2011:512">EU:C:2011:512</NO.ECLI></REF.DOC.ECR>), in the form, moreover, of an <HT TYPE="ITALIC">obiter dictum</HT>, the Court meant to confine that restriction to the leeway enjoyed by the contracting authority in determining a method for evaluating the tenders submitted. After all, other than in the event of any particularly serious errors, it is difficult to imagine how such a method of evaluation would be capable of altering the criteria for awarding a public contract themselves or how an unsuccessful tenderer would be able to furnish so much as <HT TYPE="ITALIC">indicia</HT>, let alone actual proof, of such an effect on the award criteria.</TXT></NP.ECR><?PAGE NO="8"?><NP.ECR IDENTIFIER="NP0046"><NO.P>46.</NO.P><TXT>This is one of the reasons why I am more inclined to share the view of the interested parties which submitted, in particular at the hearing, that it is not inconceivable that a method of evaluation may have an effect not so much on the award criteria themselves as on the weighting of those criteria and, as such, may contain elements which would have been capable of influencing the preparation of tenders if that method had been made known to tenderers in advance, within the meaning of the second condition laid down by the Court’s case-law as reproduced in point 40 of this Opinion. In that event, the ex post determination of such a method for evaluating tenders by a contracting authority would be unlawful and should, therefore, have been disclosed in advance in the contract notice or the contract documents.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0047"><NO.P>47.</NO.P><TXT>I am therefore largely in agreement with the line of argument, put forward in particular by the Commission, that the lawfulness of a method for evaluating tenders which is determined by a contracting authority ex post depends on whether the three conditions established by the Court’s case-law and reproduced in point 40 above are met. It would then fall to the referring court to verify whether those conditions have been met in the case in the main proceedings.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0048"><NO.P>48.</NO.P><TXT>To my mind, however, the present case also offers the Court an opportunity to refine that case-law, particularly in relation to the scope of the first condition.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0049"><NO.P>49.</NO.P><TXT>After all, as I emphasised earlier, since the entry into force of Article 53(2) of Directive 2004/18, both the award criteria and their relative weightings (or, where they cannot be weighted, their prioritisation) must be adequately disclosed in the contract notice or the contract documents.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0050"><NO.P>50.</NO.P><TXT>The ex post alteration of either, no matter the means by which it is achieved, must therefore, in my view, be penalised in the same way.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0051"><NO.P>51.</NO.P><TXT>Just as there is no reason to accept the proposition that a method for evaluating tenders is capable of altering <HT TYPE="ITALIC">a posteriori</HT> award criteria that were communicated to tenderers in advance, the proposition that such a method is capable of altering the weighting of those criteria is equally intolerable. If this is the consequence of the ex post determination of a method for evaluating tenders, that method should have been communicated to tenderers in advance and the tendering procedure at issue is unlawful.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0052"><NO.P>52.</NO.P><TXT>Consequently, I suggest that the first condition listed in point 40 of this Opinion, derived from the Court’s case-law relating to the legal regime governing the award of public contracts that was in place prior to the adoption of Directive 2004/18, be worded in such a way as also to include the weighting of the award criteria, so as to take into account the change in that regime following the entry into force of Article 53(2) of Directive 2004/18.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0053"><NO.P>53.</NO.P><TXT>It will then be for the referring court to examine, in the case in the main proceedings, whether the method for evaluating tenders in the light of the <QUOT.START CODE="2018" ID="QS0034" REF.END="QE0034"/>quality<QUOT.END REF.START="QS0034" CODE="2019" ID="QE0034"/> criterion, set out in the documents relating to the contested contract, altered ex post the weightings attached to the award criteria for that contract. If it did, that method should have been made known to potential tenderers in advance in the contract notice or the contract documents.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0054"><NO.P>54.</NO.P><TXT>I suspect, however, that, in the light of the circumstances and information communicated by the referring court, this may have been the case.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0055"><NO.P>55.</NO.P><TXT>Since three of the four tenders, including Dimarso’s, were rated <QUOT.START CODE="2018" ID="QS0035" REF.END="QE0035"/>high<QUOT.END REF.START="QS0035" CODE="2019" ID="QE0035"/> for compliance with the <QUOT.START CODE="2018" ID="QS0036" REF.END="QE0036"/>quality<QUOT.END REF.START="QS0036" CODE="2019" ID="QE0036"/> criterion, but did not receive scores which would have made it possible to differentiate and rank the tenders according to their inherent qualities, the <QUOT.START CODE="2018" ID="QS0037" REF.END="QE0037"/>price<QUOT.END REF.START="QS0037" CODE="2019" ID="QE0037"/> criterion was therefore decisive in the award of the contested contract, as all the interested parties agreed at the hearing. In so far as the method chosen by the evaluation committee effectively downgraded the assessment of the <QUOT.START CODE="2018" ID="QS0038" REF.END="QE0038"/>quality<QUOT.END REF.START="QS0038" CODE="2019" ID="QE0038"/> criterion relative to that of the <QUOT.START CODE="2018" ID="QS0039" REF.END="QE0039"/>price<QUOT.END REF.START="QS0039" CODE="2019" ID="QE0039"/> criterion, that latter criterion seems therefore to have benefited<?PAGE NO="9"?> from a higher relative weighting in the choice of tenderer than the 50% weighting announced in the contract documents might reasonably have suggested. It is therefore plausible that, if the tenderers had been informed in advance that that was the chosen method for evaluating tenders for compliance with the <QUOT.START CODE="2018" ID="QS0040" REF.END="QE0040"/>quality<QUOT.END REF.START="QS0040" CODE="2019" ID="QE0040"/> criterion, they would have focused more effort on the price of their services.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0056"><NO.P>56.</NO.P><TXT>To illustrate my point more specifically, let us imagine that, of the tenders submitted, one was far superior, in terms of quality, to the other three, including those that were rated <QUOT.START CODE="2018" ID="QS0041" REF.END="QE0041"/>high<QUOT.END REF.START="QS0041" CODE="2019" ID="QE0041"/>. In other words, one of those tenders could have been ranked <QUOT.START CODE="2018" ID="QS0042" REF.END="QE0042"/>excellent<QUOT.END REF.START="QS0042" CODE="2019" ID="QE0042"/> in the assessment of the <QUOT.START CODE="2018" ID="QS0043" REF.END="QE0043"/>quality<QUOT.END REF.START="QS0043" CODE="2019" ID="QE0043"/> criterion. The price proposed by that tenderer would then have reflected the excellence of the quality of the services proposed by it and would therefore in all probability have been higher than the prices offered by the other tenderers. However, since <QUOT.START CODE="2018" ID="QS0044" REF.END="QE0044"/>excellent<QUOT.END REF.START="QS0044" CODE="2019" ID="QE0044"/> did not feature on the range of scores (low — satisfactory — high) chosen by the evaluation committee, that tender of excellent quality could not but be rated <QUOT.START CODE="2018" ID="QS0045" REF.END="QE0045"/>high<QUOT.END REF.START="QS0045" CODE="2019" ID="QE0045"/>, at the very most, in relation to the <QUOT.START CODE="2018" ID="QS0046" REF.END="QE0046"/>quality<QUOT.END REF.START="QS0046" CODE="2019" ID="QE0046"/> criterion. Since the price proposed by the tenderer of that bid was higher than those proposed by the others, possibly even by some tens or hundreds of euros, that bid had to be rejected.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0057"><NO.P>57.</NO.P><TXT>In short, in that situation, which is not necessarily Dimarso’s situation but might just as well have been, the contracting authority might have been deprived of the tender representing the best value for money, contrary to the spirit in which the selection of tenderers on the basis of the most economically advantageous tender takes place.<NOTE TYPE="FOOTNOTE" NUMBERING="STAR" NUMBERING.CONTINUED="YES" NOTE.ID="E0012"><P>In the judgment in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">Ambisig</HT></NAME.CASE> (<NO.CASE>C‑601/13</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2015:204">EU:C:2015:204</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0029">29</REF.NP.ECR></REF.DOC.ECR>), the Court pointed out, in essence, that the award of a contract to the most economically advantageous tender, which enables contracting authorities to seek the best value for money, tends to reinforce the importance of quality in the award criteria for public contracts.</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0058"><NO.P>58.</NO.P><TXT>Thus, the method of evaluation which the contracting authority chose ex post is, in my view, capable of having altered the weightings attached to the award criteria by lending greater weight to one criterion than to another, whereas the information available to tenderers at the time when they submitted their tenders clearly indicated that those criteria were to be assessed on the basis of the same relative weightings, namely 50% each.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0059"><NO.P>59.</NO.P><TXT>Consequently, I consider that, if a method of evaluation adopted after tenders have been submitted is capable of leading to such a result, that method should have been made known to tenderers at the time when the contracting authority published the contract notice or communicated the contract documents.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0060"><NO.P>60.</NO.P><TXT>In any event, although the Court held that the first judicial condition referred to in point 40 of this Opinion should not be extended to the weighting of award criteria, the likelihood is, in my opinion, that, if the method for evaluating tenders in the light of the <QUOT.START CODE="2018" ID="QS0047" REF.END="QE0047"/>quality<QUOT.END REF.START="QS0047" CODE="2019" ID="QE0047"/> criterion, as established by the contracting authority, had been known in advance by the potential tenderers, it would have been capable of affecting the preparation of their tenders within the meaning of the second condition listed in point 40 of this Opinion.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0061"><NO.P>61.</NO.P><TXT>After all, as I have already said, if the tenderers had realised, before submitting their tenders, that the second award criterion, namely the <QUOT.START CODE="2018" ID="QS0048" REF.END="QE0048"/>price<QUOT.END REF.START="QS0048" CODE="2019" ID="QE0048"/> criterion, might be decisive, as all the interested parties conceded at the hearing, in the choice of the economically most advantageous tender, they would certainly have prepared their tenders differently in order to respond more effectively to the guidance thus given by the contracting authority.</TXT></NP.ECR><?PAGE NO="10"?><NP.ECR IDENTIFIER="NP0062"><NO.P>62.</NO.P><TXT>In general, it is true that such a limit on the leeway enjoyed by the contracting authority in determining a method of evaluation after tenders have been submitted seems to have the ultimate effect of compelling it to identify the method or methods for evaluating award criteria which it intends to choose at a very early stage in all cases, in order to guard against the possibility that those methods will be capable of having an impact on the preparation of the bids of potential tenderers. It will otherwise be bound to conclude that those methods need to be published either in the contract notice or in the contract documents.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0063"><NO.P>63.</NO.P><TXT>In short, therefore, that requirement appears to mean that the contracting authority (to which it will fall to ensure that the tendering procedure benefits from maximum legal certainty and to protect itself against actions for the annulment of that procedure) must determine the method or methods to be used to evaluate tenders in the light of the award criteria as early as possible. It would be reasonable to suggest, then, that, if that is the case, there does not appear to be any overriding reason such as to justify a refusal by the contracting authority to make known to potential tenderers the methods of evaluation in question, which it will in any event already have had to determine before the call for tenders.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0064"><NO.P>64.</NO.P><TXT>Such an approach appears, in practice, to be a reversal of the theoretical <QUOT.START CODE="2018" ID="QS0049" REF.END="QE0049"/>exception-to-the-rule<QUOT.END REF.START="QS0049" CODE="2019" ID="QE0049"/> principle that stems from the application of the Court’s case-law to the effect that the contracting authority is not, in principle, under any obligation to communicate the method to be used to evaluate tenders in advance to potential tenderers, unless, or provided that, that method contains no elements which, had the method been known in advance, could have affected the preparation of tenders.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0065"><NO.P>65.</NO.P><TXT>It seems to me, however, that that risk can largely be mitigated if the contracting authorities opt to disclose not only the award criteria and their relative weightings, as required by Directive 2004/18, but also the sub-criteria relating to those criteria and the relative weightings of those sub-criteria, an approach which the Court’s case-law is strongly inclined to favour.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0066"><NO.P>66.</NO.P><TXT>In other words, the making available to tenderers in the contract notice or the contract documents of clear, comprehensible and detailed information on all the matters mentioned above diminishes the risk, in my view, that the method for analysing tenders chosen by the evaluation committee may be capable of altering the award criteria or sub-criteria and their weightings, or of causing tenderers to be treated unequally. To my mind, avoiding that risk is part and parcel of the <QUOT.START CODE="2018" ID="QS0050" REF.END="QE0050"/>active role<QUOT.END REF.START="QS0050" CODE="2019" ID="QE0050"/> which Directive 2004/18, as interpreted by the Court, assigns to the contracting authorities in the application of the essential principles governing the award of public contracts, that is to say observance of the transparency of the procedure and equal treatment as between tenderers.<NOTE TYPE="FOOTNOTE" NUMBERING="STAR" NUMBERING.CONTINUED="YES" NOTE.ID="E0013"><P>See, in that regard, in another context, the judgment in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">eVigilo</HT></NAME.CASE> (<NO.CASE>C‑538/13</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2015:166">EU:C:2015:166</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0042">42</REF.NP.ECR></REF.DOC.ECR>).</P></NOTE></TXT></NP.ECR><NP.ECR IDENTIFIER="NP0067"><NO.P>67.</NO.P><TXT>The further point must be made that, in such circumstances, the tenderers will all have had an opportunity to know in advance the relative weightings of all of the matters taken into consideration by the contracting authority. As a rule, this serves to ensure that the specific method of analysing tenders adopted by the contracting authority does not contain any elements which, had they been known at the time when the tenders were prepared, could have affected their preparation.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0068"><NO.P>68.</NO.P><TXT>However, where, as in the case in the main proceedings, the award criteria are weighted equally in the contract documents, any sub-criteria listed in those documents are not weighted and the method of evaluation adopted, after tenders were submitted, for the purposes of assessing whether either of the two award criteria has been met is highly generic and does not allow a sufficiently precise distinction to be drawn between the quality of one tender submitted and another, there is a significantly greater risk that the method of evaluation would have been capable of affecting the preparation of the tenderers’ bids if it had been made known to them in the contract notice or the contract documents.</TXT></NP.ECR><?PAGE NO="11"?><NP.ECR IDENTIFIER="NP0069"><NO.P>69.</NO.P><TXT>It is true that the second condition referred to in point 40 of the present Opinion seems to be particularly flexible and easily met, since there would always appear to be scope for arguing that each element taken into account by the contracting authority would have been <HT TYPE="ITALIC">capable</HT> of having an effect or impact on the preparation of tenders if it had been communicated to tenderers in advance.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0070"><NO.P>70.</NO.P><TXT>It was perhaps its awareness of that flexibility which prompted the Court, in the judgment in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">Commission</HT> v <HT TYPE="ITALIC">Ireland</HT></NAME.CASE> (<NO.CASE>C‑226/09</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2010:697">EU:C:2010:697</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0048">48</REF.NP.ECR></REF.DOC.ECR>), to make the existence of such an effect on the preparation of tenders subject to its being <QUOT.START CODE="2018" ID="QS0051" REF.END="QE0051"/>significant<QUOT.END REF.START="QS0051" CODE="2019" ID="QE0051"/>, a condition which enabled it to dismiss in part the action for annulment brought by the Commission.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0071"><NO.P>71.</NO.P><TXT>Although paragraph 48 of the judgment in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">Commission</HT> v <HT TYPE="ITALIC">Ireland</HT></NAME.CASE> (<NO.CASE>C‑226/09</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2010:697">EU:C:2010:697</NO.ECLI></REF.DOC.ECR>) claims to be of a piece with the Court’s earlier case-law, inasmuch as it refers explicitly to paragraph 32 of the judgment in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">ATI EAC e Viaggi di Maio and Others</HT></NAME.CASE> (<NO.CASE>C‑331/04</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2005:718">EU:C:2005:718</NO.ECLI></REF.DOC.ECR>), that judgment, like the other later judgments already cited, does not specify that the effect on the preparation of tenders should have been <QUOT.START CODE="2018" ID="QS0052" REF.END="QE0052"/>significant<QUOT.END REF.START="QS0052" CODE="2019" ID="QE0052"/>. That said, the criterion introduced by the Court in paragraph 48 of the judgment in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">Commission</HT> v <HT TYPE="ITALIC">Ireland</HT></NAME.CASE> (<NO.CASE>C‑226/09</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2010:697">EU:C:2010:697</NO.ECLI></REF.DOC.ECR>) may nonetheless stem, in my view, from the fact that the public service contract in question was not fully governed by the provisions of Directive 2004/18, in particular Article 53(2).</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0072"><NO.P>72.</NO.P><TXT>If that is indeed the sense to be ascribed to paragraph 48 of the judgment in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">Commission</HT> v <HT TYPE="ITALIC">Ireland</HT></NAME.CASE> (<NO.CASE>C‑226/09</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2010:697">EU:C:2010:697</NO.ECLI></REF.DOC.ECR>), there is, as I see it, no particular reason, in the present case, to adopt the criterion of the <QUOT.START CODE="2018" ID="QS0053" REF.END="QE0053"/>significance<QUOT.END REF.START="QS0053" CODE="2019" ID="QE0053"/> of the effect on the preparation of tenders contained in that paragraph of the aforementioned judgment, or, therefore, to alter the scope of the second condition laid down in the Court’s case-law, referred to in point 40 of this Opinion.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0073"><NO.P>73.</NO.P><TXT>In any event, it is my view that the flexibility of that second condition may be greatly mitigated by the obligation incumbent on the unsuccessful tenderer, which bears the burden of proof, to demonstrate, by reference to specific examples in its legal action, the differences (substantive as well as purely formal) which its tender would have exhibited if the elements of the method of evaluation in question or the method itself, which the contracting authority neglected to communicate, had been adequately disclosed before the tenders were prepared.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0074"><NO.P>74.</NO.P><TXT>Before concluding, I would add that all of the foregoing considerations are based on the assumption, which follows implicitly from the order for reference, that the method of evaluating tenders in relation to the <QUOT.START CODE="2018" ID="QS0054" REF.END="QE0054"/>quality<QUOT.END REF.START="QS0054" CODE="2019" ID="QE0054"/> criterion which was used by the evaluation committee in the case in the main proceedings was determined <HT TYPE="ITALIC">after</HT> the time limit for the submission of tenders expired but <HT TYPE="ITALIC">before</HT> those tenders were opened.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0075"><NO.P>75.</NO.P><TXT>In the aforementioned case-law concerning the determination of the weighting of sub-criteria relating to the award criteria, the Court held, in essence, that determining the weighting of such sub-criteria <HT TYPE="ITALIC">after the opening of tenders</HT> or expressions of interest, as the case may be, was contrary in particular to the principle of equal treatment and the obligation of transparency.<NOTE TYPE="FOOTNOTE" NUMBERING="STAR" NUMBERING.CONTINUED="YES" NOTE.ID="E0014"><P>See, in particular, the judgment in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">Lianakis and Others</HT></NAME.CASE> (<NO.CASE>C‑532/06</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2008:40">EU:C:2008:40</NO.ECLI>, paragraph <REF.NP.ECR REF="NP0044">44</REF.NP.ECR></REF.DOC.ECR>).</P></NOTE> Furthermore, the Court censured the alteration which an evaluation committee had made to the weighted values of the award criteria after an initial review of the tenders in a case where Article 53(2) of Directive 2004/18 did not apply to the public service contract in question, and did so, moreover, without requiring that the discriminatory effect of that practice on one of the tenderers should be demonstrated, pointing out further in this regard that it is sufficient that it cannot be ruled out that, at the time the alteration was made, it might have had such an effect.<NOTE TYPE="FOOTNOTE" NUMBERING="STAR" NUMBERING.CONTINUED="YES" NOTE.ID="E0015"><P>Judgment in <REF.DOC.ECR><NAME.CASE><HT TYPE="ITALIC">Commission</HT> v <HT TYPE="ITALIC">Ireland</HT></NAME.CASE> (<NO.CASE>C‑226/09</NO.CASE>, <NO.ECLI ECLI="ECLI:EU:C:2010:697">EU:C:2010:697</NO.ECLI>, paragraphs <REF.NP.ECR REF="NP0057">57</REF.NP.ECR> to <REF.NP.ECR REF="NP0063">63</REF.NP.ECR></REF.DOC.ECR>).</P></NOTE></TXT></NP.ECR><?PAGE NO="12"?><NP.ECR IDENTIFIER="NP0076"><NO.P>76.</NO.P><TXT>After all, if the contracting authority took note of the identity of the tenderers and of the content of the tenders when altering the weightings of the award criteria and/or sub-criteria, it runs a genuine risk of giving the impression that that alteration seeks to favour one of the tenderers and therefore to breach the equal treatment afforded to them.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0077"><NO.P>77.</NO.P><TXT>In such a situation, any alteration made in this way is quite simply unlawful, not least on the ground of being presumed to constitute favouritism. It seems clear that the weighting which was actually applied and which rendered the tendering procedure unlawful should have been made known to the tenderers in the contract documentation. Such a finding, however, is not essential to the resolution of the dispute.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0078"><NO.P>78.</NO.P><TXT>In its observations, the Belgian Government mentioned that there are some situations, although it did not say which, where the method of evaluating tenders may be determined only after the tenders have been opened. Consequently, that government submits in essence that the Court’s case-law censuring the ex post determination of the weighting of award criteria and determination of the weightings applied to the sub-criteria relating to those award criteria <HT TYPE="ITALIC">after</HT> the tenders have been opened should not be extended to the situation in which an evaluation committee adopts a method of evaluating tenders after these have been opened.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0079"><NO.P>79.</NO.P><TXT>The question referred by the national court does not relate <HT TYPE="ITALIC">stricto sensu</HT> to that situation.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0080"><NO.P>80.</NO.P><TXT>However, the information provided by the referring court does not entirely rule out the possibility that the method of evaluation at issue in the case in the main proceedings was established after the tenders were opened.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0081"><NO.P>81.</NO.P><TXT>That possibility raises the further question, in my view, of whether the referring court still needs to verify that the three conditions laid down by case-law and listed in point 40 of the present Opinion are satisfied in order to be able to conclude that the contracting authority should have made that method of evaluation known to the tenderers or whether it could simply find that such a practice can to some extent be presumed to constitute favouritism towards one or more tenderers and, as such, render the tendering procedure unlawful.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0082"><NO.P>82.</NO.P><TXT>Without taking a general view on the situations alluded to but not specified by the Belgian Government, I doubt that, in the case in the main proceedings, the method for evaluating the <QUOT.START CODE="2018" ID="QS0055" REF.END="QE0055"/>quality<QUOT.END REF.START="QS0055" CODE="2019" ID="QE0055"/> criterion, given its very basic and highly generic — not to say imprecise — nature, could be determined only after the tenders submitted had been opened.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0083"><NO.P>83.</NO.P><TXT>I can see no reason, not least of a technical or financial order, why a contracting authority should not be able either to make known to tenderers a method which simply states that the <QUOT.START CODE="2018" ID="QS0056" REF.END="QE0056"/>quality<QUOT.END REF.START="QS0056" CODE="2019" ID="QE0056"/> of the tenders will be assessed on the basis of a ranking scale of <QUOT.START CODE="2018" ID="QS0057" REF.END="QE0057"/>low — satisfactory — high<QUOT.END REF.START="QS0057" CODE="2019" ID="QE0057"/>, or to establish that method, at the latest, before the tenders are opened, provided that it complies with the conditions which I have already examined, that is to say, in particular, without altering the contract award criteria or their weightings.</TXT></NP.ECR><NP.ECR IDENTIFIER="NP0084"><NO.P>84.</NO.P><TXT>I therefore take the view that, if the method of evaluation at issue in the case in the main proceedings was adopted after the tenders were opened, which it would fall to the national court to verify, it would have to be presumed that that method was determined in the light of matters capable of having a discriminatory effect on one or more of the unsuccessful tenderers, which presumption, if appropriate, would have to be rebutted by the contracting authority.</TXT></NP.ECR></GR.SEQ><?PAGE NO="13"?><GR.SEQ LEVEL="1"><TITLE><TI><NP><NO.P><HT TYPE="BOLD">III –</HT></NO.P><TXT><HT TYPE="BOLD">Conclusion</HT></TXT></NP></TI></TITLE><NP.ECR IDENTIFIER="NP0085"><NO.P>85.</NO.P><TXT>In the light of all of the foregoing considerations, I propose that the Court’s answer to the question referred by the Raad van State van België (Belgian Council of State) should be as follows:</TXT><P>Article 53(2) of Directive 2004/18/EC of the European Parliament and of the Council of <DATE ISO="20040331">31 March 2004</DATE> on the coordination of procedures for the award of public works contracts, public supply contracts and public service contracts, as amended by Commission Regulation (EU) No 1251/2011 of <DATE ISO="20111130">30 November 2011</DATE>, read in the light of the principle of equal treatment and the obligation of transparency, must be interpreted as meaning that the contracting authority is not required to make known to potential tenderers, in the contract notice or the contract documents, the method to be used to evaluate tenders with a view to assessing whether the award criteria published in advance in the contract notice or the contract documents have been met, provided that such a method, adopted after the time limit for the submission of tenders has expired but before those tenders are opened, (a) does not alter the contract award criteria and the relative weightings of those criteria as set out in the contract notice or the contract documents, (b) contains no elements which, had they been known at the time when the tenders were prepared, could have affected their preparation, and (c) was not adopted in the light of matters capable of having a discriminatory effect on one of the tenderers. It is for the national court to verify whether those conditions are met in the case in the main proceedings.</P></NP.ECR></GR.SEQ></CONTENTS.CONCLUSION></CONCLUSION>