Brussels, 17.12.2025

SWD(2025) 428 final

COMMISSION STAFF WORKING DOCUMENT

Updated climate tracking and digital tagging of the Recovery and Resilience Plan of Ireland

Accompanying the document

Proposal for a COUNCIL IMPLEMENTING DECISION

amending the Implementing Decision of 8 September 2021 on the approval of the assessment of the recovery and resilience plan for Ireland

{COM(2025) 788 final}


Executive summary 

The modifications submitted by Ireland under Article 21(1) of Regulation (EU) 2021/241 affect 20 measures in total. Ireland requested to modify five measures due to objective circumstances.

Based on the assessment of the submitted modification and the REPowerEU chapter, the Irish modified plan receives an A-rating on all criteria except for costing, where the plan receives a B-rating (unchanged from the original plan assessment).

(1)
Balanced Response

(2)
CSRs

(3)
Growth, jobs…

(4)
 DNSH

(5)
Green target

(6)
Digital target

(7)
 Lasting impact

(8)
 M & T

(9)
Costing

(10)
 Control Systems

(11)
Coherence

(12) REPowerEU

(13) Cross-border

A

A

A

A

A

A

A

A

B

A

A

A

A



Updated climate tracking and digital tagging of the recovery and resilience plan of Ireland

The table below presents the detailed application of the climate tracking and digital tagging methodologies set out respectively in Annexes VI and VII to Regulation (EU) 2021/241 in the modified Irish recovery and resilience plan.

Int. Field = intervention field.

Coeff. = Coefficient for the calculation of support to climate change objectives and to digital transition, on the basis of Annex VI and Annex VII of the RRF Regulation.

New or revised measures are marked in yellow to distinguish them from the unchanged measures in the RRP.

Climate

Digital

Measure/ Sub-Measure ID

Measure/Sub-Measure Name

Budget (EUR m)

Int. Field

Coeff. %

Int. Field

Coeff. %

IE-C[C1]-I[I3]

1.3 Public Sector Retrofit Pathfinder Project

44.64

026bis

100%

-

0%

IE-C[C1]-I[I3.1]

1.3.1 Public Sector Buildings' Energy Retrofit Programme

21.09

026bis

100%

-

0%

IE-C[C1]-I[I4]

1.4 Future Electrification Through Targeted Investment in Cork Commuter Rail

206.06

069bis

100%

-

0%

IE-C[C1]-I[I5.1]

1.5 National Grand Challenge (i)

28.15

022

100%

-

0%

IE-C[C1]-I[I5.2]

1.5 National Grand Challenge (ii)

22.61

-

0%

009bis

100%

IE-C[C1]-I[I5.3]

1.5 National Grand Challenge (iii)

11.21

047

40%

-

0%

IE-C[C1]-I[I5.4]

1.5 National Grand Challenge (iv)

9.64

050

40%

-

0%

IE-C[C1]-I[I6]

1.6 Enhanced Rehabilitation of Peatlands

85.68

050

40%

-

0%

IE-C[C2]-I[I1]

2.1 Construction of a shared Government Data Centre

70.08

055bis

40%

055bis

100%

IE-C[C2]-I[I2]

2.2 Digital Transformation of Irish Enterprise

36.00

-

0%

010

100%

IE-C[C2]-I[I3.1]

2.3 Digital Infrastructure and Funding to Schools (i) - Connectivity

13.50

-

0%

012

100%

IE-C[C2]-I[I3.2]

2.3 Digital Infrastructure and Funding to Schools (ii) - ICT infrastructure

50.00

-

0%

012

100%

IE-C[C2]-I[I4]

2.4 Online Response Option for the Census

9.70

-

0%

011

100%

IE-C[C2]-I[I5]

2.5 Installation of compute nodes

18.70

-

0%

054bis

100%

IE-C[C2]-I[I6]

2.6 Suite of e-health projects

75.00

-

0%

095

100%

IE-C[C3]-I[I2.1]

3.2 SOLAS Green Skills Action Programme (i) - green skills action programme

4.56

01

100%

-

0%

IE-C[C5].I[I2]

5.2 Drogheda Charging Infrastructure

56.00

069bis

100%

-

0%

IE-C[C5].I[I3]

5.3 HSE Pilot Energy and Decarbonisation Pathfinder

48.05

026bis

100%

-

0%

IE-C[C5].I[I4.1]

5.4 (i) Expanded School Sector Pathfinder and Decarbonisation Programme and Energy Profile Inventory of Schools

122.6

026bis

100%

-

0%

IE-C[C5].I[I5]

5.5 Retfrofit of No. 6 Ely Place

15.00

026bis

100%

-

0%