02007D0509 — EN — 19.07.2007 — 000.001
This text is meant purely as a documentation tool and has no legal effect. The Union's institutions do not assume any liability for its contents. The authentic versions of the relevant acts, including their preambles, are those published in the Official Journal of the European Union and available in EUR-Lex. Those official texts are directly accessible through the links embedded in this document
|
COMMISSION DECISION of 20 December 2006 on State aid No C 3/2005 (ex N 592/2004 (ex PL 51/2004)) which Poland is planning to implement for Fabryka Samochodow Osobowych SA (formerly DAEWOO — FSO Motor SA) (notified under document number C(2006) 6628) (Only the Polish text is authentic) (Text with EEA relevance) (OJ L 187 19.7.2007, p. 30) |
Corrected by:
COMMISSION DECISION
of 20 December 2006
on State aid No C 3/2005 (ex N 592/2004 (ex PL 51/2004)) which Poland is planning to implement for Fabryka Samochodow Osobowych SA (formerly DAEWOO — FSO Motor SA)
(notified under document number C(2006) 6628)
(Only the Polish text is authentic)
(Text with EEA relevance)
(2007/509/EC)
Article 1
The aid measures listed in Table 4, some of which Poland has already partially or fully implemented and some of which Poland has not yet implemented, for Fabryka Samochodow Osobowych are compatible with the common market, subject to the obligations and conditions set out in Article 2.
Article 2
Article 3
Poland shall inform the Commission, within two months of notification of this Decision, of the measures taken to comply with it.
Article 4
This Decision is addressed to the Republic of Poland.
( 1 ) OJ C 100, 26.4.2005, p. 2.
( 2 ) See footnote 1.
( *1 ) Confidential information.
( 3 ) For information only, all the amounts provided by the Polish authorities in Polish zloty (PLN) have been converted into euro (EUR) using the exchange rate of 20 October 2006, namely 1 EUR = 3,89 PLN.
( 4 ) According to a press release dated 10 January 2006, published on its website (www.ukravto.ua), ZAZ produced 148 163 vehicles in 2005. Including 10 190 models ‘Travria’, 6 224 ‘Travria Pick-Up’, 20 864 ‘Slavuta’, 21 379 ‘Sens’, 9 107 ‘Lanos T-150’, 697 ‘Opel Astra-H’, 1 915 ‘Opel CKD’, 6 179 ‘VAZ-21093’, 14 459 ‘VAZ-21099’ and 57 149 other vehicles.
( 5 ) Formally, the contract is between the State Treasury of the Republic of Poland and Zakrytoje Akcjonernoje Obszczestwo z Inostrannoj Inwesticjej ‘Zaporozskij Awtomobilestroitelnyj Zawod’ with its headquarters in Zaporozhye, Ukraine.
( 6 ) The data used in this section are taken from information provided by the Polish authorities.
( 7 ) Letter from the Polish authorities of 13 June 2005.
( 8 ) All amounts provided by the Polish authorities in US dollars (USD) have been converted into euro (EUR) using the exchange rate of 20 October 2006 of 1 EUR = 1,26 USD.
( 9 ) The Polish authorities informed the Commission that the planned guarantee had been revised downwards in their letter of 3 January 2006. The aid measures listed in the decision to launch the investigation procedure were based on the notification of 30 April 2004. The notification contained a plan for a guarantee of USD 162,5 million.
( 10 ) Measures 22 and 23 were omitted in the submission of information of 3 January 2006. They are, however, presented in the decision of 19 January 2005 to initiate the procedure provided for in Article 88(2) of the EC Treaty. As the Commission has not received any details on their withdrawal, it has decided to take them into account.
( 11 ) OJ C 244, 1.10.2004, p. 2.
( 12 ) OJ C 288, 9.10.1999, p. 2.
( 13 ) This is confirmed in the judgment of the Court of First Instance in Case T-17/03 Schmitz-Gotha Fahrzeugwerke GmbH [2006] ECR II-1139, paragraphs 44 and 45.
(44) Point 3.2.2 of the Guidelines, which lays down that requirement, stipulates, in particular, that the restructuring plan must fulfil three material conditions. It is essential, first, that it restore the viability of the beneficiary firm within a reasonable timescale and on the basis of realistic assumptions (point 3.2.2(i)); second, that it avoid undue distortions of competition (point 3.2.2(ii)); and, third, that it be in proportion to the restructuring costs and benefits (point 3.2.2(iii)).
(45) As those conditions are cumulative, the Commission must declare a restructuring aid plan to be incompatible if even one of those conditions has not been satisfied (Case T-171/02 Regione autonoma della Sardegna v Commission [2005] II-0000, paragraph 128; see also, to that effect, France v Commission, cited above, paragraphs 49 and 50).
( 14 ) In their letter of 6 April 2006, the Polish authorities indicate that ‘As a rule, the granting of a licence is closely linked with closer cooperation between the licensor and the licensee. This involves transfer of know-how, manufacturing technologies, technical support, development of research and development processes, quality control, but also joint measures aimed at localising the production of assemblies and components. If the licensee is successful in implementing the terms and conditions of the licensing agreement, subsequent joint projects may be launched […].’ From the foregoing, it is clear that over the long term, FSO expects to be involved more deeply in the development of new products. However, that concerns the very long term and implies a number of conditions, the fulfilment of which is at this stage hypothetical. The Commission will therefore base its analysis on the premise that FSO remains an independent manufacturer.
( 15 ) Producing within the EU to serve the EU market avoids customs duties and limits the transport costs. Therefore large car manufacturers consider the production plants operating within the EU to be more substitutable — and therefore in fiercer competition with each other — than production plants operating both within and outside the EU.
( 16 ) Indeed, the intense competition is likely to force the major car manufacturer producing its cars at FSO to reflect the lower costs in a lower sales price.
( 17 ) On the basis of the amended forecasts submitted on 3 October 2006, this measure would only be a constraint in 2008.
( 18 ) Production must be limited to 25 000 units in the first two months of 2011.
( 19 ) Including new Member States when they join the EU.
( 20 ) Sales in the EU must be limited to 17 833 units in the first two months of 2011.
( 21 ) The restraining effect is limited to two years and two months when the production forecasts set out in Table 5 are used. If the increased forecasts included in the letter of 3 October 2006 are used, the restraining effect is limited to three years and two months.
( *2 ) Clerical error — should be ‘billion’.